← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Highbridge Rising
1419 UNIVERSITY AVENUE · BIN 2003545
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R7-1Zoning
26,400 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized33 Active Violations 29 unresolved · 4 paperwork only ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · 5,000 sf lot · 5.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHighbridge Community Housing Development Funding CorporationUnder Construction90p · 1 filing · 20 docs
Floor 6Highbridge Community Housing Development Funding CorporationUnder Construction70p · 1 filing · 20 docs
Floor 5Highbridge Community Housing Development Funding CorporationUnder Construction70p · 1 filing · 20 docs
Floor 4Highbridge Community Housing Development Funding CorporationUnder Construction70p · 1 filing · 20 docs
Floor 3Highbridge Community Housing Development Funding CorporationUnder Construction70p · 1 filing · 20 docs
Floor 2Highbridge Community Housing Development Funding CorporationUnder Construction70p · 1 filing · 20 docs
Floor 1Highbridge Community Housing Development Funding CorporationUnder Construction80p · 1 filing · 20 docs
CellarHighbridge Community Housing Development Funding CorporationUnder Construction84p · 1 filing · 20 docs
Site & exteriorHighbridge Community Housing Development Funding CorporationUnder Construction61p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Highbridge Community Development4511/14/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Florinela Muresan811/13/2026
Paul A. Castrucci, Architect304/21/2026
Joel Phagoo P.E.103/05/2026
Gace412/18/2025
Royal T&E103/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service203/21/2026
William Vitacco Associates1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Notias ConstructionGeneral Contractor304/09/2026
Akm Construction NYScaffold310/09/2026
Triera ContractingScaffold303/21/2026
Notias Constructionspecialty_contractor107/02/2026
J-J PlumbingPlumbing107/08/2026
Meo ElectricElectrical103/21/2026
United One MechanicalPlumbing110/06/2026
Techno-Volt ElectricElectrical203/22/2026
CS BridgeGeneral Contractor109/28/2010
Danica PlumbingPlumbing107/18/1991
Dave RestorationGeneral Contractor112/21/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab53441511/13/2026
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/13/2026
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND COTNROLS. REPLACEMENT OF EXISTING WINDOW AC UNIT.
X01208224-A1
11/13/2026
Filed — Alteration
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND COTNROLS. REPLACEMENT OF EXISTING WINDOW AC UNIT.
X01208224-A2
10/08/2026
Permit renewed — Sidewalk Shed
Renewed with changes
X01360020-I1-SH
10/05/2026
Permit issued — Plumbing
X01208224-S2-PL
201 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY10/08/2026
DOB NOWPlumbingPermit IssuedUnited One Mechanical10/05/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY06/24/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY03/06/2026
DOB NOWBoiler EquipmentPermit IssuedJ-J Plumbing12/24/2025
DOB NOWGeneral ConstructionPermit IssuedNotias Construction12/24/2025
DOB NOWGeneral ConstructionPermit IssuedNotias Construction12/23/2025
DOB NOWMechanical SystemsPermit IssuedNotias Construction12/23/2025
DOB NOWStructuralPermit IssuedNotias Construction12/23/2025
DOB NOWSidewalk ShedPermit IssuedTriera Contracting03/22/2019
BISOTISSUEDDave Restoration12/21/2018
BISEQISSUEDCS Bridge09/28/2010
BISBLISSUEDDanica Plumbing07/18/1991
1 project · most recent 11/13/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
11/13/2026Permit IssuedNotias ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 11/13/2026
FiledStatusContractorScope
11/13/2026———
1 project · most recent 11/13/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
11/13/2026Permit IssuedUnited One MechanicalGas, Plumbing-Sprinkler, Storm, Water/Sanitary
5 projects · most recent 11/15/2026
General Wiring
FiledStatusContractorScope
11/15/2026CompleteMonte Electric—
05/12/2026Permit IssuedCentennial Elevator IndustriesGeneral Wiring
02/26/2026Permit IssuedHigh Quality Electric of NYC—
12/17/2025Permit IssuedTechno-Volt ElectricGeneral Wiring
03/22/2019Permit IssuedMeo Electric—
1 project · most recent 11/13/2026
Steel
FiledStatusContractorScope
11/13/2026Permit IssuedUnited One MechanicalSteel
1 project · most recent 03/22/2019
Sidewalk Shed
FiledStatusContractorScope
03/22/2019Permit IssuedTriera ContractingSidewalk Shed
1 project · most recent 11/13/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
11/13/2026Permit IssuedUnited One MechanicalTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
04/23/2026Tenant Protection Plan ComplianceMINA HANNAspecial
04/23/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/23/2026FinalMINA HANNAprogress
04/23/2026Energy Code Compliance InspectionsMINA HANNAprogress
04/23/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
04/23/2026Exterior lighting powerMINA HANNAenergy_progress
04/23/2026Lighting controlsMINA HANNAenergy_progress
04/23/2026Air barrier - visual inspectionMINA HANNAenergy_progress
04/23/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
04/23/2026Fenestration areasMINA HANNAenergy_progress
04/23/2026Lighting in dwelling unitsMINA HANNAenergy_progress
04/23/2026Interior lighting powerMINA HANNAenergy_progress
04/23/2026Fenestration air leakageMINA HANNAenergy_progress
04/20/2026Lighting in dwelling units—energy_progress
04/20/2026Interior lighting power—energy_progress
04/20/2026Lighting controls—energy_progress
04/20/2026Exterior lighting power—energy_progress
03/25/2026Tenant Protection Plan Compliance—special
12/29/2025Fenestration areasMINA HANNAenergy_progress
12/29/2025Fenestration air leakageMINA HANNAenergy_progress
12/29/2025Air barrier - visual inspectionMINA HANNAenergy_progress
12/29/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/29/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
12/29/2025FinalMINA HANNAprogress
12/29/2025Energy Code Compliance InspectionsMINA HANNAprogress
Latest 25 of 93.
150 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account