RoofUnder Construction11p · 5 filings · 20 docs
ArchitectureDMElectricalLandscapeMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Solar
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
On file for this job
6 documents · 2 drawing sheets
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Bulkhead3p · 1 filing · 20 docs
ArchitectureMechanical
INSTALLATION OF THREE (3) GAS BOILERS ON 24TH FLOOR IN CONJUNCTION WITH NEW BUILDING APPLICATION 321593316
On file for this job
20 documents · 3 drawing sheets
Floor 24Under Construction1 filing · 3 docs
Architecture
Issued Permit Scope
General Construction
Interior demolition in commercial building.
On file for this job
3 documents
Floor 23Under Construction3p · 3 filings · 14 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 22Under Construction3p · 3 filings · 14 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 21Under Construction5p · 4 filings · 16 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 20Under Construction5p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB# 321593316.
On file for this job
2 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 19Under Construction4p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 18Under Construction4p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 17Under Construction4p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 16Under Construction4p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 15Under Construction4p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 14Under Construction4p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 13Under Construction4p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 12Under Construction4p · 4 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 11Under Construction11p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
MODIFICATIONS TO EXISTING PLUMBING SYSTEM FOR MARKETING SUITE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB# 321593316.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF INTERIOR PARTITIONS, CEILINGS, DOORS, AND FLOORS FOR MARKETING SUITE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB# 321593316.
On file for this job
5 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 10Under Construction12p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB# 321593316.
On file for this job
3 documents · 1 drawing sheet
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB# 321593316.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 9Under Construction3p · 3 filings · 14 docs
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 8Under Construction3p · 3 filings · 14 docs
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 7Under Construction3p · 3 filings · 14 docs
ArchitectureDMPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 6Under Construction3p · 3 filings · 14 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 5Under Construction3p · 3 filings · 14 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 4Under Construction3p · 3 filings · 14 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
GOLD STREET HOISTS: INSTALLATION OF DUAL 10300 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this job
9 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 3Under Construction3p · 3 filings · 20 docs
ArchitectureDMLandscape
Issued Permit Scope
General Construction
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF THREE (3) GAS BOILERS ON 24TH FLOOR IN CONJUNCTION WITH NEW BUILDING APPLICATION 321593316
On file for this job
20 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 1 drawing sheet
Floor 2Under Construction85p · 5 filings · 20 docs
ArchitectureDMMechanicalStructural
Issued Permit Scope
General Construction
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
Conversion of existing commercial building to residential.
On file for this job
22 documents · 2 drawing sheets
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 1Under Construction87p · 6 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Interior demolition in commercial building.
On file for this job
3 documents · 1 drawing sheet
Conversion of existing commercial building to residential.
On file for this job
22 documents · 3 drawing sheets
Proposed installation of 29' curb cut to access loading berths. No change to use, egress or occupancy is proposed.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
CellarUnder Construction86p · 3 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Conversion of existing commercial building to residential.
On file for this job
22 documents · 4 drawing sheets
Proposed installation of 29' curb cut to access loading berths. No change to use, egress or occupancy is proposed.
On file for this job
3 documents · 1 drawing sheet
INSTALLATION OF FUEL OIL STORAGE TANKS 6000 GAL INSTALLED IN CELLAR AND 330 GAL STORAGE TANK IN ROOF AS INDICATED ON PLANS FILED HEREWITH.MECHANICAL COMPONENT OF GENERATOR IS FILED WITH NB APPICATION 321593316
On file for this job
9 documents · 1 drawing sheet