← Back
Two family frame
1418 LONGFELLOW AVENUE
BRONX · BIN 2010909
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R7-1Zoning
3,465 sfGross Floor Area
2Units
20 Open Violations ▸
Two family frame · 2,712 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 24p · 2 filings · 12 docs
Floor 14p · 2 filings · 12 docs
Basement1p · 2 filings · 12 docs
Sub-Basement3p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROJAS ENGINEERING, PLLC311/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMC CONSULTING REPS LLCGeneral Contractor207/08/2026
HT PLUMBING & HEATING CORPlumbing107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROJAS ENGINEERING PLLC6232311/24/2023
Building Lifecycle
All (38)Filed (3)Permit Issued (3)Violation (26)Inspection (3)Special Inspection (3)
10/01/2024
Permit issued — General Construction
X08007437-I1-GC
05/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/13/2024
Permit issued — Plumbing
X08007439-I1-PL
11/24/2023
Filed — Alteration
Plumbing work associated with interior renovation under job #X08007437; Removal and installation of plumbing fixtures. Install new electric water heaters and electric boilers
X08007439-P1
10/26/2022
Permit issued — General Construction
X08007437-I1-GC
10/02/2022
Filed — Alteration
Plumbing work associated with interior renovation under job #X08007437; Removal and installation of plumbing fixtures. Install new electric water heaters and electric boilers
X08007439-I1
09/29/2022
Filed — Alteration
X08007437-I1
09/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
09/20/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Darlyn Alvarez
09/20/2022
Special inspection requirement — Final
Darlyn Alvarez
05/24/2021
Violation issued (ECB, closed)
Construction
04/07/2021
Violation issued (ECB, open)
Construction
12/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2020
Violation issued (ECB, closed)
Construction
09/14/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/14/2020
Violation issued (ECB, closed)
Construction
09/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2017
Violation issued (HPD, open)
B
09/20/2017
Violation issued (HPD, open)
B
08/08/2013
Violation issued (HPD, open)
B
08/08/2013
Violation issued (HPD, open)
B
08/08/2013
Violation issued (HPD, open)
B
08/08/2013
Violation issued (HPD, open)
A
08/08/2013
Violation issued (HPD, closed)
C
08/08/2013
Violation issued (HPD, open)
B
08/08/2013
Violation issued (HPD, open)
B
08/08/2013
Violation issued (HPD, open)
B
08/08/2013
Violation issued (HPD, open)
B
08/08/2013
Violation issued (HPD, open)
C
08/08/2013
Violation issued (HPD, open)
A
08/08/2013
Violation issued (HPD, open)
B
02/21/2013
Violation issued (HPD, open)
C
03/11/2009
Violation issued (HPD, open)
B
03/11/2009
Violation issued (HPD, open)
B
03/11/2009
Violation issued (HPD, open)
C
03/11/2009
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMAMC CONSULTING REPS LLC10/01/2024
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR02/13/2024
DOB NOWGeneral ConstructionPermit IssuedMAMC CONSULTING REPS LLC10/26/2022
1 project · most recent 11/24/2023
Water/Sanitary
FiledStatusContractorScope
11/24/2023Signed-offHT PLUMBING & HEATING CORWater/Sanitary
2 projects · most recent 09/19/2025
FiledStatusContractorScope
09/19/2025Permit IssuedCONDE ELECTRIC INC3 meters, 3 new_meters
05/22/2024Permit IssuedPOWER SURGE ELECTRIC, INC5 meters, 5 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/20/2022Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
09/20/2022Structural Stability – Alterations of existing buildingsDarlyn Alvarezspecial
09/20/2022FinalDarlyn Alvarezprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026X08007437-I1Request digital key ↗
08/22/2026X08007439-I1Request digital key ↗
08/22/2026X08007439-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026X08007439-I1Open ↗
08/13/2026X08007439-P1Open ↗
08/13/2026X08007437-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026X08007437-I1Open ↗
08/22/2026X08007437-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026X08007437-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026X08007439-I1Open ↗
08/13/2026X08007439-P1Open ↗
08/13/2026X08007437-I1Open ↗