← Back
BuildNYC
Elevator cooperative
The Barbizon
142-05 ROOSEVELT AVENUE · BIN 4113585
💬 Discuss this project
1965Year Built
6Stories
D4Building Class
R6Zoning
276,203 sfGross Floor Area
235Units
LL97 CoveredRent Stabilized1 Active Violation 3 old, status unconfirmed ▸FISP: UNSAFE
Elevator cooperative · Owner of record: Barbizon Owners · 75,464 sf lot · 3.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOutrigger system, material hoist, facade repairsUnder Construction2p · 2 filings · 6 docs
Floor 7Unit 7065p · 2 filings · 10 docs
Floor 6Unit 622, Unit 624, Unit 6347p · 3 filings · 14 docs
Floor 5Unit 504, Unit 512, Unit 5367p · 3 filings · 20 docs
Floor 4Unit 424, Unit 4364p · 3 filings · 12 docs
Floor 3
Floor 2Unit 210, Unit 2364p · 2 filings · 13 docs
Floor 1Interior renovation of existing office1p · 1 filing · 3 docs
CellarInterior renovation of existing office2p · 1 filing · 3 docs
Site & exteriorSidewalk shed installationUnder Construction13p · 4 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Barbizon Owners2103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zheng Zhong, RA109/22/2026
Cribstone Engineering105/09/2025
Linea103/27/2025
Wla Engineering103/25/2025
Lawrence Marek Architect204/14/2024
David Jhee Architect204/03/2024
Ecoplusdesign103/07/2024
Ashraf104/13/2023
HPL Engineering203/17/2023
All in Yellow103/09/2023
Mei Architect208/30/2022
First Hec Design206/28/2022
Fang Architect104/27/2022
Alpha Home Design201/14/2022
Mehdi Ghazi, P.E.107/09/2019
KZ Engineering111/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Cherico King Architect P403/21/2026
JM Consultant Studio403/21/2026
Archetype Consultants203/21/2026
Green Studio203/21/2026
LC Expediting Services403/21/2026
Synergy Building Consultants103/21/2026
Ibuild Consulting603/21/2026
Sol Building Consulting Services103/21/2026
Wla Engineering P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1209/03/2026
Archlink DesignGeneral Contractor507/08/2026
Xinos ConstructionScaffold409/02/2026
Kle ConstructionGeneral Contractor303/21/2026
LRJ ConstructionGeneral Contractor307/08/2026
Prestige Home GCGeneral Contractor303/21/2026
St Safety ConsGeneral Contractor303/21/2026
Flushing One ConstructionGeneral Contractor303/21/2026
Structure R USGeneral Contractor207/08/2026
Joseph Weinstein ElectricElectrical203/22/2026
Xinos ConstructionGeneral Contractor204/09/2026
Cam Energy Heating & MechanicalPlumbing207/08/2026
Germiniano MendesGeneral Contractor203/21/2026
HD HVAC of NYspecialty_contractor203/21/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
Edwards RolandElectrical103/21/2026
Kraft ElectricElectrical103/21/2026
R & T ElectricalElectrical103/22/2026
V. Vass ElectricElectrical103/21/2026
TLS Construction Group IGeneral Contractor107/08/2026
Zaq ConstructionGeneral Contractor110/20/2026
Tri Borough ScaffoldingScaffold107/08/2026
Champ Plumbing & HeatingPlumbing107/08/2026
Mes ConstructionPlumbing107/08/2026
Centrum ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Dean Mendez Architect, P8621103/25/2025
Wla Engineering1531103/25/2025
Cherico King Architect5674204/14/2024
HPL Engineering5613203/17/2023
Mei Architect8095208/30/2022
Poly Engineer6110206/28/2022
Yan Gao6619201/14/2022
Mehdi Ghazi, P.E.7129107/09/2019
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/19/2026
Permit issued — General Construction
Q01462045-I1-GC
09/29/2026
Co-op apartment 507 sold for $415,000
09/22/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT#504 ONLY, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01462045-I1
09/09/2026
Co-op apartment 519 sold for $418,000
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offZaq Construction10/19/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/02/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction09/01/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY06/08/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction06/05/2026
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction03/26/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY03/16/2026
DOB NOWGeneral ConstructionPermit IssuedXinos Construction03/10/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction03/10/2026
DOB NOWSidewalk ShedPermit IssuedXinos Construction05/09/2025
DOB NOWSuspended ScaffoldPermit IssuedXinos Construction04/24/2025
DOB NOWGeneral ConstructionSigned-offGerminiano Mendes04/09/2025
DOB NOWGeneral ConstructionPermit IssuedXinos Construction04/09/2025
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY03/18/2025
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical07/23/2024
DOB NOWGeneral ConstructionSigned-offLRJ Construction06/17/2024
DOB NOWPlumbingSigned-offCam Energy Heating & Mechanical05/13/2024
DOB NOWGeneral ConstructionPermit IssuedKle Construction04/30/2024
DOB NOWGeneral ConstructionSigned-offLRJ Construction04/25/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY03/20/2024
DOB NOWGeneral ConstructionSigned-offArchlink Design06/22/2023
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY04/13/2023
DOB NOWPlumbingSigned-offMes Construction04/03/2023
DOB NOWGeneral ConstructionSigned-offArchlink Design03/31/2023
DOB NOWGeneral ConstructionSigned-offPrestige Home GC03/30/2023
DOB NOWGeneral ConstructionSigned-offHD HVAC of NY02/01/2023
DOB NOWGeneral ConstructionSigned-offTLS Construction Group I09/29/2022
DOB NOWGeneral ConstructionSigned-offArchlink Design09/13/2022
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building09/13/2022
DOB NOWGeneral ConstructionSigned-offStructure R US07/13/2022
DOB NOWGeneral ConstructionSigned-offFlushing One Construction05/04/2022
DOB NOWGeneral ConstructionSigned-offStructure R US03/25/2022
DOB NOWPlumbingSigned-offChamp Plumbing & Heating02/06/2022
DOB NOWGeneral ConstructionSigned-offSt Safety Cons02/03/2022
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding11/19/2018
BISEQISSUEDTri Borough Scaffolding01/08/2018
BISOTISSUEDXinos Construction09/07/2017
BISEQISSUEDTri Borough Scaffolding12/29/2016
BISPLISSUEDPlumbing & Heating Doctor04/03/2014
BISOTISSUEDAce Tech NY03/31/2014
+ 20 more permits on file
3 projects · most recent 04/14/2024
Water/Sanitary Gas
FiledStatusContractorScope
04/14/2024Signed-offCam Energy Heating & MechanicalGas, Water/Sanitary
08/30/2022Signed-offWatson's Plumbing, Heating, & BuildingWater/Sanitary
07/09/2019——Gas, Water/Sanitary
18 projects · most recent 06/10/2025
General Wiring
FiledStatusContractorScope
06/10/2025Permit IssuedTower Electric—
02/26/2025CompleteIcon ElectricGeneral Wiring
05/01/2024CompleteAkay ElectricGeneral Wiring
10/16/2023CompleteAsko Electric ConstructionGeneral Wiring
05/10/2023CompleteCentrum ElectricGeneral Wiring
05/03/2023CompleteR & T Electrical—
05/02/2023CompleteR & T Electrical—
04/19/2023CompleteJ Y ElectricGeneral Wiring
04/18/2023Permit IssuedIlluminous ElectricGeneral Wiring
04/03/2023CompleteR & T Electrical—
10/21/2022Permit IssuedJoseph Weinstein ElectricGeneral Wiring
09/26/2022CompleteR & T ElectricalGeneral Wiring
04/19/2022CompleteR & T ElectricalGeneral Wiring
03/14/2022CompleteR & T Electrical—
02/17/2022CompleteR & T Electrical—
1 project · most recent 08/30/2022
FiledStatusContractorScope
08/30/2022Signed-offWatson's Plumbing, Heating, & Building—
1 project · most recent 05/09/2025
Sidewalk Shed
FiledStatusContractorScope
05/09/2025Permit IssuedXinos ConstructionSidewalk Shed
1 project · most recent 04/10/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/10/2025Permit IssuedXinos ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
09/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/29/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
03/19/2025FinalLisa Vangelasprogress
04/14/2024Interior lighting powerLAWRENCE MAREKenergy_progress
04/14/2024Lighting controlsLAWRENCE MAREKenergy_progress
04/14/2024Lighting in dwelling unitsLAWRENCE MAREKenergy_progress
04/05/2024FinalDavid Jheeprogress
04/05/2024Energy Code Compliance InspectionsDavid Jheeprogress
04/05/2024Interior lighting powerDavid Jheeenergy_progress
04/01/2024Energy Code Compliance InspectionsLAWRENCE MAREKprogress
04/01/2024Tenant Protection Plan ComplianceLAWRENCE MAREKspecial
04/01/2024Fire-Resistant Penetrations and JointsLAWRENCE MAREKspecial
04/01/2024Tenant Protection Plan ComplianceLAWRENCE MAREKspecial
04/01/2024Fire-Resistant Penetrations and JointsLAWRENCE MAREKspecial
10/13/2023Interior lighting powerDavid Jheeenergy_progress
10/13/2023FinalDavid Jheeprogress
10/13/2023Energy Code Compliance InspectionsDavid Jheeprogress
03/23/2023Energy Code Compliance InspectionsFran Huangprogress
03/23/2023HVAC-R and service water piping design and insulationFran Huangenergy_progress
03/17/2023Fire-Resistant Penetrations and JointsFran Huangspecial
03/15/2023Tenant Protection Plan ComplianceFran Huangspecial
08/29/2022Fire-Resistant Penetrations and JointsSIMING MEIspecial
08/18/2022Fire-Resistant Penetrations and JointsSIMING MEIspecial
01/14/2022Fire-Resistant Penetrations and JointsYAN GAOspecial
11/12/2018FinalKarol Zdancewiczprogress
207 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account