RoofUnder Construction159p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Standpipe · Structural
Exterior alterations to add new occupiable roof level; reinforcing existing roof slab, install new rooftop canopy structure, new slab opening for HVAC, slab infill on the 43rd Floors and Roof as per plans (Rooftop Amenity Space.)
On file for this project
27 documents
Modifications to the existing HVAC System on the 38-41st Floors and Roof Level as per plans (Roof Amenity Project.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Install (1) new 3-way roof manifold, (1) new FHR, (1) new Fire hose valve and (4) sprinkler heads on the Roof; Install (65) new sprinkler heads and associated SP/SD piping on the 41st Floor; and SP/DR piping on 40 as per plans (Rooftop Amenity Space.)
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 43Under Construction132p · 3 filings · 20 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Exterior alterations to add new occupiable roof level; reinforcing existing roof slab, install new rooftop canopy structure, new slab opening for HVAC, slab infill on the 43rd Floors and Roof as per plans (Rooftop Amenity Space.)
On file for this project
27 documents
Modifications to the existing HVAC System on the 38-41st Floors and Roof Level as per plans (Roof Amenity Project.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Architectural work to new roof amenity building envelope, interior finish. Mechanical, Electrical and Plumbing Systems filed under separate application. Interior: Multifunction room w/ associated pre-function & lounge/ cafe space, outdoor terrace, kitchen
On file for this project
29 documents · 6 drawing sheets
Floor 42Under Construction21p · 3 filings · 20 docs
MechanicalStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Structural
Modifications to the existing HVAC System on the 38-41st Floors and Roof Level as per plans (Roof Amenity Project.) No change to use, egress or occupancy.
On file for this project
5 documents
Use of temporary platform/material hoist as per plans filed herewith.
On file for this project
7 documents
Structural Modifications: Structural Steel Reinforcing and Reinforcing Existing Roof Slab on the 40-42 and Roof Levels as per plans (ATRU Abatement Filing.) No change to use, egress or occupancy.
On file for this project
20 documents
Floor 41Under Construction33p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Modifications to the existing HVAC System on the 38-41st Floors and Roof Level as per plans (Roof Amenity Project.) No change to use, egress or occupancy.
On file for this project
5 documents
Install (1) new 3-way roof manifold, (1) new FHR, (1) new Fire hose valve and (4) sprinkler heads on the Roof; Install (65) new sprinkler heads and associated SP/SD piping on the 41st Floor; and SP/DR piping on 40 as per plans (Rooftop Amenity Space.)
On file for this project
5 documents
Install (1) booster pump, (1) grease trap, (1) secondary RPZ on 40; (3) HWH, (1) MS, (6) Lav, (6) WC, (1) DF, (6) RD, (6) Overflow drains, (5) sinks, (5) FDs, (1) DW, (1) IM on 41; (7) RD and (7) overflow drains on Roof and associated piping as per plans.
On file for this project
5 documents
Latest 3 of 5 filings on this floor.
Floor 40Under Construction34p · 7 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
Modifications to the existing HVAC System on the 38-41st Floors and Roof Level as per plans (Roof Amenity Project.) No change to use, egress or occupancy.
On file for this project
5 documents
Install (1) new 3-way roof manifold, (1) new FHR, (1) new Fire hose valve and (4) sprinkler heads on the Roof; Install (65) new sprinkler heads and associated SP/SD piping on the 41st Floor; and SP/DR piping on 40 as per plans (Rooftop Amenity Space.)
On file for this project
5 documents
Install (1) booster pump, (1) grease trap, (1) secondary RPZ on 40; (3) HWH, (1) MS, (6) Lav, (6) WC, (1) DF, (6) RD, (6) Overflow drains, (5) sinks, (5) FDs, (1) DW, (1) IM on 41; (7) RD and (7) overflow drains on Roof and associated piping as per plans.
On file for this project
5 documents
Latest 3 of 7 filings on this floor.
Floor 39Under Construction12p · 3 filings · 15 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Modifications to the existing HVAC System: removal of existing ductwork and piping on the 38th and 39th Floors as per plans (LL Work - Demo & Whitebox.) No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 38-39th Floors as per plans (LL Work - Demo & Buildout.) No change to use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Modifications to the existing Sprinkler System: Install (32) temporary sprinkler heads on the 38th and 39th Floors and associated Sprinkler Piping as per plans (LL Work - Demo & Whitebox.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Floor 38Under Construction13p · 4 filings · 18 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Modifications to the existing HVAC System: removal of existing ductwork and piping on the 38th and 39th Floors as per plans (LL Work - Demo & Whitebox.) No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Remove (10) water closets, (6) lavs, (3) urinals, (2) HWHs, (2) sinks on the 38th Floor and (10) water closets, (6) lavs, (3) urinals, (2) HWHs, (2) sinks and associated piping on the 39th Floor as per plans. (LL Work - Demo & Whitebox.)
On file for this project
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 38-39th Floors as per plans (LL Work - Demo & Buildout.) No change to use, egress or occupancy.
On file for this project
4 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 37
Floor 36
Floor 35
Floor 34
Floor 336p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
PLUMBING/SPRINKLER FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
11 documents · 1 drawing sheet
Modifications to the existing HVAC System; Redistribution of ductwork on the 33rd Floor as per plans (Screen Vision.) No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Install NEW Plumbing Fixtures: (9) Water Closets, (7) Lavatories, (2) UR, (2) Coffeemakers, (1) pantry sink, (1) dishwasher, (1) chiller and associated CW/sanitary piping onthe 33rd Floor as per plans (Screen Vision.) No change to use, egress or occupancy
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 32Under Construction51p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing Sprinkler System: Remove (9) sprinkler heads and Install (15) new heads and associated Sprinkler Piping on the 32nd Floor as per plans (Elevator Lobby, Corridor & Restrooms.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 32nd Floor as per plans (Elevator Lobby, Corridors & Restrooms.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC System on the 32nd Floor as per plans (Elevator Lobby, Corridors & Restrooms.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 31
Floor 30Under Construction8p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing
Removal of existing plumbing fixtures and Install (2) urinals, (8) water closets, (9) lavatories, (1) HWH and associated CW/sanitary piping on the 30th Floor as per plans. (Hines - Demo, Whitebox Restrooms.) No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to the existing HVAC System: Remove ductwork, piping and equipment back to building core on the 30th Floor as per plans (Hines - Full Floor Demo & Whitebox.) No change to use, egress or occupancy.
On file for this project
15 documents · 1 drawing sheet
Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor as per plans (Hines - Demo, Whitebox & Bathrooms.) No change to use, egress or occupancy.
On file for this project
8 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 29
Floor 2812p · 6 filings · 20 docs
DMFire ProtectionGeneralMechanicalPlumbing
PLUMBING/SPRINKLER FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 27Under Construction66p · 2 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
STRUCTURAL WORK ON 26TH AND 27TH FLOORS AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
On file for this project
26 documents · 19 drawing sheets
Various Ductwork Changes
On file for this project
7 documents
Floor 26Under Construction59p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
STRUCTURAL WORK ON 26TH AND 27TH FLOORS AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
On file for this project
26 documents · 4 drawing sheets
Minor demolition; removal of partitions & finishes; Install new partitions, doors, suspended ceilings and floor finishes on the 6, 7, 9, 10, 12 & 26th Floors as per plans (Demo, Whitebox, Corridors, Restrooms.) No change to use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
INSTALLATION OF NEW SPRINKLER HEADS AND ASSOCIATED PIPING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 25
Floor 244p · 3 filings · 20 docs
CivilFire ProtectionMechanicalPlumbing
INSTALL DUCTWORK AND ASSOCIATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
Various Ductwork Changes
On file for this project
8 documents · 1 drawing sheet
INSTALL PLUMBING FIXTURES AND PIPING. INSTALL SPRINKLER HEADS AND PIPING.
On file for this project
7 documents · 2 drawing sheets
Floor 23
Floor 22Under Construction32p · 5 filings · 16 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing HVAC System on the 19-22nd Floors as per plans (Authentic Brands Group.) No change to use, egress or occupancy.
On file for this project
3 documents
Remove (30) temp heads on 19, (68) heads on 20, and (16) on the 21 & 22nd Floors; Install (238) new heads on 19, (38) heads on 20, (16) heads on the 21st and (23) heads on the 22nd Floor and associated Sprinkler Piping as per plans (Authentic Brands.)
On file for this project
4 documents
Structural Modifications: Structural Steel and installation of stairs on the 19-22nd Floors as per plans (Authentic Brands Group.) No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 21Under Construction26p · 4 filings · 13 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Modifications to the existing HVAC System on the 19-22nd Floors as per plans (Authentic Brands Group.) No change to use, egress or occupancy.
On file for this project
3 documents
Remove (30) temp heads on 19, (68) heads on 20, and (16) on the 21 & 22nd Floors; Install (238) new heads on 19, (38) heads on 20, (16) heads on the 21st and (23) heads on the 22nd Floor and associated Sprinkler Piping as per plans (Authentic Brands.)
On file for this project
4 documents
Structural Modifications: Structural Steel and installation of stairs on the 19-22nd Floors as per plans (Authentic Brands Group.) No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 20Under Construction28p · 5 filings · 17 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Modifications to the existing HVAC System on the 19-22nd Floors as per plans (Authentic Brands Group.) No change to use, egress or occupancy.
On file for this project
3 documents
Remove (30) temp heads on 19, (68) heads on 20, and (16) on the 21 & 22nd Floors; Install (238) new heads on 19, (38) heads on 20, (16) heads on the 21st and (23) heads on the 22nd Floor and associated Sprinkler Piping as per plans (Authentic Brands.)
On file for this project
4 documents
Structural Modifications: Structural Steel and installation of stairs on the 19-22nd Floors as per plans (Authentic Brands Group.) No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 19Under Construction13p · 6 filings · 18 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing HVAC System on the 19-22nd Floors as per plans (Authentic Brands Group.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Remove (30) temp heads on 19, (68) heads on 20, and (16) on the 21 & 22nd Floors; Install (238) new heads on 19, (38) heads on 20, (16) heads on the 21st and (23) heads on the 22nd Floor and associated Sprinkler Piping as per plans (Authentic Brands.)
On file for this project
4 documents
Structural Modifications: Structural Steel and installation of stairs on the 19-22nd Floors as per plans (Authentic Brands Group.) No change to use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 1813p · 16 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction
Sprinkler modifications taking place on the 18th floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
General construction modifications taking place on the 18th floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
12 documents · 6 drawing sheets
Minor demolition; removal of partitions & finishes; Install new partitions, doors, suspended ceilings and floor finishes on the 6, 7, 9, 10, 12 & 26th Floors as per plans (Demo, Whitebox, Corridors, Restrooms.) No change to use, egress or occupancy.
On file for this project
12 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 17
Floor 16
Floor 15
Floor 14
Floor 137p · 2 filings · 10 docs
ElectricalGeneralMechanical
Issued Permit Scope
Mechanical Systems
Modifications to the existing HVAC System: Removal of existing piping and duct work, Install new piping and expansion joints and x-ray fittings on the 13th Floor as per plans (Expansion Joint.) No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Modifications to the existing HVAC System: Installation of new PRV Station and new high pressure steam piping in the cellar level and 13th Floor as per plans (PRV Station.) No change to use, egress or occupancy.
On file for this project
7 documents
Floor 1210p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingZ
Minor interior renovation including the installation of private office partitions and associated ceiling and finish work at the cellar level of an existing bank branch. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Minor Interior Demo. Installation of new interior partitions, doors, office fronts, suspended ceilings, millwork, flooring and finishes on the 12th Floor as per plans (Pre-Built Suites.) No change to use, egress or occupancy.
On file for this project
5 documents · 4 drawing sheets
Install new plumbing fixtures: (1) HWH, (1) dishwasher, (1) chiller, (2) sinks, (1) FD and associated CW/sanitary piping on the 12th Floor as per plans (Pre-built Suites.) No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 11
Floor 10Under Construction69p · 16 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing HVAC System on the 10th Floor as per plans (Hines - ADA Restrooms.) No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Plumbing Modifications: Install (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.) No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Remove (1) sprinkler head and Install (2) new heads and associated Sprinkler Piping on the 10th Floor as per plans (Hines - ADA Restroom.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 9Under Construction69p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 9 drawing sheets
MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
STRUCTURAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 811p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Replace Existing Sprinkler System, Install TCSP & Auxiliary Standpipe Fire Hose Cabinet, Various Plumbing Fixture & Piping Changes
On file for this project
20 documents · 7 drawing sheets
Demolition of Existing Air Conditioning Units, Associated Piping, Ductwork, Install Supplemental Air Conditioning Units, Associated Piping and HVAC Ductwork.
On file for this project
24 documents · 6 drawing sheets
Floor 7Under Construction28p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Filing herewith plumbing work to existing 7th floor space. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Filing herewith interior renovation on existing 7th floor space, United Hospital Fund. No change in use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Filing herewith mechanical work on existing 7th floor space, United Health Fund. No change in use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 635p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Modifications to the existing HVAC System on the 6th Floor as per plans (Elevator Lobby.) No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 6th Floor as per plans (IMEG Tenant Buildout.) No change to use, egress or occupancy.
On file for this project
3 documents · 6 drawing sheets
Modifications to the existing HVAC System: Install AC units, ductwork, VAVs, piping and associated accessories on the 6th Floor as per plans (IMEG Tenant Buildout.) No change to use, egress or occupancy.
On file for this project
3 documents · 11 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 5
Floor 412p · 2 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
Alt CO filed to increase population and establish PA.
On file for this project
13 documents
Structural modifications and installation of new steel beams and slab infill as per plans (USA Legwear.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 316p · 4 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
Alt CO filed to increase population and establish PA.
On file for this project
13 documents
Modifications to the existing sprinkler system: Removal of (54) existing sprinkler heads and Installation of (41) new sprinkler heads and associated piping on the 3rd Floor as per plans (USA Legwear.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Install NEW fixtures: (4) sinks, (1) HWH, (2) showers, (5) FDs, (1) cold plunge tank, (2) steam generators, (1) booster pump and associated CW/Sanitary piping on the 3rd Floor as per plans (USA Legwear - Gym.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 211p · 1 filing · 13 docs
Architecture
Issued Permit Scope
General Construction
Alt CO filed to increase population and establish PA.
On file for this project
13 documents
Floor 1Under Construction28p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Parking Structure Repair Program. No change to use, occupancy or egress.
On file for this project
5 documents
SPRINKLER SCOPE INCLUDES THE RECONFIGURATION OF NEW MAIN BRANCH DISTRIBUTION AND SPRINKLER HEADS AS PER SPRINKLER PLANS TAPPING OFF OF EXISTING BUILDING SYSTEM. NO CHANGE IN EXISTING SPRINKLER VALVE ASSEMBLY.
On file for this project
21 documents · 14 drawing sheets
Alt CO filed to increase population and establish PA.
On file for this project
13 documents
Latest 3 of 6 filings on this floor.
CellarUnder Construction29p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
Parking Structure Repair Program. No change to use, occupancy or egress.
On file for this project
5 documents · 1 drawing sheet
SPRINKLER SCOPE INCLUDES THE RECONFIGURATION OF NEW MAIN BRANCH DISTRIBUTION AND SPRINKLER HEADS AS PER SPRINKLER PLANS TAPPING OFF OF EXISTING BUILDING SYSTEM. NO CHANGE IN EXISTING SPRINKLER VALVE ASSEMBLY.
On file for this project
21 documents · 9 drawing sheets
Modifications to the existing Sprinkler System: Install (1) new heads and sprinkler piping on the Cellar as per plans (LL Work - Security Modernization.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Sub-CellarUnder Construction13p · 2 filings · 18 docs
ArchitectureStructural
Issued Permit Scope
General Construction
Parking Structure Repair Program. No change to use, occupancy or egress.
On file for this project
5 documents · 2 drawing sheets
Alt CO filed to increase population and establish PA.
On file for this project
13 documents
Basement5p · 1 filing · 3 docs
ArchitectureDMMechanical
Minor interior renovation including the installation of private office partitions and associated finishes at the cellar level of an existing bank branch. No change in use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets