← Back
Multi-story retail building (2+)
142-26 ROOSEVELT AVENUE
QUEENS · Flushing-Willets Point · BIN 4113629
💬 Discuss this project
1950Year Built
2Stories
K2Building Class
R6Zoning
5,480 sfGross Floor Area
4Units
7 Open Violations 5 unresolved · 2 paperwork only ▸
Multi-story retail building (2+) · Owner of record: GUANGHUINY LLC · 7,020 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 111p · 2 filings · 20 docs
Cellar9p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GWANGGAETOU DEVELOPMENT103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/16/2015$459K—— → —$84/sf building
02/19/2015$6.8M—Private party → ROOSEVELT AVENUE PLAZA LLC$1,241/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC410/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RED SUN RENOVATION INCGeneral Contractor707/08/2026
MES CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619310/23/2023
Building Lifecycle
All (33)Filed (4)Permit Issued (4)Violation (6)Inspection (5)Special Inspection (14)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2024
Inspection — Fail-Final Sign Permit Inspection
Fail
View inspection ↗
12/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
10/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
10/23/2023
Filed — Alteration
CAP & REMOVE OIL TANK & OIL BOILER AT CEL. PLUMBING WORK FOR COMMERCIAL KITCHEN OF EATING & DRINKING ESTABLISHMENT ON CEL & 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00856797-P1
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
10/20/2023
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
10/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
10/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/25/2023
Permit issued — Construction Fence
Q00877478-I1-FN
05/22/2023
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH.
Q00877478-I1
05/03/2023
Permit issued — Mechanical Systems
Q00852715-I1-GC-CX
04/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/12/2023
Permit issued — Plumbing
Q00856797-I1-PL
04/07/2023
Filed — Alteration
CAP & REMOVE OIL TANK & OIL BOILER AT CEL. PLUMBING WORK FOR COMMERCIAL KITCHEN OF EATING & DRINKING ESTABLISHMENT ON CEL & 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00856797-I1
04/03/2023
Permit issued — General Construction
Q00852715-I1-GC-CX
03/30/2023
Filed — Alteration
INTERIOR RENOVATION AND MECHANICAL WORK FOR COMMERCIAL KITCHEN OF EATING & DRINKING ESTABLISHMENT ON CEL & 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY..
Q00852715-I1
03/30/2023
Special inspection requirement — Mechanical Systems
YAN GAO
03/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
03/30/2023
Special inspection requirement — Final
YAN GAO
03/30/2023
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
03/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
YAN GAO
03/30/2023
Special inspection requirement — Interior lighting power
YAN GAO
03/30/2023
Special inspection requirement — Ventilation and air distribution system
YAN GAO
03/30/2023
Special inspection requirement — Duct leakage testing, insulation and design
YAN GAO
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2008
Violation issued (ECB, open)
Construction
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedRED SUN RENOVATION INC05/25/2023
DOB NOWMechanical SystemsPermit IssuedRED SUN RENOVATION INC05/03/2023
DOB NOWPlumbingPermit IssuedMES CONSTRUCTION CORP04/12/2023
DOB NOWGeneral ConstructionPermit IssuedRED SUN RENOVATION INC04/03/2023
1 project · most recent 03/30/2023
Ventilation Systems
FiledStatusContractorScope
03/30/2023Permit IssuedRED SUN RENOVATION INCVentilation Systems
1 project · most recent 10/23/2023
Water/Sanitary
FiledStatusContractorScope
10/23/2023Permit IssuedMES CONSTRUCTION CORPWater/Sanitary
1 project · most recent 06/12/2023
General Wiring
FiledStatusContractorScope
06/12/2023Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/13/2024Fail-Final Sign Permit InspectionFailView ↗
12/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/24/2023Fire-Resistant Penetrations and JointsYAN GAOspecial
10/24/2023Energy Code Compliance InspectionsYAN GAOprogress
10/24/2023HVAC-R and service water piping design and insulationYAN GAOenergy_progress
10/20/2023Fire-Resistant Penetrations and JointsYAN GAOspecial
10/20/2023Energy Code Compliance InspectionsYAN GAOprogress
10/20/2023HVAC-R and service water piping design and insulationYAN GAOenergy_progress
03/30/2023Mechanical SystemsYAN GAOspecial
03/30/2023Fire-Resistant Penetrations and JointsYAN GAOspecial
03/30/2023FinalYAN GAOprogress
03/30/2023Energy Code Compliance InspectionsYAN GAOprogress
03/30/2023Fire-Resistance Rated ConstructionYAN GAOprogress
03/30/2023Interior lighting powerYAN GAOenergy_progress
03/30/2023Ventilation and air distribution systemYAN GAOenergy_progress
03/30/2023Duct leakage testing, insulation and designYAN GAOenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026Q00852715-I1Request digital key ↗
08/24/2026Q00877478-I1Request digital key ↗
08/24/2026Q00856797-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026Q00856797-I1Open ↗
09/02/2026Q00856797-I1Open ↗
08/27/2026Q00856797-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026Q00852715-I1Open ↗
08/24/2026Q00877478-I1Open ↗
08/24/2026Q00856797-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q00856797-I1Open ↗
08/27/2026Q00856797-P1Open ↗
08/23/2026Q00852715-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q00852715-I1Open ↗
08/24/2026Q00856797-I1Open ↗
08/24/2026Q00856797-P1Open ↗