← Back
Two family converted from one family
142-11 BOOTH MEMORIAL AVE
QUEENS · BIN 4116739
💬 Discuss this project
1935Year Built
2Stories
B3Building Class
R3XZoning
2,452 sfGross Floor Area
2Units
Two family converted from one family · 4,100 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivil
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/17/2021$1.1M—— → —$449/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT102/28/2024
AMERILAND BROOK LLC701/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TT&T CONSTRUCTION INCGeneral Contractor1707/08/2026
AMERGY SOLAR INCGeneral Contractor303/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802102/28/2024
AMERILAND BROOK LLC1506501/24/2024
Building Lifecycle
All (80)Filed (8)Permit Issued (12)Signed Off (5)Inspection (7)Objection (18)Special Inspection (30)
10/09/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q00707124-I1
09/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/01/2024
Signed off — Alteration
INSTALL 10' DROP CURB INCLUDE 1'-6" SPLAYS ON BOTH SIDE.
Q00739372-I1
06/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/30/2024
Permit issued — Mechanical Systems
Q00707124-I1-MS
05/30/2024
Permit issued — Earth Work
Q00707124-I1-GC
05/30/2024
Permit issued — Mechanical Systems
Q00707124-I1-FO-EA
05/30/2024
Permit issued — General Construction
Q00707124-I1-ST
05/16/2024
Permit issued — Curb Cut
Q00739372-I1-CC
05/13/2024
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01011854-I1
05/10/2024
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00684339
Q00684382-I1
05/10/2024
Signed off — Alteration
Q00776967-I1
03/12/2024
Permit issued — Solar
Q01011854-I1-SL
02/28/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01011854-I1
02/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
02/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
02/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
02/28/2024
Special inspection requirement — Final
Chun Feng
02/28/2024
Special inspection requirement — Air barrier - visual inspection
Chun Feng
01/24/2024
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00684339
Q00684382-P2
01/24/2024
Objection resolved — Addressed
01/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — Metering
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
01/24/2024
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
01/18/2024
Objection raised — Other
01/07/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q00707124-P1
10/23/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00684339
Q00684382-P1
10/07/2023
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Structural Steel - Welding
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
10/07/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Final
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Air barrier - visual inspection
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Metering
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Duct leakage testing, insulation and design
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
10/07/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
09/08/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/08/2023
Permit issued — Plumbing
Q00684382-I1-PL
11/09/2022
Permit issued — General Construction
Q00707124-I1-GC
10/18/2022
Permit issued — Construction Fence
Q00776967-I1-FN
09/17/2022
Permit issued — Plumbing
Q00684382-I1-PL
09/15/2022
Permit issued — Structural
Q00707124-I1-GC
08/16/2022
Permit issued — Construction Fence
Q00776967-I1-FN
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTT&T CONSTRUCTION INC05/30/2024
DOB NOWEarth WorkPermit IssuedTT&T CONSTRUCTION INC05/30/2024
DOB NOWMechanical SystemsSigned-offTT&T CONSTRUCTION INC05/30/2024
DOB NOWGeneral ConstructionSigned-offTT&T CONSTRUCTION INC05/30/2024
DOB NOWCurb CutSigned-offTT&T CONSTRUCTION INC05/16/2024
DOB NOWSolarSigned-offAMERGY SOLAR INC03/12/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC02/08/2023
DOB NOWGeneral ConstructionPermit IssuedTT&T CONSTRUCTION INC11/09/2022
DOB NOWConstruction FenceSigned-offTT&T CONSTRUCTION INC10/18/2022
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC09/17/2022
DOB NOWStructuralPermit IssuedTT&T CONSTRUCTION INC09/15/2022
DOB NOWConstruction FenceSigned-offTT&T CONSTRUCTION INC08/16/2022
1 project · most recent 01/07/2024
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/07/2024Signed-offTT&T CONSTRUCTION INCAssociated Ducts and Piping, Heating Systems
Heating
Williamson GWA-105 105,000 BTU · Boiler ×4
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×1,300
Air King EB30BL 130 CFM · Kitchen Exhaust ×4
2 projects · most recent 02/28/2024
General Wiring
FiledStatusContractorScope
02/28/2024CompleteI.P. ELECTRIC INC—
09/20/2022CompleteINTELOGIC ELECTRIC, INC.General Wiring
1 project · most recent 01/07/2024
Masonry
FiledStatusContractorScope
01/07/2024Signed-offTT&T CONSTRUCTION INCMasonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
02/28/2024Fire-Resistant Penetrations and JointsChun Fengspecial
02/28/2024Structural Stability – Alterations of existing buildingsChun Fengspecial
02/28/2024Energy Code Compliance InspectionsChun Fengprogress
02/28/2024FinalChun Fengprogress
02/28/2024Air barrier - visual inspectionChun Fengenergy_progress
01/24/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
01/24/2024MeteringXIAOHONG ZHAOenergy_progress
01/24/2024Permanent certificateXIAOHONG ZHAOenergy_progress
01/24/2024HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
01/24/2024HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
01/24/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
01/24/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
01/24/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
01/24/2024Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
01/24/2024Maintenance informationXIAOHONG ZHAOenergy_progress
10/07/2023Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
10/07/2023Structural Steel - WeldingXIAOHONG ZHAOspecial
10/07/2023Subgrade InspectionsXIAOHONG ZHAOspecial
10/07/2023Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
10/07/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
10/07/2023FinalXIAOHONG ZHAOprogress
10/07/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
10/07/2023Footing and FoundationXIAOHONG ZHAOprogress
10/07/2023Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
10/07/2023Maintenance informationXIAOHONG ZHAOenergy_progress
Latest 25 of 60.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026Q00739372-I1Request digital key ↗
08/26/2026Q00776967-I1Request digital key ↗
08/24/2026Q00684382-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
07/12/2024440727572Open ↗
03/09/2022421804042Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/24/2022440727572Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00707124-P1Open ↗
08/13/2026Q00707124-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00707124-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00707124-P1Open ↗
09/01/2026Q00707124-P1Open ↗
08/28/2026Q00684382-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026Q00776967-I1Open ↗
08/24/2026Q00684382-I1Open ↗
08/24/2026Q00684382-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00707124-P1Open ↗
09/01/2026Q00707124-P1Open ↗
08/28/2026Q00684382-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/24/2022440727572Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00707124-I1Open ↗
08/13/2026Q00707124-P1Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
06/24/2022440727572Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00707124-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00707124-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026Q00707124-P1Open ↗
08/14/2026Q00707124-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00707124-I1Open ↗
08/13/2026Q00684382-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00707124-P1Open ↗
08/13/2026Q00707124-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00707124-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/12/2024440727572Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01011854-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
07/12/2024440727572Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM1
03/09/2022421804042Open ↗
▸BISEFILING COVER SHEET1
03/09/2022421804042Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/24/2022440727572Open ↗
▸Other Documents16
▸BISBPP - SUPPORTING DOCUMENTATION8
07/12/2024440727572Open ↗
07/12/2024440727572Open ↗
07/12/2024440727572Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026Q00707124-P1Open ↗
08/13/2026Q00707124-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00707124-P1Open ↗
08/13/2026Q00707124-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026Q00707124-P1Open ↗
08/14/2026Q00707124-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00707124-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00707124-I1Open ↗