← Back
Two stories - detached, small or mid-size
142-06 HOOK CREEK BOULEVARD
QUEENS · BIN 4612492
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3XZoning
1,428 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,028 sf lot · 0.7 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (1)Violation (1)
07/12/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDM & M PIPING AND HEATING08/29/2025
BISPLISSUEDM & M PIPING AND HEATING08/07/2024
BIS—ISSUEDCEL TECH CONTRACTING CORP12/18/2023
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 108 on file (BIS + DOB NOW)
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION13
06/21/2024421404518Open ↗
06/21/2024421404527Open ↗
04/03/2024421404527Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION8
05/21/2025421404527Open ↗
12/22/2022421404527Open ↗
12/22/2022421404527Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
12/05/2025421404527Open ↗
12/12/2018421404527Open ↗
10/25/2018421404527Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/04/2024421404518Open ↗
07/19/2023421404518Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/31/2017421404527Open ↗
▸BISVERIFY TAX LOT1
06/21/2025421404527Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/01/2017421404527Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/21/2025421404527Open ↗
▸BISZONING DIAGRAM1
09/03/2019421404527Open ↗
▸Seals & Professional Certifications3
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/28/2019421404527Open ↗
08/28/2019421404527Open ↗
08/06/2019421404527Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING3
08/16/2024421404527Open ↗
06/21/2024421404527Open ↗
03/18/2024421404527Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/20/2019421404527Open ↗
07/31/2017421404527Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/14/2025421404527Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/14/2025421404527Open ↗
▸BISSPRINKLER SYSTEMS1
05/14/2025421404527Open ↗
▸BISHEATING SYSTEMS1
05/14/2025421404527Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
03/04/2024421404518Open ↗
07/31/2017421404527Open ↗
▸BISSTREET TREE SIGNOFF1
06/21/2025421404527Open ↗
▸BISSTREET TREES SITE PLAN1
06/21/2025421404527Open ↗
▸Energy Compliance13
▸BISINTERIOR LIGHTING POWER1
05/14/2025421404527Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
05/14/2025421404527Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/14/2025421404527Open ↗
▸BISFENESTRATION AREAS1
05/14/2025421404527Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
05/14/2025421404527Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/03/2024421404527Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/14/2025421404527Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/14/2025421404527Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/14/2025421404527Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/28/2019421404527Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
05/14/2025421404527Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/14/2025421404527Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/14/2025421404527Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/03/2024421404527Open ↗
04/03/2024421404527Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/22/2020421404527Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/14/2025421404527Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/14/2025421404527Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/14/2025421404527Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/14/2025421404527Open ↗
▸BISMASONRY1
05/14/2025421404527Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
05/14/2025421404527Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/06/2019421404527Open ↗
▸BISMECHANICAL SYSTEMS1
05/14/2025421404527Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
12/22/2020421404527Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
05/14/2025421404527Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/14/2025421404527Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
12/22/2020421404527Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/19/2023421404518Open ↗
08/28/2019421404527Open ↗
07/31/2017421404527Open ↗
▸BISSUPERSEDING LETTER3
05/21/2025421404527Open ↗
12/22/2022421404527Open ↗
12/22/2022421404527Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
07/31/2017421404527Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
12/22/2022421404527Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION10
08/16/2024421404527Open ↗
04/03/2024421404527Open ↗
04/03/2024421404527Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
12/22/2022421404527Open ↗
12/22/2022421404527Open ↗
03/18/2021421404527Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
07/31/2017421404527Open ↗
07/26/2017421404518Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/04/2024421404518Open ↗
▸Other Documents7
▸BISPLOT DIAGRAM2
04/03/2024421404527Open ↗
07/31/2017421404527Open ↗
▸BISLOWEST FLOOR ELEVATION1
05/14/2025421404527Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/04/2024421404518Open ↗
▸BISMAINTENANCE INFORMATION1
05/14/2025421404527Open ↗
▸BISPERMANENT CERTIFICATE1
05/14/2025421404527Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
05/14/2025421404527Open ↗