← Back
One story retail building
1414 CASTLETON AVENUE
STATEN ISLAND · BIN 5106981
💬 Discuss this project
1941Year Built
1Stories
K1Building Class
R3AZoning
1,412 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 1414 CASTLETON REALTY, LLC · 2,980 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 11p · 1 filing · 3 docs
Cellar1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASIC GROUPS CORP107/15/2026
ASHRAF CORP103/21/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MACKENZIE, DOUGLASElectrical103/21/2026
RODRIGUEZ, GIANFRANCOElectrical103/21/2026
K & BH PLUMBING & HTG INCPlumbing107/08/2026
Building Lifecycle
All (21)Filed (2)Permit Issued (1)Violation (15)Inspection (3)
07/15/2026
Filed — Alteration
REPLACEMENT OF AC OUTDOOR UNIT @ROOF. PROPOSED MECHANICAL WORK AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY
S01428385-I1
03/04/2025
Violation issued (FDNY_NOV, closed)
08/06/2024
Violation issued (FDNY_ORDER, closed)
01/29/2024
Violation issued (FDNY_NOV, closed)
09/13/2022
Violation issued (FDNY_NOV, closed)
04/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2021
Permit issued — Plumbing
S00481786-I1-PL
03/21/2021
Filed — Alteration
APPLICATION TO FILE EXIST. ELECTRICAL COOKING EQUIPMENT CONVERT TO GAS, 01 GAS METER, 01 HWH, 01 HEATER UNIT AND 01 HAND SINNK AT 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00481786-I1
09/04/2019
Violation issued (FDNY_NOV, closed)
09/04/2019
Violation issued (FDNY_NOV, closed)
03/17/2018
Violation issued (FDNY_NOV, closed)
03/17/2018
Violation issued (FDNY_NOV, closed)
12/11/2017
Violation issued (FDNY_NOV, closed)
12/11/2017
Violation issued (FDNY_NOV, closed)
11/27/2013
Violation issued (FDNY_NOV, closed)
07/07/2009
Violation issued (FDNY_NOV, closed)
04/17/2008
Violation issued (FDNY_NOV, closed)
07/05/2000
Violation issued (FDNY_NOV, closed)
12/12/1989
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offK & BH PLUMBING & HTG INC07/07/2021
BISFPISSUEDMASTER FIRE SYSTEMS, INC10/23/2000
BISPLISSUEDABLE PLUMBING11/15/1995
BISOTISSUEDN/A05/25/1995
1 project · most recent 07/15/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/15/2026——Air Conditioning Systems
Cooling
Aciq AC-I-48AC14 46,000 BTU · Condensing Unit ×1
1 project · most recent 03/21/2021
Gas Water/Sanitary
FiledStatusContractorScope
03/21/2021Signed-offK & BH PLUMBING & HTG INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026S00481786-I1Request digital key ↗
08/16/2026S01428385-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026S00481786-I1Open ↗
08/16/2026S01428385-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026S00481786-I1Open ↗