← Back
BuildNYC
Walk-up cooperative
141 ATTORNEY STREET
MANHATTAN · Lower East Side · BIN 1004119
💬 Discuss this project
1920Year Built
6Stories
C6Building Class
R7AZoning
18,753 sfGross Floor Area
21Units
Rent Stabilized36 Active Violations 35 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · 3,500 sf lot · 5.36 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEgress stair renovation and interior design5p · 1 filing · 3 docs
Floor 6Egress stair renovation and interior design4p · 1 filing · 3 docs
Floor 5Egress stair renovation and interior design5p · 1 filing · 3 docs
Floor 4Egress stair renovation and interior design4p · 1 filing · 3 docs
Floor 3Egress stair renovation and interior design4p · 1 filing · 3 docs
Floor 2Egress stair renovation and interior design4p · 1 filing · 3 docs
Floor 1Egress stair renovation and interior design4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development403/21/2026
Totah403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zambrano Architectural110/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BSD Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kwong Ming ElectricElectrical103/21/2026
Norway ElectricElectrical103/21/2026
HI-Rite BuildersGeneral Contractor107/08/2026
Building Lifecycle
05/14/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/06/2025
Boiler inspection report filed
Initial · no defects · Accepted
05/23/2024
Boiler inspection report filed
Initial · no defects · Accepted
06/22/2023
Boiler inspection report filed
Initial · no defects · Accepted
03/21/2023
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 4th STORY, 2nd APARTMENT FROM EAST AT…
HPD violation · open
85 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHI-Rite Builders01/25/2022
BISPLISSUEDTop Plumbing Group12/11/2015
BISMHISSUEDBrian Ill Development09/22/2015
BISEQISSUEDBrian Ill Development09/22/2015
BISOTISSUEDKinsun Construction Consulting06/18/2015
BISEQISSUEDIntegrated Construction Services04/01/2014
BISOTISSUEDIntegrated Construction Services04/01/2014
BISEQISSUEDRockledge Scaffold04/01/2014
BISOTISSUEDIntegrated Construction Services08/21/2013
BISEQISSUEDIntegrated Construction Services06/10/2013
BISEQISSUEDRockledge Scaffold04/19/2013
BISOTISSUEDConstruction Management09/21/2010
BISEQISSUEDRock Scaffolding11/23/2009
BISEQISSUEDM.S.S. Construction11/23/2009
BISPLISSUEDFirst Choice Plumbing04/21/2009
BISOTISSUEDR.T.N. Contracting03/30/2009
BISOTISSUEDR.T.N. Contracting03/17/2009
BISOTISSUEDJCS Consultants07/02/2004
BISFPISSUEDActive Fire Cntrol Co01/08/2001
BISPLISSUEDQuinn Plumbing & Heating05/24/2000
BISOTISSUEDKorman Design & Build05/08/2000
BISEQISSUEDKorman Design & Build05/08/2000
BISOTISSUEDInternational04/07/1999
BIS—ISSUEDGreat Waterproofing Construction04/15/1997
BISOTISSUEDGRT Waterproffing & Construction01/17/1997
BIS—ISSUEDRuvas Painting12/16/1993
BISPLISSUEDF & G PLG and Heating02/09/1993
BIS—ISSUEDRuvas Painting01/27/1993
BIS—ISSUEDHoward Construction10/19/1990
BISBLISSUEDAmerican Auto Matrix07/03/1990
Nothing on file for this building.
Nothing on file for this building.
179 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account