← Back
One story - permanent living quarter
142-44 222 STREET
QUEENS · Laurelton · BIN 4280906
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R3XZoning
728 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 4,200 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof3p · 1 filing · 13 docs
Floor 21p · 1 filing · 13 docs
Floor 1
Cellar1p · 1 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HT ASSOCIATES211/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAOTIAN & ASSOCIATES INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACK VERRELLIElectrical103/21/2026
Building Lifecycle
All (62)Filed (2)Violation (14)Objection (16)Special Inspection (30)
02/27/2026
Objection resolved — Addressed
01/15/2026
Objection raised — Admin
01/06/2026
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Fire_Protection
12/08/2025
Objection raised — Energy
12/08/2025
Objection raised — Fire_Protection
11/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSED HORIZONTAL & VERTICAL EXTENSION; CONVERT EXISTING BUILDING TO 2-FAMILY DWELLING UNIT; OBTAIN NEW C OF O.
Q01218856-S1
11/10/2025
Special inspection requirement — Metering
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/10/2025
Special inspection requirement — Maintenance information
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
11/07/2025
Special inspection requirement — Sprinkler Systems
07/29/2025
Objection resolved — Addressed
07/03/2025
Objection raised — Cost
07/03/2025
Objection raised — Plumbing
07/03/2025
Objection raised — Admin
07/03/2025
Objection raised — Energy
06/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSED HORIZONTAL & VERTICAL EXTENSION; CONVERT EXISTING BUILDING TO 2-FAMILY DWELLING UNIT; OBTAIN NEW C OF O.
Q01218856-I1
05/16/2025
Special inspection requirement — Air barrier — testing
05/01/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/01/2025
Special inspection requirement — Energy Code Compliance Inspections
05/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
05/01/2025
Special inspection requirement — Interior lighting power
05/01/2025
Special inspection requirement — Fenestration air leakage
05/01/2025
Special inspection requirement — Structural Steel - Details
05/01/2025
Special inspection requirement — Maintenance information
05/01/2025
Special inspection requirement — Metering
05/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
05/01/2025
Special inspection requirement — Permanent certificate
05/01/2025
Special inspection requirement — Electric vehicle service equipment requirements
05/01/2025
Special inspection requirement — Air barrier - visual inspection
05/01/2025
Special inspection requirement — Insulation placement and R values
05/01/2025
Special inspection requirement — Fenestration areas
05/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/01/2025
Special inspection requirement — Structural Steel - Welding
05/01/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/01/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/01/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/15/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2006
Violation issued (ECB, closed)
Unknown
01/04/2006
Violation issued (ECB, closed)
Unknown
08/12/2005
Violation issued (ECB, closed)
Unknown
04/26/2005
Violation issued (ECB, closed)
Unknown
12/28/2004
Violation issued (ECB, closed)
Quality of Life
12/28/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/28/2004
Violation issued (ECB, closed)
Zoning
12/28/2004
Violation issued (ECB, closed)
Quality of Life
09/13/1999
Violation issued (ECB, closed)
Zoning
08/23/1999
Violation issued (ECB, closed)
Quality of Life
08/23/1999
Violation issued (ECB, closed)
Construction
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDSUNRUN INSTALLATION SVC07/12/2016
1 project · most recent 11/10/2025
FiledStatusContractorScope
11/10/2025——41 heads
1 project · most recent 11/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/10/2025——Gas, Storm, Water/Sanitary
1 project · most recent 11/10/2025
Steel Wood
FiledStatusContractorScope
11/10/2025——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
11/10/2025Metering—energy_progress
11/10/2025HVAC-R and service water piping design and insulation—energy_progress
11/10/2025Maintenance information—energy_progress
11/10/2025HVAC-R and service water heating equipment—energy_progress
11/10/2025Fire-Resistant Penetrations and Joints—special
11/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
11/10/2025Energy Code Compliance Inspections—progress
11/10/2025HVAC-R and service water heating system controls—energy_progress
11/07/2025Sprinkler Systems—special
05/16/2025Air barrier — testing —energy_progress
05/01/2025Subsurface Investigations (Borings/Test Pits)—special
05/01/2025Energy Code Compliance Inspections—progress
05/01/2025Fire-Resistance Rated Construction—progress
05/01/2025Interior lighting power—energy_progress
05/01/2025Fenestration air leakage—energy_progress
05/01/2025Structural Steel - Details—special
05/01/2025Maintenance information—energy_progress
05/01/2025Metering—energy_progress
05/01/2025Fenestration and door U-factor and product ratings—energy_progress
05/01/2025Permanent certificate—energy_progress
05/01/2025Electric vehicle service equipment requirements—energy_progress
05/01/2025Air barrier - visual inspection—energy_progress
05/01/2025Insulation placement and R values—energy_progress
05/01/2025Fenestration areas—energy_progress
05/01/2025Structural Stability – Alterations of existing buildings—special
Latest 25 of 35.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026Q01218856-S1Request digital key ↗
08/18/2026Q01218856-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
03/27/2017440324034Open ↗
07/11/2016440324034Open ↗
▸BISWORK PERMIT APPLICATION1
07/11/2016440324034Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01218856-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01218856-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01218856-I1Open ↗
08/13/2026Q01218856-S1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/11/2016440324034Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/11/2016440324034Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/11/2016440324034Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01218856-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
07/11/2016440324034Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01218856-I1Open ↗
08/13/2026Q01218856-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/11/2016440324034Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/11/2016440324034Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/11/2016440324034Open ↗
▸BISNYCECC ANALYSIS1
07/11/2016440324034Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/11/2016440324034Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/11/2016440324034Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01218856-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/11/2016440324034Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/11/2016440324034Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01218856-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01218856-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01218856-I1Open ↗