← Back
BuildNYC
Over six families without stores
1418 CLINTON AVENUE
BRONX · BIN 2009811
💬 Discuss this project
1931Year Built
5Stories
C1Building Class
R6Zoning
10,110 sfGross Floor Area
10Units
Rent Stabilized23 Active Violations ▸
Over six families without stores · Owner of record: Beulah Cluster Housing Development Fund Company · 2,800 sf lot · 3.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1Heavy duty sidewalk shed installation5p · 2 filings · 20 docs
Cellar5p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installation3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Beulah HDFC2307/08/2026
NYC Department of Housing Preservation and Development903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ocv Architects603/15/2025
Enthink Engineers207/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ocv Architects603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jimmy G ConstructionScaffold707/08/2026
Conrock ConstructionGeneral Contractor407/08/2026
GBL MechanicalPlumbing407/08/2026
St Marks Plumbing & HeatingPlumbing203/21/2026
Perimeter Bridge ScaffoldGeneral Contractor103/21/2026
Triera ContractingScaffold107/08/2026
Jerome ConstructionGeneral Contractor103/21/2026
Daff MechanicalPlumbing112/03/2002
Daff MechnicalPlumbing112/03/2002
Expert Sprinkler MaintanceFire Protection112/03/2002
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Skyline Engineering267703/15/2025
Building Lifecycle
09/07/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST…
HPD violation · open
09/07/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · open
09/07/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 1B, 1st STORY,…
HPD violation · open
09/07/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · open
09/07/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM EAST AT…
HPD violation · open
149 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offConrock Construction09/18/2024
DOB NOWPlumbingSigned-offLiquid Tech Plumbing & Heating07/02/2024
DOB NOWGeneral ConstructionSigned-offConrock Construction04/12/2024
DOB NOWBoiler EquipmentSigned-offLiquid Tech Plumbing & Heating01/11/2024
DOB NOWBoiler EquipmentSigned-offLiquid Tech Plumbing & Heating09/19/2023
DOB NOWGeneral ConstructionSigned-offConrock Construction04/24/2023
DOB NOWGeneral ConstructionSigned-offConrock Construction07/25/2022
DOB NOWSidewalk ShedSigned-offTriera Contracting07/08/2022
DOB NOWSidewalk ShedPermit IssuedJimmy G Construction09/14/2021
DOB NOWSidewalk ShedPermit IssuedJimmy G Construction04/20/2021
DOB NOWSidewalk ShedPermit IssuedJimmy G Construction01/31/2021
DOB NOWSidewalk ShedPermit IssuedJimmy G Construction12/02/2020
DOB NOWSidewalk ShedPermit IssuedJimmy G Construction05/06/2020
BISEQISSUEDPerimeter Bridge & Scaffold04/04/2003
BIS—ISSUEDJerome Construction04/01/2003
BISEQISSUEDPerimeter Bridge & Scaffold12/04/2002
BISSPISSUEDExpert Fire Sprinkler12/03/2002
BISPLISSUEDDaff Mechnical12/03/2002
BISPLISSUEDDaff Mechanical12/03/2002
BISOTISSUEDBLK Iron & Construction Work09/21/1995
BISOTISSUEDSt Marks P & H04/26/1995
BISPLISSUEDSt Marks P & H04/26/1995
BISEQISSUEDAtlantic Scaffolding04/12/1995
BISOTISSUEDTma Renovations04/10/1995
2 projects · most recent 07/08/2022
FiledStatusContractorScope
07/08/2022CompleteRichard Neu—
05/12/2020CompleteRichard Neu—
1 project · most recent 05/05/2020
Sidewalk Shed
FiledStatusContractorScope
05/05/2020Permit IssuedJimmy G ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/29/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/20/2025Maintenance informationMatthew Wavroenergy_progress
03/20/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
03/20/2025Tenant Protection Plan ComplianceMatthew Wavrospecial
03/14/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
03/14/2025Maintenance informationMatthew Wavroenergy_progress
03/14/2025Tenant Protection Plan Compliance—special
09/24/2024Tenant Protection Plan Compliance—special
09/24/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
09/24/2024Maintenance informationMatthew Wavroenergy_progress
04/15/2024Tenant Protection Plan ComplianceMatthew Wavrospecial
04/15/2024Heating SystemsMatthew Wavrospecial
04/15/2024Maintenance informationMatthew Wavroenergy_progress
04/15/2024HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
04/15/2024HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
04/15/2024HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
10/06/2021FinalJOHN COOGANprogress
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account