141 WEST 142 STREET
MANHATTAN · BIN 1060107
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
10,210 sfGross Floor Area
10Units
Rent Stabilized40 Open Violations ▸
Old law tenement · Owner of record: NYC HOUSING AUTHORITY · 2,698 sf lot · 3.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction33p · 1 filing · 20 docs
Floor 5Under Construction32p · 1 filing · 20 docs
Floor 4Under Construction29p · 1 filing · 20 docs
Floor 3Under Construction31p · 1 filing · 20 docs
Floor 2Under Construction29p · 1 filing · 20 docs
Floor 1Under Construction31p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY2108/26/2026
NYC HOUSING AUTHORITY303/22/2026
SAM CITY MASTER TENANT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMTG CONSULTANTS INC1008/03/2026
WELLWORTH CONSULTING LLC110/01/2024
CHOK PAN WONG203/25/2024
SHANEEKUA HENRY103/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2203/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor607/08/2026
DUAL FUEL PLUBING & HTINGPlumbing407/08/2026
MONADNOCK GEN'L CONT INCGeneral Contractor308/26/2026
M&G PLUMBING AND HEATINGPlumbing207/08/2026
PREMIER CONSTRUCTION INCGeneral Contractor107/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor107/08/2026
BELL CONSTRUCTION SVCSGeneral Contractor107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC20031308/03/2026
Building Lifecycle
All (126)Filed (16)Permit Issued (17)Signed Off (3)Violation (49)Inspection (9)Objection (2)Special Inspection (30)
08/25/2026
Permit issued — General Construction
M00882430-I1-GC
08/11/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
08/11/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
08/11/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
08/11/2026
Special inspection requirement — Final
Christopher Drutjons
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
08/11/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
08/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/11/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
08/11/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
08/06/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00882430-S5
08/03/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00882430-P5
07/24/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
07/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
07/24/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
07/24/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
07/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
07/24/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
07/24/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
07/24/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
07/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
07/24/2026
Special inspection requirement — Final
Christopher Drutjons
07/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
07/09/2026
Permit issued — Mechanical Systems
M00882430-S4-MS
05/29/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
05/29/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
05/29/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
05/28/2026
Permit issued — Sidewalk Shed
M01119412-I1-SH
05/26/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00882430-P4
05/18/2026
Filed — Alteration
INSTALL SKY STAGE ULTRA WORK CAGE AND INSTALL ROOF HOIST IN ORDER TO PERFORM FACADE EXTERIOR WORK. SIDEWALK SHED TO BE INSTALLED UNDER SEPARATE APPLICATION. (POST APPROVAL AMENDMENT FILED TO ADD SKY STAGE ULTRA CAGE.)
M01319768-P1
05/06/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, closed)
A
04/17/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/08/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00882430-S6
04/08/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00882430-S7
03/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2026
Permit issued — Sidewalk Shed
M01119412-I1-SH
03/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/25/2026
Permit issued — Plumbing
M00882430-S5-PL
02/09/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00882430-P3
01/12/2026
Violation issued (HPD, closed)
A
01/12/2026
Violation issued (HPD, closed)
C
01/12/2026
Violation issued (HPD, closed)
C
01/12/2026
Violation issued (HPD, closed)
C
01/12/2026
Violation issued (HPD, closed)
B
01/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/02/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00882430-P2
11/21/2025
Permit issued — Suspended Scaffold
M01319768-I1-SC
11/17/2025
Violation issued (HPD, closed)
I
11/15/2025
Filed — Alteration
INSTALL SKY STAGE ULTRA WORK CAGE AND INSTALL ROOF HOIST IN ORDER TO PERFORM FACADE EXTERIOR WORK. SIDEWALK SHED TO BE INSTALLED UNDER SEPARATE APPLICATION. (POST APPROVAL AMENDMENT FILED TO ADD SKY STAGE ULTRA CAGE.)
M01319768-I1
11/13/2025
Permit issued — General Construction
M00882430-I1-GC
11/06/2025
Permit issued — General Construction
M00882430-S2-GC
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC08/25/2026
DOB NOWMechanical SystemsSigned-offBELL CONSTRUCTION SVCS07/09/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC05/28/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/03/2026
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING02/25/2026
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC11/21/2025
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC11/13/2025
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC11/06/2025
DOB NOWPlumbingPermit IssuedM&G PLUMBING AND HEATING10/27/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC10/03/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING04/01/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC02/28/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING02/28/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING02/28/2025
DOB NOWPlumbingPermit IssuedM&G PLUMBING AND HEATING10/25/2024
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC10/01/2024
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC10/01/2024
1 project · most recent 08/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026Signed-offMONADNOCK GEN'L CONT INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-AH24NL 24,500 BTU · Condensing Unit ×2
1 project · most recent 08/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Signed-offDUAL FUEL PLUBING & HTINGGas, Storm, Water/Sanitary
4 projects · most recent 04/01/2026
Boiler Controls General Wiring
FiledStatusContractorScope
04/01/2026Permit IssuedZENA ELECTRIC INC—
06/03/2025CompleteSTX ELECTRICAL CORPBoiler Controls
12/11/2024Permit IssuedGOTHAM TECHNICAL SERVICESGeneral Wiring
10/02/2024Permit IssuedTOP SHELF ELECTRIC CORP—
1 project · most recent 10/01/2024
Sidewalk Shed
FiledStatusContractorScope
10/01/2024Permit IssuedSPRING SCAFFOLDING LLCSidewalk Shed
1 project · most recent 05/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/18/2026Permit IssuedPREMIER CONSTRUCTION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/17/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
08/11/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
08/11/2026Heating SystemsChristopher Drutjonsspecial
08/11/2026Mechanical SystemsChristopher Drutjonsspecial
08/11/2026Post-installed AnchorsChristopher Drutjonsspecial
08/11/2026Tenant Protection Plan Compliance—special
08/11/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
08/11/2026FinalChristopher Drutjonsprogress
08/11/2026Permanent certificateChristopher Drutjonsenergy_progress
08/11/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
08/11/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
08/11/2026Maintenance informationChristopher Drutjonsenergy_progress
08/11/2026Shutoff dampersChristopher Drutjonsenergy_progress
07/24/2026Mechanical SystemsChristopher Drutjonsspecial
07/24/2026Permanent certificateChristopher Drutjonsenergy_progress
07/24/2026Maintenance informationChristopher Drutjonsenergy_progress
07/24/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
07/24/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
07/24/2026FinalChristopher Drutjonsprogress
07/24/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
07/24/2026Tenant Protection Plan Compliance—special
07/24/2026Post-installed AnchorsChristopher Drutjonsspecial
07/24/2026Heating SystemsChristopher Drutjonsspecial
07/24/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
07/24/2026Shutoff dampersChristopher Drutjonsenergy_progress
05/29/2026Tenant Protection Plan ComplianceChristopher Drutjonsspecial
Latest 25 of 93.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026M00882430-S4Request digital key ↗
08/27/2026M00882430-S3Request digital key ↗
08/27/2026M00882430-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026M00882430-S7Open ↗
09/01/2026M00882430-P3Open ↗
09/01/2026M00882430-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026M00882430-S3Open ↗
08/27/2026M00882430-P5Open ↗
08/27/2026M00882430-P4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026M00882430-S7Open ↗
09/01/2026M00882430-P3Open ↗
09/01/2026M00882430-S1Open ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/27/2026M00882430-S3Open ↗
08/27/2026M00882430-P5Open ↗
08/27/2026M00882430-P4Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/27/2026M00882430-S3Open ↗
08/27/2026M00882430-S5Open ↗
08/27/2026M00882430-P5Open ↗
Showing 3 of 13 on file for this type
▸Other Documents6
▸DOB NOWCalculations3
08/20/2026M01319768-I1Open ↗
08/20/2026M01319768-P1Open ↗
08/13/2026M01319768-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/20/2026M01319768-I1Open ↗
08/20/2026M01319768-P1Open ↗
08/13/2026M01319768-I1Open ↗