← Back
Two family converted from one family
142-26 60 AVENUE
QUEENS · BIN 4140313
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R4Zoning
3,065 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 2,200 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 2 docs
Floor 11p · 1 filing · 2 docs
Cellar1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC608/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ZHENG & ASSOCIATES LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAQ CONSTRUCTION INCGeneral Contractor203/21/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
YX CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330308/09/2024
TRIANGLE INSPECTION & TES7495402/02/2022
Building Lifecycle
All (32)Filed (6)Permit Issued (4)Signed Off (2)Violation (4)Special Inspection (16)
12/15/2025
Violation issued (ECB, closed)
Construction
09/10/2024
Permit issued — General Construction
Q01092266-I1-GC
09/04/2024
Violation issued (ECB, closed)
Construction
08/09/2024
Filed — Alteration
Q01092266-I1
02/04/2022
Signed off — Alteration
INSTALL (2)TANKLESS COIL, (1) SHOWER,(1) TOILET,(1) LAVATORY, (1) WASHER,(1) DRYER,(1) SINK & (2) F.D @ CELLAR. (2) SHOWER,(2) TOILET, (2) LAVATORY, (1) SINK & (1) STOVE @ 1ST FL. (3) SHOWER,(3) TOILET,(3) LAVATORY, (1) SINK & (1) STOVE @ 2ND FL.
Q00222338-I1
02/02/2022
Filed — Alteration
INSTALL (2)TANKLESS COIL, (1) SHOWER,(1) TOILET,(1) LAVATORY, (1) WASHER,(1) DRYER,(1) SINK & (2) F.D @ CELLAR. (2) SHOWER,(2) TOILET, (2) LAVATORY, (1) SINK & (1) STOVE @ 1ST FL. (3) SHOWER,(3) TOILET,(3) LAVATORY, (1) SINK & (1) STOVE @ 2ND FL.
Q00222338-P3
02/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
02/02/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
02/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
02/02/2022
Special inspection requirement — HVAC and service water heating system controls
Jinfar Liu
02/02/2022
Special inspection requirement — HVAC insulation and sealing
Jinfar Liu
02/02/2022
Special inspection requirement — HVAC and service water heating equipment
Jinfar Liu
02/02/2022
Special inspection requirement — Electrical energy consumption
Jinfar Liu
08/25/2021
Signed off — Alteration
Q00284299-I1
02/11/2021
Filed — Alteration
INSTALL (2)TANKLESS COIL, (1) SHOWER,(1) TOILET,(1) LAVATORY, (1) WASHER,(1) DRYER,(1) SINK & (2) F.D @ CELLAR. (2) SHOWER,(2) TOILET, (2) LAVATORY, (1) SINK & (1) STOVE @ 1ST FL. (3) SHOWER,(3) TOILET,(3) LAVATORY, (1) SINK & (1) STOVE @ 2ND FL.
Q00222338-P2
02/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
02/11/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/11/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
02/11/2021
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
02/11/2021
Special inspection requirement — Electrical energy consumption
Jinfar Liu
02/11/2021
Special inspection requirement — HVAC insulation and sealing
Jinfar Liu
02/11/2021
Special inspection requirement — HVAC and service water heating system controls
Jinfar Liu
02/11/2021
Special inspection requirement — HVAC and service water heating equipment
Jinfar Liu
12/22/2020
Permit issued — Plumbing
Q00222338-I1-PL
07/30/2020
Filed — Alteration
INSTALL (2)TANKLESS COIL, (1) SHOWER,(1) TOILET,(1) LAVATORY, (1) WASHER,(1) DRYER,(1) SINK & (2) F.D @ CELLAR. (2) SHOWER,(2) TOILET, (2) LAVATORY, (1) SINK & (1) STOVE @ 1ST FL. (3) SHOWER,(3) TOILET,(3) LAVATORY, (1) SINK & (1) STOVE @ 2ND FL.
Q00222338-P1
03/03/2020
Permit issued — Plumbing
Q00222338-I1-PL
01/24/2020
Permit issued — Construction Fence
Q00284299-I1-FN
01/03/2020
Filed — Alteration
INSTALL (2)TANKLESS COIL, (1) SHOWER,(1) TOILET,(1) LAVATORY, (1) WASHER,(1) DRYER,(1) SINK & (2) F.D @ CELLAR. (2) SHOWER,(2) TOILET, (2) LAVATORY, (1) SINK & (1) STOVE @ 1ST FL. (3) SHOWER,(3) TOILET,(3) LAVATORY, (1) SINK & (1) STOVE @ 2ND FL.
Q00222338-I1
12/18/2019
Filed — Alteration
Q00284299-I1
11/17/2005
Violation issued (ECB, closed)
Quality of Life
11/17/2005
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedZAQ CONSTRUCTION INC09/10/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC12/22/2020
DOB NOWPlumbingSigned-offDW PLUMBING INC03/03/2020
DOB NOWConstruction FenceSigned-offYX CONSTRUCTION INC01/24/2020
BIS—ISSUEDYX CONSTRUCTION INC07/01/2021
BIS—ISSUEDYX CONSTRUCTION INC01/27/2020
BIS—ISSUEDYX CONSTRUCTION INC01/27/2020
BISPLISSUEDDUNDEE PLBG & HTG INC12/29/2005
BISOTISSUEDN/A12/19/2005
1 job · most recent 03/09/2020
General Wiring
FiledStatusContractorScope
03/09/2020CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
02/02/2022Fire-Resistant Penetrations and JointsJinfar Liuspecial
02/02/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/02/2022Energy Code Compliance InspectionsJinfar Liuprogress
02/02/2022Fire-Resistance Rated ConstructionJinfar Liuprogress
02/02/2022HVAC and service water heating system controls Jinfar Liuenergy_progress
02/02/2022HVAC insulation and sealing Jinfar Liuenergy_progress
02/02/2022HVAC and service water heating equipment Jinfar Liuenergy_progress
02/02/2022Electrical energy consumptionJinfar Liuenergy_progress
02/11/2021Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
02/11/2021Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/11/2021Energy Code Compliance InspectionsJinfar Liuprogress
02/11/2021Fire-Resistance Rated ConstructionJinfar Liuprogress
02/11/2021Electrical energy consumptionJinfar Liuenergy_progress
02/11/2021HVAC insulation and sealing Jinfar Liuenergy_progress
02/11/2021HVAC and service water heating system controls Jinfar Liuenergy_progress
02/11/2021HVAC and service water heating equipment Jinfar Liuenergy_progress
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing4
08/26/2026Q00222338-P3Request digital key ↗
08/26/2026Q00222338-I1Request digital key ↗
08/15/2026Q00222338-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00284299-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026Q01092266-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
02/03/2022421917251Open ↗
06/15/2021421917251Open ↗
02/12/2021421917251Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
08/17/2021421917251Open ↗
02/03/2020421917251Open ↗
02/03/2020421917251Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/03/2021421917251Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
02/07/2022421917251Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/07/2022421917251Open ↗
▸BISZONING DIAGRAM1
01/21/2020421917251Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00222338-P2Open ↗
09/01/2026Q00222338-P2Open ↗
09/01/2026Q00222338-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026Q00284299-I1Open ↗
08/26/2026Q00222338-P3Open ↗
08/26/2026Q00222338-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/03/2020421917251Open ↗
01/30/2020421917251Open ↗
01/30/2020421917251Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00222338-P2Open ↗
09/01/2026Q00222338-P2Open ↗
08/24/2026Q00222338-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
02/07/2022421917251Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/03/2020421917251Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/03/2020421917251Open ↗
▸BISSTREET TREE CHECKLIST1
09/25/2019421917251Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00222338-P2Open ↗
08/26/2026Q00222338-P3Open ↗
08/26/2026Q00222338-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/30/2020421917251Open ↗
▸Energy Compliance8
▸BISFENESTRATION AIR LEAKAGE1
02/07/2022421917251Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/07/2022421917251Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/07/2022421917251Open ↗
▸BISFENESTRATION AREAS1
02/07/2022421917251Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/07/2022421917251Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/07/2022421917251Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/07/2022421917251Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/03/2020421917251Open ↗
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT4
08/13/2026Q00222338-P3Open ↗
08/13/2026Q00222338-I1Open ↗
08/13/2026Q00222338-P2Open ↗
Showing 3 of 4 on file for this type
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
02/07/2022421917251Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/07/2022421917251Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
02/07/2022421917251Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/07/2022421917251Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/07/2022421917251Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/07/2022421917251Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/30/2020421917251Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
02/07/2022421917251Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00222338-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE2
02/03/2022421917251Open ↗
09/25/2019421917251Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
02/04/2022421917251Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/25/2019421917251Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/07/2022421917251Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION7
02/23/2022421917251Open ↗
02/10/2022421917251Open ↗
06/29/2021421917251Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM1
08/17/2021421917251Open ↗
▸BISEFILING COVER SHEET1
09/25/2019421917251Open ↗
▸Other Documents4
▸BISCONSTRUCTION CLASS ON PLANS1
02/10/2022421917251Open ↗
▸BISSMOKE CONTROL SYSTEMS1
02/07/2022421917251Open ↗
▸BISWOOD - INSTALLATION OF METAL-PLATE-CONNECTED TRUSSES1
02/07/2022421917251Open ↗
▸BISPLOT DIAGRAM1
09/25/2019421917251Open ↗