← Back
Over six families without stores
141 METROPOLITAN AVENUE
BROOKLYN · Williamsburg · BIN 3062404
💬 Discuss this project
2018Year Built
4Stories
C1Building Class
M1-2/R6AZoning
5,134 sfGross Floor Area
7Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: MOJO ON METRO LLC · 1,940 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Floor 21p · 1 filing · 17 docs
Floor 19p · 1 filing · 15 docs
Site & exterior9p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS703/22/2026
MOJO ON METRO LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROYAL ENGINEERING, P.C210/24/2018
HAIDER ENGINEERING, P.E.209/07/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAIDER ENGINEERING, P.E.203/21/2026
HAIDER ENGINEERING P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
PHOENIX SUTTON STR INCGeneral Contractor207/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
Building Lifecycle
All (9)Filed (4)Permit Issued (3)Signed Off (2)
02/26/2019
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00038551-I1
01/15/2019
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00060339-I1
10/29/2018
Permit issued — Sidewalk Shed
B00038551-I1-SH
10/24/2018
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00038551-P1
09/07/2018
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00060339-P1
08/03/2018
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00060339-I1
08/03/2018
Permit issued — Supported Scaffold
B00060339-I1-SF
04/30/2018
Permit issued — Sidewalk Shed
B00038551-I1-SH
04/26/2018
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B00038551-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC10/29/2018
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS08/03/2018
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC04/30/2018
3 projects · most recent 07/15/2018
General Wiring
FiledStatusContractorScope
07/15/2018CompleteFRIED ELECTRIC CO.General Wiring
05/15/2018CompleteFRIED ELECTRIC CO.—
04/19/2018CompleteELPO ELECTRICAL CONTG INC—
Nothing on file for this building.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026B00038551-I1Request digital key ↗
09/03/2026B00038551-P1Request digital key ↗
09/03/2026B00060339-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026B00038551-P1Open ↗
09/03/2026B00038551-I1Open ↗
09/03/2026B00060339-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWHPD-1: Anti-Harassment Area Checklist4
08/13/2026B00038551-P1Open ↗
08/13/2026B00060339-P1Open ↗
08/13/2026B00060339-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWOER: Notice to Proceed4
08/13/2026B00060339-P1Open ↗
08/13/2026B00038551-P1Open ↗
08/13/2026B00060339-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026B00038551-I1Open ↗
08/13/2026B00060339-I1Open ↗
▸Other Documents10
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation4
08/13/2026B00060339-P1Open ↗
08/13/2026B00038551-P1Open ↗
08/13/2026B00060339-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board4
08/13/2026B00060339-P1Open ↗
08/13/2026B00038551-P1Open ↗
08/13/2026B00038551-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
08/13/2026B00038551-I1Open ↗
08/13/2026B00038551-P1Open ↗