← Back
STATEN ISLAND
141 DUTCHESS AVENUE
STATEN ISLAND · BIN 5022603
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TERRA PRETA ARCHITECTS103/27/2026
Building Lifecycle
All (31)Filed (1)Violation (1)Objection (6)Special Inspection (23)
08/28/2026
Objection raised — Cost
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection raised — Structural
08/28/2026
Objection resolved — Resolved
06/24/2026
Objection resolved — Resolved
05/07/2026
Objection raised — Scope
03/27/2026
Filed — Alteration
ONE STORY AND CELLAR REAR ADDITION TO EXISTING ONE FAMILY RRESIDENCE TOTALLING 650 SQUARE FEET.
S01343370-I1
01/08/2026
Special inspection requirement — Interior lighting power
01/08/2026
Special inspection requirement — Fenestration areas
01/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/08/2026
Special inspection requirement — Permanent certificate
01/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/08/2026
Special inspection requirement — Insulation placement and R values
01/08/2026
Special inspection requirement — Fenestration air leakage
01/08/2026
Special inspection requirement — Protection of exposed foundation insulation
01/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
01/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
01/08/2026
Special inspection requirement — Maintenance information
01/08/2026
Special inspection requirement — Air barrier - visual inspection
01/08/2026
Special inspection requirement — Metering
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/07/2026
Special inspection requirement — Subgrade Inspections
01/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/07/2026
Special inspection requirement — Concrete - Cast-In-Place
01/07/2026
Special inspection requirement — Energy Code Compliance Inspections
George Turner
01/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
George Turner
01/07/2026
Special inspection requirement — Final
01/07/2026
Special inspection requirement — Footing and Foundation
09/26/2005
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 03/27/2026
FiledStatusContractorScope
03/27/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
01/08/2026Interior lighting power—energy_progress
01/08/2026Fenestration areas—energy_progress
01/08/2026HVAC-R and service water piping design and insulation—energy_progress
01/08/2026Permanent certificate—energy_progress
01/08/2026HVAC-R and service water heating equipment—energy_progress
01/08/2026Insulation placement and R values—energy_progress
01/08/2026Fenestration air leakage—energy_progress
01/08/2026Protection of exposed foundation insulation—energy_progress
01/08/2026HVAC-R and service water heating system controls—energy_progress
01/08/2026Fenestration and door U-factor and product ratings—energy_progress
01/08/2026Subsurface Investigations (Borings/Test Pits)—special
01/08/2026Maintenance information—energy_progress
01/08/2026Air barrier - visual inspection—energy_progress
01/08/2026Metering—energy_progress
01/07/2026Fire-Resistant Penetrations and Joints—special
01/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/07/2026Subgrade Inspections—special
01/07/2026Structural Stability – Alterations of existing buildings—special
01/07/2026Concrete - Cast-In-Place—special
01/07/2026Energy Code Compliance InspectionsGeorge Turnerprogress
01/07/2026Fire-Resistance Rated ConstructionGeorge Turnerprogress
01/07/2026Final—progress
01/07/2026Footing and Foundation—progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026S01343370-I1Request digital key ↗
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
07/03/2025540267209Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026S01343370-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026S01343370-I1Open ↗
▸Seals & Professional Certifications2
▸BISAPPLICANT OWNER SIGNATURE1
07/01/2025540267209Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01343370-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026S01343370-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026S01343370-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/01/2025540267209Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/15/2026S01343370-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026S01343370-I1Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026S01343370-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/03/2025540267209Open ↗
▸Other Documents5
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/03/2025540267209Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
07/03/2025540267209Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026S01343370-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026S01343370-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026S01343370-I1Open ↗