← Back
Two stories - detached, small or mid-size
142-14 FOCH BOULEVARD
QUEENS · Baisley Park · BIN 4260622
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
855 sfGross Floor Area
1Units
1 Open Violation ▸
Two stories - detached, small or mid-size · 2,079 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Cellar4p · 2 filings · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM ENGINEERING PLLC308/19/2026
Building Lifecycle
All (36)Filed (3)Violation (1)Objection (8)Special Inspection (24)
09/15/2026
Objection resolved — Resolved
09/15/2026
Objection resolved — Resolved
09/02/2026
Objection resolved — Addressed
09/01/2026
Objection raised — Other
08/19/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING TWO STORY WITH CELLAR, ONE FAMILY BUILDING AS SHOWN ON PLANS. WORK CONSIST OF NEW PARTITIONS, WINDOWS & DOORS. NO CHANGE IN BULK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED TO RESOLVE ECB VIOLATION AND SWO.
Q01432368-S1
08/19/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING TWO STORY WITH CELLAR, ONE FAMILY BUILDING AS SHOWN ON PLANS. WORK CONSIST OF NEW PARTITIONS, WINDOWS & DOORS. NO CHANGE IN BULK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED TO RESOLVE ECB VIOLATION AND SWO.
Q01432368-I1
08/11/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Inspections
07/31/2026
Objection raised — Scope
07/31/2026
Objection raised — Other
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — Final
07/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/16/2026
Special inspection requirement — Structural Wood Frame
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
07/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/16/2026
Special inspection requirement — Final
07/16/2026
Special inspection requirement — Fenestration air leakage
07/16/2026
Special inspection requirement — Fenestration areas
07/16/2026
Special inspection requirement — Interior lighting power
07/16/2026
Special inspection requirement — Air barrier — testing
07/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/16/2026
Special inspection requirement — Insulation placement and R values
07/16/2026
Special inspection requirement — Air barrier - visual inspection
07/16/2026
Special inspection requirement — Maintenance information
07/02/2026
Filed — Alteration
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION #Q01262053-I1. FILED TO RESOLVE ECB VIOLATION #39187737K & SWO.
Q01426009-I1
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
07/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/02/2026
Special inspection requirement — Maintenance information
07/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/07/2026
Violation issued (ECB, open)
Construction
Nothing on file for this building.
1 project · most recent 07/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/02/2026——Gas, Water/Sanitary
1 project · most recent 08/19/2026
Wood
FiledStatusContractorScope
08/19/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/16/2026Structural Stability – Alterations of existing buildings—special
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Final—progress
07/16/2026Fire-Resistance Rated Construction—progress
07/16/2026Structural Wood Frame—progress
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Structural Stability – Alterations of existing buildings—special
07/16/2026Energy Code Compliance Inspections—progress
07/16/2026Fire-Resistance Rated Construction—progress
07/16/2026Final—progress
07/16/2026Fenestration air leakage—energy_progress
07/16/2026Fenestration areas—energy_progress
07/16/2026Interior lighting power—energy_progress
07/16/2026Air barrier — testing —energy_progress
07/16/2026Fenestration and door U-factor and product ratings—energy_progress
07/16/2026Insulation placement and R values—energy_progress
07/16/2026Air barrier - visual inspection—energy_progress
07/16/2026Maintenance information—energy_progress
07/02/2026Fire-Resistant Penetrations and Joints—special
07/02/2026Energy Code Compliance Inspections—progress
07/02/2026HVAC-R and service water heating equipment—energy_progress
07/02/2026Maintenance information—energy_progress
07/02/2026HVAC-R and service water heating system controls—energy_progress
07/02/2026HVAC-R and service water piping design and insulation—energy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01432368-S1Request digital key ↗
08/20/2026Q01432368-I1Request digital key ↗
08/14/2026Q01426009-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01432368-I1Open ↗
08/20/2026Q01432368-S1Open ↗
08/16/2026Q01426009-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01432368-S1Open ↗
08/20/2026Q01432368-I1Open ↗
08/14/2026Q01426009-I1Open ↗