← Back
Walk-up apt, over six families with stores
141 ROSS STREET
BROOKLYN · BIN 3059971
💬 Discuss this project
1927Year Built
6Stories
C7Building Class
R6Zoning
20,800 sfGross Floor Area
25Units
Rent Stabilized193 Open Violations 190 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 141 ROSS STREET HOLDINGS LLC · 5,854 sf lot · 3.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction43p · 2 filings · 20 docs
Floor 6Under Construction43p · 2 filings · 20 docs
Floor 5Under Construction43p · 2 filings · 20 docs
Floor 4Under Construction50p · 1 filing · 20 docs
Floor 3Under Construction51p · 1 filing · 20 docs
Floor 2Under Construction50p · 1 filing · 20 docs
Floor 1Under Construction50p · 1 filing · 20 docs
CellarUnder Construction53p · 1 filing · 20 docs
1 job · most recent 08/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026Permit IssuedWATERFRONT PROPERTY MGMTHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA36AAVJU 34,200 BTU · Vrf Outdoor ×34
RXTA48AAVJU 45,500 BTU · Vrf Outdoor ×22
RXTA24AAVJU 23,000 BTU · Vrf Outdoor ×6
RXTA60AAVJU 57,500 BTU · Vrf Outdoor ×2
Ventilation
Renewaire EV PREMIUM S 125 CFM · Erv ×2
1 job · most recent 08/06/2026
Sprinkler System
FiledStatusContractorScope
08/06/2026Permit IssuedQUALITY PIPING, INCSprinkler System
1 job · most recent 08/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/06/2026Permit IssuedQUALITY PIPING, INCGas, Storm, Water/Sanitary
6 jobs · most recent 10/23/2025
General Wiring
FiledStatusContractorScope
10/23/2025Permit IssuedSOLAS ELECTRICAL CORP—
08/28/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
05/27/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
05/18/2025Permit IssuedDENALI ELECTRIC CORP—
07/15/2022Permit IssuedRICHARD NEU—
05/15/2019Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
1 job · most recent 08/06/2026
Steel Masonry Wood
FiledStatusContractorScope
08/06/2026Permit IssuedWATERFRONT PROPERTY MGMTSteel, Masonry, Wood
4 jobs · most recent 03/10/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
03/10/2026Signed-offCORE SCAFFOLD SYSTEMS INCScaffold
01/20/2026Signed-offCORE SCAFFOLD SYSTEMS INCSidewalk Shed
12/19/2024Permit IssuedWATERFRONT PROPERTY MGMTFence
07/13/2022Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
Building Lifecycle
All (209)Filed (21)Permit Issued (16)Violation (60)Inspection (6)Objection (76)Special Inspection (30)
09/25/2026
Permit issued — Structural
B01154661-S6-ST
09/25/2026
Permit issued — Foundation
B01154661-S5-FO
08/06/2026
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01154661-I1.
B01154661-P7
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/23/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/21/2026
Special inspection requirement — Footing and Foundation
FAHAD FATEH
07/21/2026
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
07/21/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
07/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
07/21/2026
Special inspection requirement — Final
FAHAD FATEH
07/21/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
FAHAD FATEH
07/17/2026
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01154661-I1.
B01154661-P6
07/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/14/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/14/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
07/14/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/14/2026
Special inspection requirement — Sprayed fire-resistant materials
FAHAD FATEH
07/14/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/14/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/14/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
07/14/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
07/14/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
07/14/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
07/14/2026
Special inspection requirement — Metering
FAHAD FATEH
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/14/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/14/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
07/14/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/09/2026
Permit issued — Mechanical Systems
B01154661-S4-MS
07/09/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
07/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/29/2026
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01154661-I1.
B01154661-P5
06/29/2026
Objection resolved — Addressed
06/25/2026
Objection raised — Other
06/22/2026
Objection raised — Cost
06/22/2026
Objection resolved — Addressed
06/19/2026
Objection resolved — Addressed
06/18/2026
Objection raised — Cost
06/16/2026
Objection resolved — Addressed
05/28/2026
Objection raised — Cost
05/12/2026
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01154661-I1.
B01154661-P4
05/05/2026
Violation issued (HPD, open)
A
05/02/2026
Permit issued — General Construction
B01154661-I1-GC
04/30/2026
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: B01154661-I1.
B01154661-P3
04/17/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/01/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01341391-P1
03/10/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2026
Permit issued — Supported Scaffold
B01341391-I1-SF
03/04/2026
Violation issued (ECB, open)
Unknown
03/04/2026
Violation issued (ECB, closed)
Construction
02/23/2026
Objection resolved — Addressed
02/02/2026
Objection raised — Other
Latest 60 of 209 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WATERFRONT PROPERTY MANAGEMENT3209/26/2026
OWNERS REP804/09/2026
TOPLINE NYC CONTRACTING303/22/2026
141 ROSS STREET HOLDINGS LLC103/22/2026
WATERFRONT PROPERTY MGNT303/22/2026
OWNER OF 141 ROSS ST303/22/2026
THE OWNER OF103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/09/2024$14.6M—141 ROSS REALTY LLC → 141 ROSS STREET HOLDINGS LLC$701/sf building
03/22/2024$8.0M—— → —$382/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1003/21/2026
ADVANCED BUILDERS SERVICES1003/21/2026
NOEL BUILDING CONSULTING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WATERFRONT PROPERTY MGMTGeneral Contractor1409/26/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor404/09/2026
CITY LIMIT CONSTRUCTION *General Contractor303/21/2026
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
QUALITY PIPING, INCFire Protection107/08/2026
NESS MECHANICAL P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161308/06/2026
AA BUILDING & INSPECTION1519107/20/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedWATERFRONT PROPERTY MGMT09/25/2026
DOB NOWFoundationPermit IssuedWATERFRONT PROPERTY MGMT09/25/2026
DOB NOWMechanical SystemsPermit IssuedWATERFRONT PROPERTY MGMT07/09/2026
DOB NOWGeneral ConstructionPermit IssuedWATERFRONT PROPERTY MGMT05/02/2026
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/04/2026
DOB NOWConstruction FencePermit IssuedWATERFRONT PROPERTY MGMT01/26/2026
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC11/13/2025
DOB NOWSprinklersPermit IssuedQUALITY PIPING, INC11/13/2025
DOB NOWPlumbingPermit IssuedNESS MECHANICAL P & H INC11/13/2025
DOB NOWStructuralPermit IssuedWATERFRONT PROPERTY MGMT10/03/2025
DOB NOWFoundationPermit IssuedWATERFRONT PROPERTY MGMT10/03/2025
DOB NOWMechanical SystemsPermit IssuedWATERFRONT PROPERTY MGMT07/10/2025
DOB NOWGeneral ConstructionPermit IssuedWATERFRONT PROPERTY MGMT05/22/2025
DOB NOWConstruction FencePermit IssuedWATERFRONT PROPERTY MGMT01/29/2025
DOB NOWGeneral ConstructionPermit IssuedCITY LIMIT CONSTRUCTION *12/01/2022
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING08/01/2022
BIS—ISSUEDMRI DEVELOPERS CORP12/24/2001
BIS—ISSUEDMBM DEMOLITION CORP DBA MOISHES04/24/2001
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/17/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/01/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/10/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
07/23/2026Maintenance informationFAHAD FATEHenergy_progress
07/23/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/23/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/23/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/23/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/21/2026Footing and FoundationFAHAD FATEHprogress
07/21/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
07/21/2026FinalFAHAD FATEHprogress
07/21/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/21/2026Subgrade InspectionsFAHAD FATEHspecial
07/21/2026Subsurface Conditions – Fill Placement & In-Place DensityFAHAD FATEHspecial
07/14/2026Fenestration air leakageFAHAD FATEHenergy_progress
07/14/2026Lighting controlsFAHAD FATEHenergy_progress
07/14/2026Exterior lighting powerFAHAD FATEHenergy_progress
07/14/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/14/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
07/14/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/14/2026Sprayed fire-resistant materialsFAHAD FATEHspecial
07/14/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/14/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/14/2026Interior lighting powerFAHAD FATEHenergy_progress
07/14/2026MeteringFAHAD FATEHenergy_progress
07/14/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
07/14/2026Fenestration areasFAHAD FATEHenergy_progress
07/14/2026Air barrier — testing FAHAD FATEHenergy_progress
Latest 25 of 97.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/29/2026B00768723-I1Request digital key ↗
08/19/2026B01154661-S4Request digital key ↗
08/19/2026B01154661-S3Request digital key ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/19/2026B01154661-S3Open ↗
08/19/2026B01154661-S1Open ↗
08/19/2026B01154661-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B01154661-P7Open ↗
09/01/2026B01154661-P7Open ↗
08/31/2026B01154661-P4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B01154661-P7Open ↗
09/01/2026B01154661-P7Open ↗
08/31/2026B01154661-P4Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/19/2026B01154661-P7Open ↗
08/13/2026B01154661-P1Open ↗
08/13/2026B01154661-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/19/2026B01154661-S4Open ↗
08/19/2026B01154661-S3Open ↗
08/19/2026B01154661-S1Open ↗
Showing 3 of 14 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/19/2026B01154661-I1Open ↗
08/19/2026B01154661-P7Open ↗
08/19/2026B01154661-P1Open ↗
Showing 3 of 4 on file for this type