← Back
Factory, tank farm
1416 FERRIS PLACE
BRONX · BIN 2027192
💬 Discuss this project
1932Year Built
1Stories
F8Building Class
M3-1Zoning
2,754 sfGross Floor Area
1Units
0 Open Violations
Factory, tank farm · Owner of record: BONITA QOZ, LLC · 31,625 sf lot · 0.09 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof2p · 2 filings · 10 docs
Floor 19p · 1 filing · 20 docs
Cellar11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
635 COLUMBUS709/15/2026
UPTOWN CONSTRUCTION GROUP307/08/2026
300 ZER804/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS308/12/2026
KENNETH KOONS, ARCHITECTS208/09/2021
SYED ENGINEERING, P.C.111/07/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.203/21/2026
GERALD J CALIENDO R A A I A203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COTTAM HEATING & AIR CONDIT.General Contractor203/21/2026
IMPACT BUILDERS CORPGeneral Contractor107/08/2026
UPTOWN CONSTRUCTION GROUPGeneral Contractor107/08/2026
NEW PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323308/12/2026
KENNETH KOONS, ARCHITECTS1548108/09/2021
Building Lifecycle
All (43)Filed (6)Permit Issued (4)Signed Off (3)Violation (11)Inspection (2)Objection (10)Special Inspection (7)
08/12/2026
Filed — Alteration CO
Alteration 01 to do minor change in a 1 story commercial office and get C/O.
X01267619-P2
12/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/11/2025
Filed — Alteration CO
Alteration 01 to do minor change in a 1 story commercial office and get C/O.
X01267619-P1
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2025
Permit issued — General Construction
X01267619-I1-GC
09/18/2025
Objection raised — Admin
09/18/2025
Objection resolved — Addressed
09/12/2025
Objection resolved — Addressed
09/10/2025
Objection raised — Energy
09/04/2025
Objection resolved — Addressed
08/25/2025
Objection raised — Admin
08/18/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Admin
08/11/2025
Objection raised — Admin
08/07/2025
Filed — Alteration CO
Alteration 01 to do minor change in a 1 story commercial office and get C/O.
X01267619-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2021
Signed off — Alteration
NEW ROOFTOP HVAC UNIT TO REPLACE EXISTING
X00561601-I1
09/13/2021
Signed off — Alteration
NEW GAS LINE & GAS PIPING TO HVAC UNIT
X00561608-I1
09/01/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2021
Permit issued — Mechanical Systems
X00561601-I1-MS
08/12/2021
Permit issued — Plumbing
X00561608-I1-PL
08/09/2021
Filed — Alteration
NEW ROOFTOP HVAC UNIT TO REPLACE EXISTING
X00561601-I1
08/09/2021
Filed — Alteration
NEW GAS LINE & GAS PIPING TO HVAC UNIT
X00561608-I1
07/20/2021
Special inspection requirement — Mechanical Systems
Kenneth Koons
07/20/2021
Special inspection requirement — Final
Kenneth Koons
06/23/2020
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00260289-I1
11/08/2019
Permit issued — Construction Fence
X00260289-I1-FN
11/07/2019
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00260289-I1
11/06/2019
Special inspection requirement — Final
RAFI HAMID
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1990
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP09/26/2025
DOB NOWMechanical SystemsSigned-offCOTTAM HEATING AIR COND08/12/2021
DOB NOWPlumbingSigned-offNEW PLBG & HTG CORP08/12/2021
DOB NOWConstruction FenceSigned-offUPTOWN CONSTRUCTION GROUP11/08/2019
BISMHISSUEDFRED M. SCHILDWACHTER & SONS, IN08/25/1999
1 project · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026CompleteDCE CORPORATIONGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/01/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/23/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
12/23/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
12/11/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
12/11/2025Tenant Protection Plan Compliance—special
07/20/2021Mechanical SystemsKenneth Koonsspecial
07/20/2021FinalKenneth Koonsprogress
11/06/2019FinalRAFI HAMIDprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/25/2026X00561608-I1Request digital key ↗
08/25/2026X00561601-I1Request digital key ↗
08/17/2026X01267619-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026X00260289-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01267619-P1Open ↗
08/13/2026X01267619-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026X00260289-I1Open ↗
08/25/2026X00561608-I1Open ↗
08/25/2026X00561601-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026X01267619-P1Open ↗
08/27/2026X01267619-I1Open ↗
08/27/2026X01267619-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026X00260289-I1Open ↗
08/22/2026X00561601-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026X01267619-P2Open ↗
08/13/2026X01267619-I1Open ↗
08/13/2026X01267619-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026X00561608-I1Open ↗
08/25/2026X00561601-I1Open ↗
08/17/2026X01267619-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00561608-I1Open ↗
08/13/2026X00561601-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/17/2026X01267619-I1Open ↗
08/17/2026X01267619-P1Open ↗
08/17/2026X01267619-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01267619-I1Open ↗