ECB08/03/2026AT THE TIME OF INSPECTION, HVAC WORK WAS OBSERVED BEING PERFORMED WITHOUT A PERMIT ON FILE. THE WORK APPEARED TO BE APPROXIMATELY 70% COMPLETE, FOR THE INSTALLATION OF SEVERAL DUCTS AND PERFORMANCE UNITS WITHIN$2K due
ECB08/03/2026AT THE TIME OF INSPECTION, WORK WAS OBSERVED ON THE SIXTH FLOOR, WEST SIDE OF THE BUILDING WITHOUT THE REQUIRED PERMIT. THE INSTALLATION APPEARS TO INVOLVE ELECTRICAL BX CABLE FOR POWERING LIGHTING FIXTURES ANDNothing owed — awaiting certificate of correction
ECB08/03/2026AT THE TIME OF INSPECTION, PLUMBING WORK WAS OBSERVED WITHOUT THE REQUIRED PERMIT FOR INSTALLATIONS THROUGHOUT THE WEST SIDE OF THE BUILDING ON THE SIXTH FLOOR IN THE BACK ROOM. THE WORK APPEARS TO BE APPROXIMANothing owed — awaiting certificate of correction
ECB08/03/2026ATOI, WORK WAS OBSERVED BEING PERFORMED WITHOUT A PERMIT ON FILE FOR THE DESCRIBED SCOPE. THE ACTIVITY APPEARED TO INCLUDE THE INSTALLATION OF PARTITION WALLS THROUGHOUT THE BACK ROOM ON THE SIXTH FLOOR ON THENothing owed — awaiting certificate of correction