← Back
Three families
141 BAY 32 STREET
BROOKLYN · BIN 3168092
💬 Discuss this project
1915Year Built
2.5Stories
C0Building Class
R5Zoning
2,568 sfGross Floor Area
3Units
Rent Stabilized18 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 141 BAY 32 ST LLC · 5,800 sf lot · 0.44 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalGeneral
Roof3p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 44p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
141 BAY 32 ST1009/13/2026
OWNER OF 139 BAY 31 STREE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/02/2020$2.0M—— → —$798/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EJC ENGINEERING, PLLC306/25/2026
JUST CONSULTING ENGINEERING305/11/2026
S M TAM ARCHITECT, PLLC303/03/2026
Building Lifecycle
All (72)Filed (9)Violation (19)Objection (14)Special Inspection (30)
08/31/2026
Special inspection requirement — Structural Steel - Details
08/31/2026
Special inspection requirement — Masonry
08/31/2026
Special inspection requirement — Structural Steel - Welding
08/31/2026
Special inspection requirement — Structural Steel - High Strength Bolting
08/31/2026
Special inspection requirement — Final
08/31/2026
Special inspection requirement — Concrete - Cast-In-Place
07/28/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/02/2026
Objection raised — Energy
06/30/2026
Objection raised — Energy
06/25/2026
Filed — New Building
PROPOSED NEW 4-STORY RESIDENTIAL AND COMMUNITY FACILITY BUILDING WITH CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01215534-S5
06/25/2026
Filed — New Building
PROPOSED NEW 4-STORY RESIDENTIAL AND COMMUNITY FACILITY BUILDING WITH CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01215534-S4
06/25/2026
Special inspection requirement — Shutoff dampers
06/25/2026
Special inspection requirement — Heating Systems
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/25/2026
Special inspection requirement — Ventilation and air distribution system
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/25/2026
Special inspection requirement — Maintenance information
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/25/2026
Special inspection requirement — Maintenance information
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/11/2026
Filed — New Building
PROPOSED NEW 4-STORY RESIDENTIAL AND COMMUNITY FACILITY BUILDING WITH CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01215534-S2
05/11/2026
Filed — New Building
PROPOSED NEW 4-STORY RESIDENTIAL AND COMMUNITY FACILITY BUILDING WITH CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01215534-S1
05/11/2026
Filed — New Building
PROPOSED NEW 4-STORY RESIDENTIAL AND COMMUNITY FACILITY BUILDING WITH CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01215534-S3
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
05/07/2026
Objection resolved — Addressed
05/05/2026
Objection raised — Scope
05/01/2026
Violation issued (HPD, open)
A
04/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/25/2026
Special inspection requirement — Subgrade Inspections
04/25/2026
Special inspection requirement — Structural Steel - Details
04/24/2026
Filed — New Building
PROPOSED NEW 4-STORY RESIDENTIAL AND COMMUNITY FACILITY BUILDING WITH CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01215534-S6
04/24/2026
Special inspection requirement — Mechanical Systems
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/24/2026
Special inspection requirement — Post-installed Anchors
04/24/2026
Special inspection requirement — Sprinkler Systems
04/24/2026
Special inspection requirement — Final
03/13/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/03/2026
Filed — Alteration
PROPOSED TEMPORARY CONSTRUCTION FENCE @ GROUND FLOOR FOR DEMOLITION & NEW BUILDING #B01215534-I1. THE FENCE EXTENDS NO MORE THAN 3 FEET BEYOND THE PROPERTY LINE.
B01349689-P1
01/27/2026
Filed — Alteration
PROPOSED TEMPORARY CONSTRUCTION FENCE @ GROUND FLOOR FOR DEMOLITION & NEW BUILDING #B01215534-I1. THE FENCE EXTENDS NO MORE THAN 3 FEET BEYOND THE PROPERTY LINE.
B01349689-I1
11/19/2025
Violation issued (HPD, open)
I
10/29/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Other
08/19/2025
Objection raised — Structural
08/19/2025
Objection raised — Energy
08/19/2025
Objection raised — Other
08/01/2025
Filed — New Building
PROPOSED NEW 4-STORY RESIDENTIAL AND COMMUNITY FACILITY BUILDING WITH CELLAR. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01215534-I1
06/06/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/08/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
03/21/2023
Violation issued (HPD, open)
A
Latest 60 of 72 events.
Nothing on file for this building.
1 project · most recent 06/25/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
06/25/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 06/25/2026
Sprinkler System
FiledStatusContractorScope
06/25/2026——Sprinkler System
1 project · most recent 06/25/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/25/2026——Storm, Water/Sanitary
1 project · most recent 06/25/2026
Concrete
FiledStatusContractorScope
06/25/2026——Concrete
1 project · most recent 03/03/2026
Fence
FiledStatusContractorScope
03/03/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
08/31/2026Structural Steel - Details—special
08/31/2026Masonry—special
08/31/2026Structural Steel - Welding—special
08/31/2026Structural Steel - High Strength Bolting—special
08/31/2026Final—progress
08/31/2026Concrete - Cast-In-Place—special
06/25/2026Shutoff dampers—energy_progress
06/25/2026Heating Systems—special
06/25/2026Fire-Resistant Penetrations and Joints—special
06/25/2026HVAC-R and service water heating system controls—energy_progress
06/25/2026Ventilation and air distribution system—energy_progress
06/25/2026HVAC-R and service water piping design and insulation—energy_progress
06/25/2026Maintenance information—energy_progress
06/25/2026HVAC-R and service water heating equipment—energy_progress
06/25/2026HVAC-R and service water heating system controls—energy_progress
06/25/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/25/2026HVAC-R and service water piping design and insulation—energy_progress
06/25/2026Maintenance information—energy_progress
06/25/2026HVAC-R and service water heating equipment—energy_progress
06/25/2026Fire-Resistant Penetrations and Joints—special
05/11/2026Concrete - Cast-In-Place—special
04/25/2026Excavations - Sheeting, Shoring, and Bracing—special
04/25/2026Subgrade Inspections—special
04/25/2026Structural Steel - Details—special
04/24/2026Mechanical Systems—special
Latest 25 of 53.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/18/2026B01349689-P1Request digital key ↗
08/18/2026B01349689-I1Request digital key ↗
08/17/2026B01215534-S3Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01215534-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01215534-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01215534-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/18/2026B01349689-I1Open ↗
08/18/2026B01349689-P1Open ↗
08/17/2026B01215534-S4Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01215534-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01215534-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01215534-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/17/2026B01215534-S1Open ↗
08/13/2026B01215534-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026B01215534-S1Open ↗
▸DOB NOWTR4: Test Report and Plot Diagram1
08/13/2026B01215534-S1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01215534-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01215534-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01215534-I1Open ↗