← Back
Two family converted from one family
142-22 58 ROAD
QUEENS · BIN 4140236
💬 Discuss this project
1940Year Built
1Stories
B3Building Class
R4AZoning
2,652 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 3,790 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/25/2022$1.3M—Private party → Private party$490/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT203/11/2025
EDWARD LUI ARCHITECT PLLC910/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEFCO ENTERPRISES INCGeneral Contractor603/21/2026
AMERGY SOLAR INCGeneral Contractor303/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802203/11/2025
G ENGINEERING PC7778610/12/2024
TRIANGLE INSPECTION & TES7495410/12/2024
Building Lifecycle
All (73)Filed (11)Permit Issued (4)Signed Off (3)Violation (7)Inspection (6)Objection (12)Special Inspection (30)
04/22/2025
Signed off — Alteration CO
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT-CO #Q08000093-I1 ALTERATION AND CONVERSION OF DETACHED 2-STORY 2-FAMILT HOUSE WITH 2-STORY PLUS CELLAR EXPANSION.
Q08000093-S3
03/14/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01162864-I1
03/11/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01162864-P1
01/22/2025
Violation issued (ECB, closed)
Construction
01/09/2025
Permit issued — Solar
Q01162864-I1-SL
01/08/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01162864-I1
11/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2024
Signed off — Alteration CO
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT-CO #Q08000093-I1 ALTERATION AND CONVERSION OF DETACHED 2-STORY 2-FAMILT HOUSE WITH 2-STORY PLUS CELLAR EXPANSION.
Q08000093-S2
10/12/2024
Filed — Alteration CO
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT-CO #Q08000093-I1 ALTERATION AND CONVERSION OF DETACHED 2-STORY 2-FAMILT HOUSE WITH 2-STORY PLUS CELLAR EXPANSION.
Q08000093-P6
10/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
10/11/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/11/2024
Special inspection requirement — Metering
XIONGCAI GU
10/11/2024
Special inspection requirement — Maintenance information
XIONGCAI GU
10/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
10/11/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIONGCAI GU
10/11/2024
Special inspection requirement — Permanent certificate
XIONGCAI GU
10/11/2024
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
10/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
10/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
10/11/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/30/2024
Filed — Alteration CO
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT-CO #Q08000093-I1 ALTERATION AND CONVERSION OF DETACHED 2-STORY 2-FAMILT HOUSE WITH 2-STORY PLUS CELLAR EXPANSION.
Q08000093-P5
09/25/2024
Special inspection requirement — Metering
XIONGCAI GU
09/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
09/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
09/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
09/25/2024
Special inspection requirement — Maintenance information
XIONGCAI GU
09/25/2024
Special inspection requirement — Permanent certificate
XIONGCAI GU
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
09/25/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIONGCAI GU
09/25/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
09/25/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
09/23/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/23/2024
Special inspection requirement — Heating Systems
XIONGCAI GU
09/23/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIONGCAI GU
09/23/2024
Special inspection requirement — Mechanical Systems
XIONGCAI GU
09/23/2024
Special inspection requirement — Subgrade Inspections
XIONGCAI GU
09/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIONGCAI GU
09/23/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIONGCAI GU
09/23/2024
Special inspection requirement — Footing and Foundation
XIONGCAI GU
09/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2024
Filed — Alteration CO
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT-CO #Q08000093-I1 ALTERATION AND CONVERSION OF DETACHED 2-STORY 2-FAMILT HOUSE WITH 2-STORY PLUS CELLAR EXPANSION.
Q08000093-P3
08/16/2024
Filed — Alteration CO
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT-CO #Q08000093-I1 ALTERATION AND CONVERSION OF DETACHED 2-STORY 2-FAMILT HOUSE WITH 2-STORY PLUS CELLAR EXPANSION.
Q08000093-P4
11/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/20/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/17/2023
Permit issued — Plumbing
Q08000093-S3-PL
07/24/2023
Permit issued — Construction Fence
Q08000093-S2-FN
07/20/2023
Permit issued — Structural
Q08000093-I1-GC-CX
06/12/2023
Filed — Alteration CO
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT-CO #Q08000093-I1 ALTERATION AND CONVERSION OF DETACHED 2-STORY 2-FAMILT HOUSE WITH 2-STORY PLUS CELLAR EXPANSION.
Q08000093-P2
06/02/2023
Filed — Alteration CO
PLUMBING WORK TYPE FILED IN CONJUNCTION WITH ALT-CO #Q08000093-I1 ALTERATION AND CONVERSION OF DETACHED 2-STORY 2-FAMILT HOUSE WITH 2-STORY PLUS CELLAR EXPANSION.
Q08000093-P1
04/10/2023
Objection raised — Inspections
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Scope
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection raised — Fire_Protection
04/10/2023
Objection resolved — Addressed
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC01/09/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP10/17/2023
DOB NOWConstruction FenceSigned-offNEFCO ENTERPRISES INC07/24/2023
DOB NOWStructuralPermit IssuedNEFCO ENTERPRISES INC07/20/2023
1 project · most recent 10/12/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/12/2024Signed-offNEFCO ENTERPRISES INCAir Conditioning Systems, Ventilation Systems
Cooling
Gree GREE MULTI24HP230V1EO 24,000 BTU · Condensing Unit ×4
Tuttokool TUTTOKOOL AAC5036E1000A 36,000 BTU · Condensing Unit ×2
Goodman GOODMAN GSX160481 48,000 BTU · Condensing Unit ×2
Ventilation
Fantech FANTECH SH704 104 CFM · Erv ×4
1 project · most recent 10/12/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/12/2024Signed-offDPH PLUMBING & HTG CORPGas, Storm, Water/Sanitary
2 projects · most recent 01/08/2025
General Wiring
FiledStatusContractorScope
01/08/2025CompleteI.P. ELECTRIC INC—
09/07/2023CompleteCL ELECTRICAL CORPGeneral Wiring
1 project · most recent 10/12/2024
Steel Masonry Wood
FiledStatusContractorScope
10/12/2024Signed-offDPH PLUMBING & HTG CORPSteel, Masonry, Wood
1 project · most recent 10/12/2024
Fence
FiledStatusContractorScope
10/12/2024Signed-offDPH PLUMBING & HTG CORPFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 149
DateRequirementInspectorRole
10/11/2024MeteringXIONGCAI GUenergy_progress
10/11/2024HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
10/11/2024HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
10/11/2024HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
10/11/2024Maintenance informationXIONGCAI GUenergy_progress
10/11/2024Permanent certificateXIONGCAI GUenergy_progress
10/11/2024Energy Code Compliance InspectionsXIONGCAI GUprogress
10/11/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/11/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/11/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIONGCAI GUspecial
10/11/2024Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
09/25/2024Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
09/25/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIONGCAI GUspecial
09/25/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
09/25/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
09/25/2024Energy Code Compliance InspectionsXIONGCAI GUprogress
09/25/2024HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
09/25/2024Maintenance informationXIONGCAI GUenergy_progress
09/25/2024HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
09/25/2024MeteringXIONGCAI GUenergy_progress
09/25/2024HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
09/25/2024Permanent certificateXIONGCAI GUenergy_progress
09/23/2024Air barrier - visual inspectionXIONGCAI GUenergy_progress
09/23/2024Interior lighting powerXIONGCAI GUenergy_progress
09/23/2024HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
Latest 25 of 149.
▾Documents — 185 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026Q08000093-P5Request digital key ↗
08/21/2026Q08000093-P6Request digital key ↗
08/21/2026Q08000093-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q08000093-I1Open ↗
08/13/2026Q08000093-P2Open ↗
08/13/2026Q08000093-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08000093-I1Open ↗
▸Seals & Professional Certifications128
▸DOB NOWProgress Inspector Seal & Signature79
09/19/2026Q08000093-I1Open ↗
09/19/2026Q08000093-I1Open ↗
09/19/2026Q08000093-I1Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature38
09/19/2026Q08000093-I1Open ↗
09/19/2026Q08000093-I1Open ↗
09/19/2026Q08000093-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026Q08000093-P5Open ↗
08/21/2026Q08000093-P6Open ↗
08/21/2026Q08000093-I1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026Q08000093-P1Open ↗
08/13/2026Q08000093-P2Open ↗
08/13/2026Q08000093-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026Q08000093-P4Open ↗
08/21/2026Q08000093-P5Open ↗
08/21/2026Q08000093-P6Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT8
08/13/2026Q08000093-P5Open ↗
08/13/2026Q08000093-I1Open ↗
08/13/2026Q08000093-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q08000093-I1Open ↗
08/13/2026Q08000093-S3Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01162864-I1Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial4
08/13/2026Q08000093-P1Open ↗
08/13/2026Q08000093-P3Open ↗
08/13/2026Q08000093-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q08000093-P1Open ↗
08/13/2026Q08000093-I1Open ↗
08/13/2026Q08000093-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026Q08000093-I1Open ↗
08/21/2026Q08000093-P1Open ↗
08/21/2026Q08000093-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q08000093-P1Open ↗
08/13/2026Q08000093-I1Open ↗
08/13/2026Q08000093-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q08000093-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08000093-I1Open ↗