← Back
Two stories - detached, small or mid-size
142-11 122 AVENUE
QUEENS · BIN 4261296
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,288 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,884 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/06/2025$500K—Private party → Private party$388/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/21/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/26/2026
Permit issued — Solar
Q01449128-I1-SL
08/21/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01449128-I1
08/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/21/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/20/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/26/2026
1 project · most recent 08/21/2026
General Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026Permit IssuedSUNRUN INSTALLATION SVC40 panels, 18 kw, 420.45 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/21/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/21/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/20/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/20/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/20/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01449128-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026Q01449128-I1Open ↗
09/23/2026Q01449128-I1Open ↗
09/23/2026Q01449128-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01449128-I1Open ↗
09/23/2026Q01449128-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/22/2026Q01449128-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026Q01449128-I1Open ↗