1410 VYSE AVENUE
BRONX · Crotona Park East · BIN 2130702
💬 Discuss this project
0Year Built
4.5Stories
C1Building Class
R7-1Zoning
5,678 sfGross Floor Area
15Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: 1410 VYSE LLC · 2,000 sf lot · 2.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof22p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Penthouse19p · 2 filings · 20 docs
Floor 420p · 3 filings · 20 docs
Floor 318p · 3 filings · 20 docs
Floor 221p · 3 filings · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar23p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1410 VYSE6507/08/2026
PLATINUM SERVICES NY1307/08/2026
FOUR BORO ENTERPRISE403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2021$775K—1408 VYSE AVE LLC → 1410 VYSE LLC$136/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA1203/21/2026
GREEN STUDIO203/21/2026
PLATINUM SERVICES NY403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOUR BORO ENTERPRISE INCGeneral Contractor1807/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor707/08/2026
BRUCHE MECHANICAL NYGeneral Contractor103/21/2026
S&R ELECTRICAL & MECHANICElectrical103/22/2026
PLBG P & H INCPlumbing107/08/2026
DIFALCO JERRYGeneral Contractor103/21/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191307/23/2024
IP CONCRETE TESTING AND I6252105/30/2022
Building Lifecycle
All (167)Filed (19)Permit Issued (16)Signed Off (11)Violation (5)Inspection (10)Objection (76)Special Inspection (30)
07/31/2024
Special inspection requirement — Metering
Younes Abouyaala
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/31/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/31/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/31/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
07/31/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/31/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
07/31/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
07/31/2024
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/31/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
07/31/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/31/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/31/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/31/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
07/31/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/23/2024
Filed — New Building
Support of Excavation work in conjunction with NB #X00665113-i1
X00665113-P2
07/23/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/23/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
07/23/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/23/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/23/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
07/23/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
07/23/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
07/23/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
07/23/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/23/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
05/21/2024
Filed — New Building
Support of Excavation work in conjunction with NB #X00665113-i1
X00665113-P1
05/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/16/2024
Signed off — Alteration
Installing new plumbing and sprinkler system in conjunction with GC #X00665113-I1.
X00673256-I1
05/01/2024
Filed — Alteration
Installing new plumbing and sprinkler system in conjunction with GC #X00665113-I1.
X00673256-P3
04/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/18/2024
Signed off — Alteration
X01016497-I1
04/17/2024
Filed — Alteration
Installing new plumbing and sprinkler system in conjunction with GC #X00665113-I1.
X00673256-P2
04/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/09/2024
Signed off — Alteration
X00731701-I1
04/09/2024
Signed off — Alteration
Install new ventilation system in conjunction with GC # X00665113-I1.
X00673208-I1
04/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/05/2024
Permit issued — Mechanical Systems
X00673208-I1-MS
04/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2024
Signed off — New Building
Support of Excavation work in conjunction with NB #X00665113-i1
X00665113-S1
04/03/2024
Signed off — Alteration
INSTALLATION OF ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00956531-I1
04/03/2024
Signed off — New Building
Support of Excavation work in conjunction with NB #X00665113-i1
X00665113-S3
04/03/2024
Signed off — New Building
Support of Excavation work in conjunction with NB #X00665113-i1
X00665113-S2
04/03/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00836006-I1
04/02/2024
Signed off — Alteration
X00666175-I1
03/14/2024
Filed — Alteration
X01016497-I1
03/14/2024
Filed — Alteration
Installing new plumbing and sprinkler system in conjunction with GC #X00665113-I1.
X00673256-P1
02/16/2024
Permit issued — Sidewalk Shed
X00836006-I1-SH
01/16/2024
Permit issued — Construction Fence
X00666175-I1-FN
12/19/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/08/2023
Permit issued — Protection and Mechanical Methods
X00956531-I1-PMM
11/06/2023
Filed — Alteration
INSTALLATION OF ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00956531-I1
10/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFOUR BORO ENTERPRISE INC04/05/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/16/2024
DOB NOWConstruction FenceSigned-offFOUR BORO ENTERPRISE INC01/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC11/08/2023
DOB NOWPlumbingSigned-offPLBG P & H INC10/18/2023
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC10/17/2023
DOB NOWFoundationSigned-offFOUR BORO ENTERPRISE INC06/02/2023
DOB NOWGeneral ConstructionPermit IssuedFOUR BORO ENTERPRISE INC05/25/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC03/14/2023
DOB NOWConstruction FenceSigned-offFOUR BORO ENTERPRISE INC01/24/2023
DOB NOWStructuralSigned-offFOUR BORO ENTERPRISE INC01/03/2023
DOB NOWGeneral ConstructionPermit IssuedFOUR BORO ENTERPRISE INC01/03/2023
DOB NOWSupport of ExcavationSigned-offFOUR BORO ENTERPRISE INC01/03/2023
DOB NOWFoundationSigned-offFOUR BORO ENTERPRISE INC01/03/2023
DOB NOWFoundationSigned-offFOUR BORO ENTERPRISE INC01/03/2023
DOB NOWConstruction FenceSigned-offFOUR BORO ENTERPRISE INC01/28/2022
3 projects · most recent 04/16/2024
General Wiring
FiledStatusContractorScope
04/16/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
01/31/2024CompleteSPARK ELECTRICAL SVCS LLC16 meters, 16 new_meters
02/28/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 07/23/2024
Steel
FiledStatusContractorScope
07/23/2024Permit IssuedFOUR BORO ENTERPRISE INCSteel
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
07/31/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/31/2024Fenestration air leakageYounes Abouyaalaenergy_progress
07/31/2024Maintenance informationYounes Abouyaalaenergy_progress
07/31/2024Interior lighting powerYounes Abouyaalaenergy_progress
07/31/2024Lighting controlsYounes Abouyaalaenergy_progress
07/31/2024Exterior lighting powerYounes Abouyaalaenergy_progress
07/31/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/31/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
07/31/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/31/2024Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
07/31/2024Fenestration areasYounes Abouyaalaenergy_progress
07/31/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/31/2024MeteringYounes Abouyaalaenergy_progress
07/31/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/31/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/31/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
07/23/2024Interior lighting powerYounes Abouyaalaenergy_progress
07/23/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
07/23/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/23/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/23/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/23/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/23/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/23/2024Lighting controlsYounes Abouyaalaenergy_progress
07/23/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
Latest 25 of 92.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/24/2026X00666175-I1Request digital key ↗
08/24/2026X00731701-I1Request digital key ↗
08/24/2026X00716348-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
03/21/2024240333545Open ↗
09/08/2022240333545Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
02/02/2024240333545Open ↗
09/08/2022240333545Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram3
08/21/2026X00665113-P1Open ↗
08/15/2026X00665113-I1Open ↗
08/13/2026X00665113-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/21/2026X00665113-P1Open ↗
08/15/2026X00665113-I1Open ↗
08/13/2026X00665113-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 13
08/21/2026X00665113-P1Open ↗
08/15/2026X00665113-I1Open ↗
08/13/2026X00665113-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00665113-I1Open ↗
▸Seals & Professional Certifications96
▸DOB NOWProgress Inspector Seal & Signature51
09/06/2026X00665113-S1Open ↗
09/02/2026X00665113-P2Open ↗
09/02/2026X00665113-P2Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/06/2026X00665113-S1Open ↗
09/06/2026X00665113-S1Open ↗
09/06/2026X00665113-S1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/24/2026X00666175-I1Open ↗
08/24/2026X00731701-I1Open ↗
08/24/2026X00716348-I1Open ↗
Showing 3 of 19 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/08/2022240333545Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/08/2022240333545Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/21/2026X00665113-P1Open ↗
08/15/2026X00665113-I1Open ↗
08/13/2026X00665113-P2Open ↗
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist3
08/21/2026X00665113-P1Open ↗
08/15/2026X00665113-I1Open ↗
08/13/2026X00665113-P2Open ↗
▸BISSTREET TREES SITE PLAN1
02/02/2024240333545Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/02/2024240333545Open ↗
▸BISSTREET TREE CHECKLIST1
09/08/2022240333545Open ↗
▸BISSTREET TREE SIGNOFF1
04/11/2024240333545Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00665113-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00665113-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00665113-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00665113-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X01016497-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT4
08/13/2026X00731701-I1Open ↗
08/13/2026X00665113-S3Open ↗
08/13/2026X00665113-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram4
08/13/2026X00743186-I1Open ↗
08/13/2026X00731701-I1Open ↗
08/13/2026X00665113-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00743186-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/02/2024240333545Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
03/22/2024240333545Open ↗
02/02/2024240333545Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/08/2022240333545Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/08/2022240333545Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial3
08/21/2026X00665113-P1Open ↗
08/15/2026X00665113-I1Open ↗
08/13/2026X00665113-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026X00665113-P1Open ↗
08/15/2026X00665113-I1Open ↗
08/13/2026X00665113-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026X00665113-P1Open ↗
08/15/2026X00665113-I1Open ↗
08/13/2026X00665113-P2Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00731701-I1Open ↗
08/13/2026X00665113-S2Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
02/02/2024240333545Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/02/2024240333545Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/02/2024240333545Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00665113-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00665113-I1Open ↗