← Back
Two stories - detached, small or mid-size
142-15 122 AVENUE
QUEENS · Baisley Park · BIN 4261295
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,456 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,644 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/07/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/07/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
04/09/2026
Permit issued — Solar
Q01383212-I1-SL
04/07/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01383212-I1
04/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/07/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/06/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/09/2026
2 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
04/07/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/07/2026
FiledStatusContractorScope
04/07/2026Signed-offSUNRUN INSTALLATION SVC15 panels, 6.75 kw, 315.34 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/07/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/07/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/06/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/06/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/06/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/29/2026Q01383212-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026Q01383212-I1Open ↗
09/02/2026Q01383212-I1Open ↗
09/02/2026Q01383212-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01383212-I1Open ↗
09/02/2026Q01383212-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/29/2026Q01383212-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026Q01383212-I1Open ↗