Two family frame
142-15 58 AVENUE
QUEENS · BIN 4140185
💬 Discuss this project
2024Year Built
2Stories
B2Building Class
R3XZoning
2,525 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 3,950 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
Architecture
Floor 228p · 1 filing · 20 docs
Floor 129p · 1 filing · 20 docs
Cellar28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOMES INC CUSTOMBUILT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2021$920K—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS408/19/2026
ARCHITECTURAL CONCEPT704/29/2026
MOMENTUM SOLAR204/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT803/21/2026
GERALD J. CALIENDO R.A., P.C.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUSTOMBUILT HOMES INCGeneral Contractor507/08/2026
DRM CONSTRUCTION CORPGeneral Contractor303/21/2026
GREEN CONSTRUCTION GROUPGeneral Contractor203/21/2026
PEBBLE CONSTRUCTION INCGeneral Contractor108/26/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
M & M PIPING AND HEATINGPlumbing106/28/2026
TRI STATE PLBG & HTG INCPlumbing107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT36421008/19/2026
MXV SIA LLC9281204/09/2026
Building Lifecycle
All (92)Filed (13)Permit Issued (10)Signed Off (2)Violation (2)Inspection (9)Objection (26)Special Inspection (30)
08/19/2026
Filed — New Building
HEREWITH FILE NEW BUILDING APPLICATION FOR TWO STORY TWO FAMILY DWELLING AND OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q08001927-P3
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Metering
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Masonry
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Final
TARIQ SIDDIQUI
08/17/2026
Special inspection requirement — Protection of exposed foundation insulation
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Air barrier — testing
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
08/12/2026
Permit issued — Curb Cut
Q08041489-I1-CC
08/04/2026
Signed off — Alteration
Q08042849-I1
08/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2026
Inspection — Pass-Final House Connection
Pass
View inspection ↗
07/02/2026
Permit issued — Plumbing
Q08041488-S1-PL
06/10/2026
Permit issued — General Construction
Q08001927-S2-GC-CX
05/12/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
05/12/2026
Special inspection requirement — Sprinkler Systems
MUZAFFAR JAMAL
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
05/06/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/29/2026
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q08041488-S1
04/13/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 10 MODULES, 4.4KW
Q01333260-I1
04/09/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 10 MODULES, 4.4KW
Q01333260-P1
04/09/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/16/2025
Permit issued — Solar
Q01333260-I1-SL
12/12/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS, ROOFTOP, RAILED, GRID-TIED, 10 MODULES, 4.4KW
Q01333260-I1
12/11/2025
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q08041488-P1
09/29/2025
Filed — New Building
HEREWITH FILE NEW BUILDING APPLICATION FOR TWO STORY TWO FAMILY DWELLING AND OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q08001927-P2
08/29/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/29/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/29/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/10/2025
Permit issued — Plumbing
Q08041488-I1-PL
10/16/2024
Violation issued (ECB, closed)
Construction
07/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/26/2023
Objection resolved — Addressed
12/07/2023
Objection raised — Scope
11/27/2023
Filed — Alteration
INSTALLATION OF NEW CURBCUT AS PER DRAWING
Q08041489-I1
11/17/2023
Permit issued — Plumbing
Q08041488-I1-PL
11/02/2023
Permit issued — Foundation
Q08001927-S2-GC-CX
10/24/2023
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q08041488-I1
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedPEBBLE CONSTRUCTION INC08/12/2026
DOB NOWPlumbingPermit IssuedTRI STATE PLBG & HTG INC07/02/2026
DOB NOWGeneral ConstructionSigned-offCUSTOMBUILT HOMES INC06/10/2026
DOB NOWSolarSigned-offMOMENTUM SOLAR12/16/2025
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING07/10/2025
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT11/17/2023
DOB NOWFoundationSigned-offCUSTOMBUILT HOMES INC11/02/2023
DOB NOWGeneral ConstructionPermit IssuedCUSTOMBUILT HOMES INC08/11/2023
DOB NOWConstruction FenceSigned-offDRM CONSTRUCTION CORP06/14/2023
DOB NOWConstruction FenceSigned-offGREEN CONSTRUCTION GROUP05/31/2023
BIS—ISSUEDCUSTOMBUILT HOMES INC07/18/2023
1 project · most recent 08/19/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Signed-offCUSTOMBUILT HOMES INCHeating and Air Conditioning Systems
Heat / Cool
Navien NCB-240/110H NCB-240/110H 102,000 BTU · Boiler ×6
Oxbox J4AC4060A1000AA J4AC3036E1000AA 60,000 BTU ×6
1 project · most recent 04/29/2026
FiledStatusContractorScope
04/29/2026——22 heads
1 project · most recent 04/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/29/2026Permit IssuedTRI STATE PLBG & HTG INCGas, Storm, Water/Sanitary
2 projects · most recent 12/12/2025
General Wiring
FiledStatusContractorScope
12/12/2025CompleteISLAND ELECTRIC CORP—
12/04/2023CompleteSNB ELECTRICAL CONTNG CORGeneral Wiring
1 project · most recent 08/19/2026
Masonry
FiledStatusContractorScope
08/19/2026Signed-offCUSTOMBUILT HOMES INCMasonry
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2026Pass-Final House ConnectionPassView ↗
05/06/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/09/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
08/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/29/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 125
DateRequirementInspectorRole
08/17/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
08/17/2026Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
08/17/2026Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
08/17/2026Interior lighting powerMUZAFFAR JAMALenergy_progress
08/17/2026Maintenance informationMUZAFFAR JAMALenergy_progress
08/17/2026HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
08/17/2026MeteringMUZAFFAR JAMALenergy_progress
08/17/2026HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
08/17/2026Fenestration air leakageMUZAFFAR JAMALenergy_progress
08/17/2026Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
08/17/2026Electric vehicle service equipment requirementsMUZAFFAR JAMALenergy_progress
08/17/2026Fenestration areasMUZAFFAR JAMALenergy_progress
08/17/2026Air barrier — testing MUZAFFAR JAMALenergy_progress
08/17/2026Protection of exposed foundation insulationMUZAFFAR JAMALenergy_progress
08/17/2026Duct leakage testing, insulation and designMUZAFFAR JAMALenergy_progress
08/17/2026Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
08/17/2026Permanent certificateMUZAFFAR JAMALenergy_progress
08/17/2026Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
08/17/2026FinalTARIQ SIDDIQUIprogress
08/17/2026Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
08/17/2026Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
08/17/2026Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
08/17/2026MasonryMUZAFFAR JAMALspecial
08/17/2026Mechanical SystemsMUZAFFAR JAMALspecial
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
Latest 25 of 125.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/25/2026Q08042849-I1Request digital key ↗
08/24/2026Q08001927-P3Request digital key ↗
08/24/2026Q08001927-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
02/18/2023440758814Open ↗
01/20/2023421813782Open ↗
▸BISWORK PERMIT APPLICATION2
10/31/2023421813782Open ↗
10/03/2023421813782Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/31/2023440758814Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026Q08001927-I1Open ↗
08/24/2026Q08001927-P1Open ↗
08/20/2026Q08001927-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 11
08/20/2026Q08001927-P3Open ↗
▸Seals & Professional Certifications89
▸DOB NOWProgress Inspector Seal & Signature66
09/01/2026Q08041488-P1Open ↗
09/01/2026Q08041488-P1Open ↗
09/01/2026Q01333260-I1Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/24/2026Q08001927-P1Open ↗
08/24/2026Q08001927-S2Open ↗
08/24/2026Q08001927-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q08041488-P1Open ↗
09/01/2026Q01333260-I1Open ↗
08/29/2026Q08001927-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/18/2023440758814Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/18/2023440758814Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/24/2026Q08001927-I1Open ↗
08/24/2026Q08001927-P1Open ↗
08/14/2026Q08001927-S2Open ↗
Showing 3 of 4 on file for this type
▸BISGAS CUT-OFF2
10/31/2023421813782Open ↗
10/03/2023421813782Open ↗
▸BISSEWER CUT-OFF2
10/31/2023421813782Open ↗
10/03/2023421813782Open ↗
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist5
08/24/2026Q08001927-P1Open ↗
08/24/2026Q08001927-I1Open ↗
08/20/2026Q08001927-P3Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
10/31/2023421813782Open ↗
10/03/2023421813782Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/24/2026Q08001927-I1Open ↗
08/14/2026Q08001927-S2Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/18/2023440758814Open ↗
▸BISSTREET TREE CHECKLIST1
05/31/2023440758814Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/03/2023421813782Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/31/2023421813782Open ↗
10/03/2023421813782Open ↗
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/14/2026Q08001927-S2Open ↗
08/13/2026Q08001927-S3Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION10
10/31/2023421813782Open ↗
10/31/2023421813782Open ↗
10/31/2023421813782Open ↗
Showing 3 of 10 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
10/31/2023421813782Open ↗
10/03/2023421813782Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026Q01333260-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/31/2023421813782Open ↗
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
10/31/2023421813782Open ↗
10/03/2023421813782Open ↗
01/30/2023421813782Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/18/2023440758814Open ↗
▸BISADDITIONAL INFORMATION1
05/31/2023440758814Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/18/2023440758814Open ↗
▸BISEFILING COVER SHEET1
01/20/2023421813782Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial5
08/24/2026Q08001927-P1Open ↗
08/24/2026Q08001927-I1Open ↗
08/20/2026Q08001927-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/24/2026Q08001927-P1Open ↗
08/24/2026Q08001927-I1Open ↗
08/20/2026Q08001927-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026Q08001927-P1Open ↗
08/24/2026Q08001927-I1Open ↗
08/20/2026Q08001927-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
02/18/2023440758814Open ↗
▸BISTREE REMOVAL: SPEC. ZON. DIST./CPC APPR1
05/31/2023440758814Open ↗
▸DOB NOWAdjoining Owners Notification1
08/14/2026Q08001927-S2Open ↗