← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
142-29 37 AVENUE
QUEENS · Flushing-Willets Point · BIN 4531749
💬 Discuss this project
2004Year Built
6Stories
RMBuilding Class
R6Zoning
7,130 sfGross Floor Area
10Units
Rent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 3,500 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
PlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 6Under Construction1p · 1 filing · 5 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 111p · 1 filing · 5 docs
Cellar1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BESTWAY CONSULTING807/08/2026
GEMSTONE HOLDING1904/09/2026
37TH AVENUE DEVELOPEMENT CORP.1203/22/2026
METAL STONE CONSTRUCTION103/22/2026
37 AVE DEVELOPMENT303/22/2026
LEPARC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XC ENGINEERING PC611/10/2025
SU ARCHITECT, P.C.204/23/2025
HUAN DESIGN INC.203/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G DESIGN DRAFTING1203/21/2026
IDA DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor304/09/2026
ZHENG LIElectrical103/21/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
KALE CONSTRUCTION INCGeneral Contractor108/08/2026
L&U HVAC CORPGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing106/28/2026
LG ELITE PLUMBING INCPlumbing107/08/2026
KJK ELECTRIC INCElectrical103/21/2026
PHD SERVICES CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
XC ENGINEERING PC9405611/10/2025
SU ARCHITECT PC6857204/23/2025
HUAN DESIGN INC7669203/07/2025
Building Lifecycle
All (132)Filed (10)Permit Issued (8)Signed Off (4)Violation (50)Inspection (10)Objection (20)Special Inspection (30)
08/07/2026
Permit issued — Mechanical Systems
Q01214065-I1-MS
06/15/2026
Permit issued — Plumbing
Q01213874-I1-PL
04/17/2026
Signed off — Alteration
NEW MECHANICAL SYSTEM FOR EXISTING TENANT SPACE: NEW OUTDOOR CONDENSER UNITS ON ROOFTOP, NEW AIR HANDLER UNITS WITHIN TENANT SPACE, NEW DUCTWORK AND DIFFUSERS PER NEW DENTAL OFFICE LAYOU, NEW EXHAUST FAN AND DUCTWORK, NEW FRESH AIR INTAKE SYSTEM.
Q01210288-I1
04/06/2026
Signed off — Alteration
Q01210286-I1
01/16/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2025
Filed — Alteration
Q01210286-P2
10/22/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/01/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/08/2025
Permit issued — Mechanical Systems
Q01210288-I1-MS
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2025
Permit issued — Plumbing
Q01210290-I1-EW-SP
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection resolved — Addressed
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
06/25/2025
Special inspection requirement — Sprinkler Systems
XIU CHEN
06/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
06/20/2025
Filed — Alteration
Q01210286-P1
06/20/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES PER DENTAL OFFICE LAYOUT AND REQUIREMENT. INSTALL NEW DENTAL PLUMBING PER DENTAL CONSULTANT'S DIRECTIONS. MODIFY EXISTING SPRINKLER SYSTEM PER DENTAL OFFICE LAYOUT. NO CHANGE TO OCCUPANCY, GROUP AND USE.
Q01210290-P1
06/13/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
06/06/2025
Special inspection requirement — Maintenance information
XIU CHEN
06/06/2025
Special inspection requirement — Interior lighting power
XIU CHEN
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
06/06/2025
Special inspection requirement — Lighting controls
XIU CHEN
05/19/2025
Signed off — Alteration
Herewith filing plumbing work to remove existing gas boiler.
Q01190019-I1
05/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2025
Signed off — Alteration
Herewith filing plumbing work to remove existing gas boiler.
Q01190019-S1
05/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/13/2025
Violation issued (ECB, open)
Zoning
05/12/2025
Objection raised — Cost
05/12/2025
Objection raised — Plumbing
05/12/2025
Objection raised — Mechanical
05/12/2025
Objection raised — Scope
05/12/2025
Objection raised — Zoning
05/12/2025
Objection raised — Mechanical
05/09/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
05/06/2025
Permit issued — General Construction
Q01210286-I1-GC
05/06/2025
Permit issued — Plumbing
Q01210290-I1-PL
04/24/2025
Objection raised — Cost
04/24/2025
Objection raised — Mechanical
04/24/2025
Objection raised — Fire_Protection
04/24/2025
Objection raised — Mechanical
04/23/2025
Filed — Alteration
TO INSTALL NEW SPLIT SYSTEM HEAT PUMP AND AIR HANDLER AT APT#6R ON006 FL WITH MECHANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NOCHANGE OF USE, EGRESS AND CERTIFICATE OF OCCUPANCY
Q01214065-I1
04/23/2025
Filed — Alteration
PLUMBING WORK FOR APT#6R ON 6TH FLOOR AS PER PLAN FILED HEREWITH.NO CHANGE OF USE, EGRESS AND CERTIFICATE OF OCCUPANCY.
Q01213874-I1
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
04/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
04/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
TONY ONYEAGORO
04/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
TONY ONYEAGORO
04/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
TONY ONYEAGORO
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKALE CONSTRUCTION INC08/07/2026
DOB NOWPlumbingPermit IssuedPHD SERVICES CORP06/15/2026
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN07/08/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD PLUMBIN07/01/2025
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN05/06/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.05/06/2025
DOB NOWMechanical SystemsSigned-offL&U HVAC CORP04/16/2025
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC03/18/2025
BISOTISSUEDKORMAN DESIGN & BUILD02/23/2006
BISOTISSUEDABLE CONSTRUCTION CO OF NY INC08/18/2005
BISOTISSUEDSUPER YUAN CONSTRUCTION09/21/2004
BISOTISSUEDSHINY CONSTRUCTION INC07/07/2004
BISEQISSUEDPROSPERITY DEVELOPMENT INC12/09/2002
BIS—ISSUEDPROSPERITY DEVELOPMENT INC.12/09/2002
BIS—ISSUEDPROSPERITY DEVELOPMENT INC.09/26/2002
BISEQISSUEDPROSPERITY DEVELOPMENT INC09/26/2002
BISSPISSUEDB.H. PLG AND HEATING CORP03/15/2002
BIS—ISSUEDPILOT GREAT CONTR.CORP02/21/2002
BISEQISSUEDPROSPERITY DEVELOPMENT INC01/04/2002
BISPLISSUEDB H PLG & HTG CO01/02/2002
BIS—ISSUEDPILOT GREAT CONTR.CORP08/17/2001
BISEQISSUEDPILOT GREAT CONTR.CORP08/17/2001
BIS—ISSUEDMETAL STONE CONSTRUCTION INC.06/19/2001
BISCCISSUEDMARIO AND NINO CONST CORP08/09/1994
BISOTISSUEDMICHAEL K. CONSTRUCTION INC08/03/1994
1 project · most recent 04/23/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/23/2025Signed-offKALE CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSZ-GL12NA 12,000 BTU · Fan Coil Indoor ×2
MSZ-GL24NA 24,000 BTU · Fan Coil Indoor ×1
MSZ-GS09NA 9,000 BTU · Fan Coil Indoor ×1
MXZ-3C24NAHZ4 24,000 BTU · Heat Pump Outdoor ×1
MXZ-3C30NAHZ4 30,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 06/20/2025
FiledStatusContractorScope
06/20/2025Signed-offAMERICAN STANDARD PLUMBIN28 heads
2 projects · most recent 06/20/2025
Water/Sanitary Gas
FiledStatusContractorScope
06/20/2025Permit IssuedAMERICAN STANDARD P&H CORWater/Sanitary
04/23/2025Permit IssuedPHD SERVICES CORPGas
2 projects · most recent 05/21/2025
General Wiring
FiledStatusContractorScope
05/21/2025CompleteKJK ELECTRIC INCGeneral Wiring
04/08/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/16/2026Pass-Final General Construction Non-Directive 14PassView ↗
10/01/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/25/2025Fire-Resistant Penetrations and JointsXIU CHENspecial
06/25/2025Sprinkler SystemsXIU CHENspecial
06/25/2025Tenant Protection Plan ComplianceXIU CHENspecial
06/06/2025Tenant Protection Plan ComplianceXIU CHENspecial
06/06/2025Maintenance informationXIU CHENenergy_progress
06/06/2025Interior lighting powerXIU CHENenergy_progress
06/06/2025Fire-Resistant Penetrations and JointsXIU CHENspecial
06/06/2025Lighting controlsXIU CHENenergy_progress
04/23/2025Energy Code Compliance InspectionsQIANG SUprogress
04/23/2025HVAC-R and service water piping design and insulationQIANG SUenergy_progress
04/23/2025Energy Code Compliance InspectionsQIANG SUprogress
04/23/2025Fire-Resistant Penetrations and JointsQIANG SUspecial
04/23/2025HVAC-R and service water heating system controlsTONY ONYEAGOROenergy_progress
04/23/2025HVAC-R and service water piping design and insulationTONY ONYEAGOROenergy_progress
04/23/2025HVAC-R and service water heating equipmentTONY ONYEAGOROenergy_progress
04/23/2025Fire-Resistant Penetrations and JointsQIANG SUspecial
04/22/2025Tenant Protection Plan ComplianceQIANG SUspecial
04/22/2025Mechanical SystemsQIANG SUspecial
04/22/2025Tenant Protection Plan ComplianceQIANG SUspecial
04/22/2025FinalTONY ONYEAGOROprogress
04/14/2025HVAC-R and service water heating equipmentXIU CHENenergy_progress
04/14/2025Heating SystemsXIU CHENspecial
04/14/2025Tenant Protection Plan ComplianceXIU CHENspecial
04/14/2025FinalJing Xieprogress
04/14/2025Energy Code Compliance InspectionsXIU CHENprogress
Latest 25 of 41.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026Q01190019-S1Request digital key ↗
08/20/2026Q01190019-I1Request digital key ↗
08/20/2026Q01210288-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
08/29/2019401950536Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q01210288-I1Open ↗
09/01/2026Q01210288-I1Open ↗
09/01/2026Q01210288-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026Q01190019-S1Open ↗
08/20/2026Q01190019-I1Open ↗
08/20/2026Q01210288-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q01210288-I1Open ↗
08/31/2026Q01210290-I1Open ↗
08/29/2026Q01213874-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/03/2019401950536Open ↗
09/03/2019401950536Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/06/2019401950536Open ↗
09/03/2019401950536Open ↗