RoofUnder Construction6p · 7 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
Mechanical Systems
REPLACEMENT OF TWO (2) COOLING TOWERS ON 1st FLOOR ROOF.
On file for this project
10 documents · 1 drawing sheet
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Roof membrane replacement at the 2nd and 7th-floor terraces, facade repairs per plans.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 20Under Construction5p · 1 filing · 17 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
Plumbing
PLUMBING FOR THE INTERIOR RENOVATION OF AN EXISTING APARTMENT 20A ON THE 20TH FLOOR. PAA P1 FILED TO AMEND PLANS AND SCHEDULE B. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
On file for this project
17 documents · 4 drawing sheets
Floor 193p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
COMBINATION OF UNIT 19B AND 19C TO CREATE ONE UNIT.
On file for this project
6 documents · 1 drawing sheet
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 22p · 2 filings · 20 docs
Fire ProtectionMechanical
INSTALLATION OF NEW SMOKE PURGE SYSTEM INCLUDING REVERSIBLE FANS AND DUCTWORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Filing for sprinkler modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 15p · 4 filings · 20 docs
ArchitectureMechanical
HVAC MODIFICATIONS FOR EXISTING RETAIL STORES 2 AND 3 (CVS STORE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
34 documents · 1 drawing sheet
INSTALLATION OF NEW SMOKE PURGE SYSTEM INCLUDING REVERSIBLE FANS AND DUCTWORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Store #2: Mechanical work related to general construction application M00469489-I1. New split system as per plans. No change to egress, use or occupancy.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Mezzanine3p · 1 filing · 15 docs
ArchitectureGeneralOther
Store #2: General construction with minor structural work to existing CVS retail space as per plans. Mechanical and plumbing work to be filed separately. No change to use, egress or occupancy.
On file for this project
15 documents · 3 drawing sheets
Cellar6p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
REPLACEMENT (2) NEW LOW PRESSURE BOILERS AND (2) COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
43 documents · 2 drawing sheets
GENERAL CONSTRUCTION: INTERIOR RENOVATION OF EXISTING TENANT SPACE (APPROX. 2126 SF); REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. STRUCTURAL: NEW MECHANICAL MEZZANINE
On file for this project
29 documents · 1 drawing sheet
PLUMBING: ADDITIONS/MODIFICATIONS TO EXISTING PLUMBING SYSTEM. SPRINKLER: MODIFICATIONS TO EXISTING SPRINKLER SYSTEM.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.