← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
141 WEST 17TH STREET
MANHATTAN · BIN 1014650
💬 Discuss this project
1918Year Built
6Stories
D0Building Class
C6-2AZoning
32,862 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized0 Active Violations
Elevator co-op, conversion from loft/warehouse · Owner of record: Old Warren Road House · 6,178 sf lot · 5.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAll Area Realty Services INC.15p · 3 filings · 20 docs
Floor 6Unit 6E24p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarAll Area Realty Services INC.3p · 1 filing · 6 docs
Site & exteriorHeavy duty sidewalk shed installation10p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Roadhouse Leasing Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Agouti Construction Consulting1003/21/2026
Boyd Consulting203/21/2026
D D Expeditors203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Warren Ostroff ElectricElectrical703/21/2026
Raul ConstructionGeneral Contractor707/08/2026
Buckmiller Automatic SprinklerFire Protection307/08/2026
Phoenix Sutton STRScaffold307/08/2026
Inter RenovationGeneral Contractor303/21/2026
Robert Star Plumbing and HeatingPlumbing207/08/2026
G. C. Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RHL Engineering712209/03/2024
Wavic Engineering1733404/05/2024
Integrity Consulting Service666207/26/2023
Richmond Testing Lab263107/24/2023
SWL Engineering Inspectio6912101/09/2023
JMV Consulting Engineering804109/06/2019
Building Lifecycle
All (105)Filed (14)Permit Issued (14)Signed Off (10)Violation (28)Inspection (9)Objection (2)Special Inspection (28)
11/12/2024
Signed off — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-I1
11/01/2024
Signed off — Alteration
Reconfiguration of skylights at roof
M08002443-I1
09/27/2024
Signed off — Alteration
Reconfiguration of skylights at roof
M08002443-S1
09/26/2024
Signed off — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S2
09/26/2024
Signed off — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S1
09/06/2024
Special inspection requirement — Mechanical Systems
Vincent Gentile
09/06/2024
Special inspection requirement — Final
Vincent Gentile
09/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Gentile
09/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Gentile
09/06/2024
Special inspection requirement — Maintenance information
Vincent Gentile
09/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Gentile
09/03/2024
Filed — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-P2
08/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Gentile
08/27/2024
Special inspection requirement — Mechanical Systems
Vincent Gentile
08/27/2024
Special inspection requirement — Final
Vincent Gentile
08/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Gentile
08/27/2024
Special inspection requirement — Maintenance information
Vincent Gentile
08/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Gentile
08/15/2024
Signed off — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S4
08/15/2024
Signed off — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S3
08/15/2024
Signed off — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S5
08/07/2024
Permit issued — Plumbing
M08002385-S1-PL
08/05/2024
Permit issued — General Construction
M08002385-I1-GC
08/02/2024
Violation issued (ECB, closed)
Construction
08/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/05/2024
Filed — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-P1
04/02/2024
Signed off — Alteration
M08045088-I1
03/29/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00884443-I1
02/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/21/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
02/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/16/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/15/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/31/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00884443-P1
09/21/2023
Permit issued — General Construction
M08045088-I1-GC
09/07/2023
Permit issued — Mechanical Systems
M08002385-S2-MS
09/07/2023
Permit issued — Structural
M08002443-S1-ST
09/06/2023
Permit issued — Plumbing
M08002385-S1-PL
08/30/2023
Permit issued — Sprinklers
M08002385-S4-EW-SP
08/30/2023
Permit issued — Sprinklers
M08002385-S5-EW-SP
08/30/2023
Permit issued — Sprinklers
M08002385-S3-EW-SP
08/30/2023
Objection resolved — Addressed
08/25/2023
Permit issued — General Construction
M08002385-I1-GC
08/24/2023
Permit issued — General Construction
M08002443-I1-GC
08/14/2023
Filed — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S4
08/14/2023
Filed — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S3
08/14/2023
Filed — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S5
08/04/2023
Objection raised — Other
08/01/2023
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
07/26/2023
Filed — Alteration
Reconfiguration of skylights at roof
M08002443-S1
07/24/2023
Filed — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-I1
07/24/2023
Filed — Alteration
Reconfiguration of skylights at roof
M08002443-I1
07/24/2023
Filed — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S2
07/24/2023
Filed — Alteration
sprinkler work filed in conjunction with apartment #6E renovation.
M08002385-S1
07/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
07/21/2023
Special inspection requirement — Fenestration air leakage
Nasser Nakib
07/21/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasser Nakib
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRobert Star Plumbing and Heating08/07/2024
DOB NOWGeneral ConstructionSigned-offRaul Construction08/05/2024
DOB NOWGeneral ConstructionSigned-offInter Renovation09/21/2023
DOB NOWMechanical SystemsSigned-offRaul Construction09/07/2023
DOB NOWStructuralSigned-offRaul Construction09/07/2023
DOB NOWPlumbingSigned-offRobert Star Plumbing and Heating09/06/2023
DOB NOWSprinklersSigned-offBuckmiller Automatic Sprinkler08/30/2023
DOB NOWSprinklersSigned-offBuckmiller Automatic Sprinkler08/30/2023
DOB NOWSprinklersSigned-offBuckmiller Automatic Sprinkler08/30/2023
DOB NOWGeneral ConstructionSigned-offRaul Construction08/25/2023
DOB NOWGeneral ConstructionSigned-offRaul Construction08/24/2023
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR06/08/2023
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR06/08/2023
DOB NOWPlumbingSigned-offG. C. Plumbing & Heating06/09/2020
BISOTISSUEDAdvanced Remodeling Solu07/23/2014
BISPLISSUEDWawel Plumbing and Heating06/19/2014
BISMHISSUEDAdvanced Remodeling Solu05/08/2014
BISOTISSUEDSMR Craftworks01/08/2014
BISPLISSUEDMartin PLG & Heating11/04/2013
BISOTISSUEDSMR Craftworks10/02/2013
BISEQISSUEDPhoenix Bridging04/01/2011
BISBLISSUEDStatewide Oil & Heating Co05/10/2006
BISSPISSUEDBuckmiller Automatic Sprinkler01/04/2005
BISPLISSUEDD & G Mechnical10/06/2004
BISEQRE-ISSUEDSLBY Construction05/03/1994
BISOTISSUEDSLBY Construction05/03/1994
BIS—ISSUEDVanguard Construction & Development07/06/1990
1 project · most recent 09/03/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/03/2024Signed-offRaul ConstructionHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM 36,000 BTU · Condensing Unit ×2
MXZ-SM48NAM 48,000 BTU · Condensing Unit ×2
1 project · most recent 09/03/2024
Sprinkler System
FiledStatusContractorScope
09/03/2024Signed-offBuckmiller Automatic SprinklerSprinkler System
1 project · most recent 09/03/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/03/2024Signed-offRobert Star Plumbing and HeatingGas, Water/Sanitary
4 projects · most recent 09/19/2024
General Wiring Lighting
FiledStatusContractorScope
09/19/2024CompleteWarren Ostroff Electric1 meters, 1 new_meters
09/19/2024CompleteWarren Ostroff ElectricGeneral Wiring
09/13/2023Permit IssuedTJN ElectricGeneral Wiring, Lighting
06/01/2023CompleteElpo Electrical Contg—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/21/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/06/2024Mechanical SystemsVincent Gentilespecial
09/06/2024FinalVincent Gentileprogress
09/06/2024HVAC-R and service water heating system controlsVincent Gentileenergy_progress
09/06/2024HVAC-R and service water piping design and insulationVincent Gentileenergy_progress
09/06/2024Maintenance informationVincent Gentileenergy_progress
09/06/2024HVAC-R and service water heating equipmentVincent Gentileenergy_progress
08/27/2024HVAC-R and service water piping design and insulationVincent Gentileenergy_progress
08/27/2024Mechanical SystemsVincent Gentilespecial
08/27/2024FinalVincent Gentileprogress
08/27/2024HVAC-R and service water heating equipmentVincent Gentileenergy_progress
08/27/2024Maintenance informationVincent Gentileenergy_progress
08/27/2024HVAC-R and service water heating system controlsVincent Gentileenergy_progress
08/01/2023Sprinkler SystemsDARIUSZ LUCZAKspecial
07/21/2023Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
07/21/2023Fenestration air leakageNasser Nakibenergy_progress
07/21/2023Fenestration and door U-factor and product ratingsNasser Nakibenergy_progress
07/21/2023Insulation placement and R valuesNasser Nakibenergy_progress
07/11/2023FinalNasser Nakibprogress
07/11/2023Energy Code Compliance InspectionsNasser Nakibprogress
07/11/2023Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
07/10/2023Sprinkler SystemsDARIUSZ LUCZAKspecial
07/06/2023FinalALEKSANDR LEVINprogress
01/04/2023Insulation placement and R valuesYakov Weinsteinenergy_progress
01/04/2023Energy Code Compliance InspectionsYakov Weinsteinprogress
11/23/2022FinalYakov Weinsteinprogress
Latest 25 of 28.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
09/01/2026M08045088-I1Request digital key ↗
08/31/2026M00884443-P1Request digital key ↗
08/31/2026M00884443-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00212029-I1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION9
08/16/2014121946485Open ↗
08/16/2014121946485Open ↗
07/01/2014121946485Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
03/25/2014121946485Open ↗
11/05/2013121742123Open ↗
09/03/2013121742123Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026M08045088-I1Open ↗
08/29/2026M08002385-S1Open ↗
08/29/2026M08002385-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M08002385-P2Open ↗
09/01/2026M08002385-P2Open ↗
08/28/2026M00212029-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
10/16/2015121742123Open ↗
10/16/2015121742123Open ↗
10/16/2015121742123Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M08002385-S5Open ↗
09/01/2026M08002385-P2Open ↗
08/28/2026M00212029-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/05/2011120646836Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/05/2011120646836Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
02/11/2015121946485Open ↗
10/17/2014121946485Open ↗
10/16/2014121742123Open ↗
▸BISSCHEDULE B - PLUMBING3
03/25/2014121946485Open ↗
11/05/2013121742123Open ↗
09/03/2013121742123Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00212029-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/29/2026M08002385-I1Open ↗
08/29/2026M08002385-P1Open ↗
08/29/2026M08002385-S5Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
03/25/2014121946485Open ↗
09/03/2013121742123Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/05/2011120646836Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026M08045088-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/16/2015121742123Open ↗
10/16/2015121742123Open ↗
05/13/2015121946485Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/16/2015121742123Open ↗
05/13/2015121946485Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/09/2013121742123Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/16/2015121742123Open ↗
05/13/2015121946485Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/05/2011120646836Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/16/2015121742123Open ↗
05/13/2015121946485Open ↗
03/25/2014121946485Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
03/25/2014121946485Open ↗
09/03/2013121742123Open ↗
04/05/2011120646836Open ↗
▸BISADDITIONAL INFORMATION1
02/10/2015121946485Open ↗