← Back
BuildNYC
Five to six families
Amelia Valenti
1415 ROWLAND STREET · BIN 2041706
💬 Discuss this project
1927Year Built
3Stories
C2Building Class
R6Zoning
5,100 sfGross Floor Area
6Units
Rent Stabilized4 Active Violations ▸
Five to six families · 2,625 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 7 docs
Floor 21p · 1 filing · 16 docs
Floor 1
BasementBoiler replacement4p · 3 filings · 20 docs
Sub-BasementBoiler replacement11p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1906-08 Amethyst Construction403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering601/22/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
East Coast MechanicalPlumbing807/08/2026
East Coast PetroleumGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808401/22/2024
Building Lifecycle
04/14/2026
Closed: Boiler: boiler (DOB violation)
DOB violation · closed on the city's record
12/10/2025
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
12/10/2025
§ 27-2033 ADM code provide ready access to buildings heating system door was locked at boiler room
HPD violation · closed
12/10/2025
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
12/10/2025
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
214 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEast Coast Petroleum09/16/2025
DOB NOWBoiler EquipmentSigned-offEast Coast Mechanical09/13/2023
DOB NOWPlumbingSigned-offEast Coast Mechanical09/13/2023
DOB NOWBoiler EquipmentSigned-offEast Coast Mechanical10/19/2022
DOB NOWBoiler EquipmentSigned-offEast Coast Petroleum10/18/2022
DOB NOWPlumbingSigned-offEast Coast Mechanical08/24/2022
DOB NOWPlumbingSigned-offEast Coast Mechanical06/14/2022
DOB NOWBoiler EquipmentSigned-offEast Coast Petroleum11/30/2021
DOB NOWBoiler EquipmentSigned-offEast Coast Petroleum07/21/2021
DOB NOWBoiler EquipmentSigned-offEast Coast Mechanical07/21/2021
DOB NOWPlumbingSigned-offEast Coast Mechanical07/20/2021
BISOTISSUEDSajid Construction04/03/2020
BISOTISSUEDSajid Construction05/03/2019
BISPLISSUEDPrime Piping & Heating04/16/2019
BISBLISSUEDPrime Piping & Heating04/10/2019
BISPLISSUEDPrime Piping & Heating04/10/2019
BISOTISSUEDSajid Construction10/03/2018
BISOTISSUEDSajid Construction07/24/2018
BISEQISSUEDSwing Staging12/11/1990
1 project · most recent 01/22/2024
Gas Water/Sanitary
FiledStatusContractorScope
01/22/2024Signed-offEast Coast MechanicalGas, Water/Sanitary
2 projects · most recent 06/17/2019
General Wiring
FiledStatusContractorScope
06/17/2019CompleteWord of Light Electric—
05/12/2019CompleteWord of Light ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2024Pass-Final Boiler Equipment InspectionPassView ↗
02/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/20/2022Fail-Final Boiler Equipment InspectionFailView ↗
06/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/23/2024Fire-Resistant Penetrations and JointsJoseph Bazinispecial
11/07/2023Fire-Resistant Penetrations and JointsJoseph Bazinispecial
08/06/2020HVAC and service water heating equipment Joseph Bazinienergy_progress
08/06/2020Mechanical SystemsJoseph Bazinispecial
08/06/2020Chimneys and ventsJoseph Bazinispecial
08/06/2020FinalJoseph Baziniprogress
68 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account