← Back
Predominantly retail with other uses
140 DELANCEY STREET
MANHATTAN · Lower East Side · BIN 1004305
💬 Discuss this project
1912Year Built
3Stories
K4Building Class
C6-2AZoning
20,000 sfGross Floor Area
6Units
6 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: DELANCEY SUFFOLK ASSOCIATES · 12,520 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof5p · 3 filings · 12 docs
Floor 114p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COMJEM ASSOCIATES3007/08/2026
AR CONTRACTING GROUP1407/08/2026
AT&T703/22/2026
DELANCEY SUFFOLK ASSOCIATES2803/22/2026
AT&T WIRELESS SERVICE103/21/2026
DELANCY MEDIA ASSOCIATES, LLC503/21/2026
DELANCEY SUFFOLF ASSOCIATES303/21/2026
DELANCEY SUFFOLK ASSOC C O COMJE203/21/2026
DELANCY SUFFOLK ASSOCIS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM ENGINEERING PLLC111/21/2023
ARC-HI-TECT ASSOCIATE INC408/23/2023
ASHRAF CORP103/22/2023
BRIAN ILL DEVELOPMENT LLC210/26/2022
DEWBERRY ENGINEERS INC310/20/2020
NB&C103/19/2020
ALPHA HOME DESIGN LLC101/09/2020
NIEGO ASSOCIATES104/06/2018
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CARUSO CONTRACTING LLCGeneral Contractor607/08/2026
OVERLAND CONTRACTING INCGeneral Contractor603/21/2026
AR CONTRACTING GROUP INCGeneral Contractor407/08/2026
HUGHES ENVIRONMENTAL ENGIGeneral Contractor203/21/2026
IRONBO, INCGeneral Contractor107/08/2026
KMM TELECOMMUNICATIONSGeneral Contractor107/08/2026
SUPERIOR FIRE CONTROL INCGeneral Contractor107/08/2026
CJ HEATING & MECHANICAL CPlumbing107/08/2026
MAUCERI SIGNScaffold107/08/2026
IGOR KHERSONSKYElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
PETILLI, EUGENEElectrical103/21/2026
QUEREM IRON WORKS INCElectrical103/21/2026
ROOPCHAND SINGHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLM ENGINEERING PLLC6913111/21/2023
ARC-HI-TECH ASSOCIATES IN6963408/23/2023
JAY KAVI CORPORATION8500103/22/2023
BRIAN ILL DEVELOPMENT LLC1402110/26/2022
R MARSAC CONSULTING LLC329310/20/2020
Building Lifecycle
All (83)Filed (14)Permit Issued (15)Signed Off (6)Violation (9)Inspection (4)Objection (10)Special Inspection (25)
09/18/2025
Violation issued (ECB, open)
Construction
05/13/2025
Signed off — Alteration
INSTALL TEMP CONSTRUCTION FENCE
M07995845-I1
05/13/2025
Signed off — Alteration
RENOVATION OF EXISTING STOREFRONT
M07995842-I1
04/21/2025
Violation issued (FDNY_ORDER, closed)
04/21/2025
Violation issued (FDNY_ORDER, closed)
11/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/04/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/21/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/14/2024
Violation issued (ECB, open)
Construction
05/22/2024
Permit issued — Construction Fence
M07995845-I1-FN
05/22/2024
Permit issued — General Construction
M07995842-I1-GC
02/08/2024
Permit issued — Mechanical Systems
M00962021-I1-MS
11/21/2023
Filed — Alteration
Replacing existing 5 ton air handling unit with new on first floor connecting to existing condenser unit and ductwork at AT&T store as per plans filed herewith.
M00962021-I1
11/13/2023
Special inspection requirement — Mechanical Systems
Ronald Merhige
11/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
11/13/2023
Special inspection requirement — Final
Ronald Merhige
11/13/2023
Special inspection requirement — Maintenance information
Ronald Merhige
11/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ronald Merhige
11/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
11/13/2023
Special inspection requirement — Shutoff dampers
Ronald Merhige
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2023
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
08/23/2023
Filed — Alteration
Existing 1st-floor plumbing work (install 7 non-residential cooking ranges) with conjunction renovation work type M08043012 as per plan no change in use egress and occupancy.
M00811973-P2
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
08/22/2023
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
08/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/20/2023
Permit issued — General Construction
M08043012-I1-GC
05/26/2023
Permit issued — General Construction
M07995842-I1-GC
05/26/2023
Permit issued — Construction Fence
M07995845-I1-FN
05/12/2023
Filed — Alteration
Existing 1st-floor plumbing work (install 7 non-residential cooking ranges) with conjunction renovation work type M08043012 as per plan no change in use egress and occupancy.
M00811973-P1
05/10/2023
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
03/24/2023
Permit issued — Mechanical Systems
M08033925-I1-MS
03/22/2023
Filed — Alteration
INSTALL NEW KITCHEN EXHAUST SYSTEM, HOOD AND DUCTWORK FOR NEW RESTAURANT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M08033925-I1
01/24/2023
Permit issued — Plumbing
M00811973-I1-PL
01/13/2023
Filed — Alteration
Existing 1st-floor plumbing work (install 7 non-residential cooking ranges) with conjunction renovation work type M08043012 as per plan no change in use egress and occupancy.
M00811973-I1
01/07/2023
Violation issued (ECB, open)
Construction
12/30/2022
Permit issued — General Construction
M08043012-I1-GC
12/12/2022
Objection raised — Admin
12/12/2022
Objection resolved — Addressed
11/29/2022
Objection raised — Scope
11/29/2022
Objection resolved — Addressed
11/21/2022
Filed — Alteration
Existing 1st-floor store renovation to make deli grocery as per plan, plumbing job will file separately no change use egress and occupancy
M08043012-I1
11/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
11/20/2022
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
11/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
IGOR LISOVENKO
11/03/2022
Special inspection requirement — Duct leakage testing, insulation and design
AKM HOQUE
11/03/2022
Special inspection requirement — Mechanical Systems
Jay Kavi
11/03/2022
Special inspection requirement — Final
BRIAN MCCAFFREY
10/26/2022
Filed — Alteration
INSTALL TEMP CONSTRUCTION FENCE
M07995845-I1
10/26/2022
Filed — Alteration
RENOVATION OF EXISTING STOREFRONT
M07995842-I1
10/26/2022
Special inspection requirement — Fenestration air leakage
BRIAN ILL
10/26/2022
Special inspection requirement — Fenestration areas
BRIAN ILL
10/26/2022
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
10/26/2022
Special inspection requirement — Final
BRIAN ILL
10/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
10/26/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ILL
03/10/2021
Signed off — Alteration
AT&T - Replacement of existing telecommunication antennas and RRH units with installation of new RRH units on the roof. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.
M00360518-I1
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offCARUSO CONTRACTING LLC05/22/2024
DOB NOWGeneral ConstructionSigned-offCARUSO CONTRACTING LLC05/22/2024
DOB NOWMechanical SystemsPermit IssuedHUGHES ENVIRONMENTAL ENGI02/08/2024
DOB NOWGeneral ConstructionPermit IssuedAR CONTRACTING GROUP INC07/20/2023
DOB NOWGeneral ConstructionSigned-offCARUSO CONTRACTING LLC05/26/2023
DOB NOWConstruction FenceSigned-offCARUSO CONTRACTING LLC05/26/2023
DOB NOWMechanical SystemsPermit IssuedSUPERIOR FIRE CONTROL INC03/24/2023
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C01/24/2023
DOB NOWGeneral ConstructionPermit IssuedAR CONTRACTING GROUP INC12/30/2022
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC11/12/2020
DOB NOWAntennaSigned-offKMM TELECOMMUNICATIONS10/29/2020
DOB NOWAntennaPermit IssuedIRONBO04/01/2020
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC01/17/2020
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC07/23/2019
DOB NOWSignSigned-offMAUCERI SIGN CO., INC04/06/2018
BISOTISSUEDSIGN MASTER USA INC01/09/2020
BISOTISSUEDBECHTEL INFRASTRUCTURE AN05/09/2017
BISOTISSUEDBECHTEL INFRASTRUCTURE AN07/07/2016
BISOTISSUEDBECHTEL INFRASTRUCTURE AN09/03/2015
BISOTISSUEDT.J. SIGNS UNLIMITED INC03/04/2015
BIS—ISSUEDAMERICAN SIGN & ELECL CON03/03/2015
BISPLISSUEDL&J PLG & HTG CO OF NY IN12/18/2014
BISOTISSUEDSPECIAL GRAPHICS & MAINTE11/06/2014
BISMHISSUEDGOOD-WILL MECHANICAL CORP.07/17/2012
BISOTISSUEDLEVEROCK ENTERPRISES LLC06/11/2012
BISOTISSUEDLEVEROCK ENTERPRISES LLC05/16/2012
BISPLISSUEDMPC PLUMBING & HEATING INC05/08/2012
BISOTISSUEDSYNERGY CONSTRUCTION INC02/13/2012
BISEQISSUEDSYNERGY CONSTRUCTION INC02/13/2012
BISMHISSUEDHAAS INCORPORATED01/23/2012
BISOTISSUEDNORTH SHORE NEON SIGN LLC12/09/2011
BIS—ISSUEDNORTH SHORE NEON SIGN CO12/08/2011
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.11/22/2011
BISPLISSUEDAARON PLBG AND MECH SYST02/17/2009
BISOTISSUEDRC PAZUR CONSTRUCTION CO02/10/2009
BISMHISSUEDRC PAZUR CONSTRUCTION CO02/10/2009
BISEQRE-ISSUEDRIDGE CONSTRUCTION CORP12/17/2008
BISOTISSUEDRIDGE CONSTRUCTION CORP12/17/2008
BIS—ISSUEDNEW YORK SIGN CONTRACTOR09/15/2008
BISOTISSUEDCONTI COMMUNICATIONS, INC.11/03/2003
+ 10 more permits on file
2 projects · most recent 11/21/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/21/2023Permit IssuedHUGHES ENVIRONMENTAL ENGIVentilation Systems
Ventilation
Lennox Lennox Industries Model#BCE5E 1,785 CFM · Ahu ×1
03/22/2023Permit IssuedSUPERIOR FIRE CONTROL INCVentilation Systems
Ventilation
Captiveaire A1-G-10D 3,000 CFM · Kitchen Exhaust ×1
Dayton 7C109 9,600 CFM · Kitchen Exhaust ×1
1 project · most recent 08/23/2023
Gas
FiledStatusContractorScope
08/23/2023Permit IssuedJL PLUMBING, LLCGas
1 project · most recent 02/14/2021
General Wiring
FiledStatusContractorScope
02/14/2021CompleteFVC ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/04/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
11/13/2023Mechanical SystemsRonald Merhigespecial
11/13/2023Energy Code Compliance InspectionsRonald Merhigeprogress
11/13/2023FinalRonald Merhigeprogress
11/13/2023Maintenance informationRonald Merhigeenergy_progress
11/13/2023HVAC-R and service water heating system controlsRonald Merhigeenergy_progress
11/13/2023HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
11/13/2023Shutoff dampersRonald Merhigeenergy_progress
08/25/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
08/25/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
08/22/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
08/22/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
05/10/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
05/10/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
11/20/2022Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
11/20/2022Energy Code Compliance InspectionsIGOR LISOVENKOprogress
11/20/2022Fire-Resistance Rated ConstructionIGOR LISOVENKOprogress
11/03/2022Duct leakage testing, insulation and designAKM HOQUEenergy_progress
11/03/2022Mechanical SystemsJay Kavispecial
11/03/2022FinalBRIAN MCCAFFREYprogress
10/26/2022Fenestration air leakageBRIAN ILLenergy_progress
10/26/2022Fenestration areasBRIAN ILLenergy_progress
10/26/2022Energy Code Compliance InspectionsBRIAN ILLprogress
10/26/2022FinalBRIAN ILLprogress
10/26/2022Fire-Resistant Penetrations and JointsBRIAN ILLspecial
10/26/2022Fenestration and door U-factor and product ratingsBRIAN ILLenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Burger KingRestaurant / Food ServiceFloor 1
Project M07995842 Alteration · LOC Issued · 10/26/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 290 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
09/06/2026M00024237-I1Request digital key ↗
09/05/2026M00082268-I1Request digital key ↗
09/01/2026M07995845-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Antenna3
09/05/2026M00261860-I1Request digital key ↗
09/04/2026M00360518-P1Request digital key ↗
08/14/2026M00360518-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00284189-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION24
01/08/2020123795090Open ↗
02/14/2017123018616Open ↗
05/05/2016122720644Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION23
01/30/2020123795090Open ↗
01/09/2020123795090Open ↗
05/22/2017123018616Open ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications90
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
01/08/2020123795090Open ↗
10/03/2017123018616Open ↗
02/14/2017123018616Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/06/2026M00024237-I1Open ↗
09/05/2026M00284189-I1Open ↗
09/05/2026M00261860-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M00962021-I1Open ↗
09/01/2026M00962021-I1Open ↗
09/01/2026M00962021-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
01/08/2020123795090Open ↗
03/06/2015122279444Open ↗
03/06/2015122279453Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
01/19/2012120949787Open ↗
12/01/2011120902684Open ↗
11/28/2011120902675Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M00962021-I1Open ↗
09/01/2026M08043012-I1Open ↗
09/01/2026M08033925-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/08/2020123795090Open ↗
03/06/2015122279444Open ↗
03/06/2015122279453Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE5
04/13/2015122164736Open ↗
03/23/2015122164736Open ↗
07/31/2012120881046Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
03/19/2013120881046Open ↗
03/18/2013120881046Open ↗
11/02/2011120881046Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
02/02/2010110357220Open ↗
02/02/2010110357220Open ↗
01/28/2010110357220Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/02/2011120881046Open ↗
02/02/2010110357220Open ↗
01/28/2010110357220Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/03/2014122164736Open ↗
01/10/2014120881046Open ↗
01/06/2014120881046Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
05/15/2017123018616Open ↗
10/08/2015122413094Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
01/08/2020123795090Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00284189-I1Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/06/2026M00024237-I1Open ↗
09/05/2026M00261860-I1Open ↗
09/04/2026M00360518-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
01/19/2012120949787Open ↗
11/28/2011120902675Open ↗
11/02/2011120881046Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
02/14/2017123018616Open ↗
05/05/2016122720644Open ↗
07/13/2015122413094Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
08/12/2015122413094Open ↗
11/06/2014122164736Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
10/03/2017123018616Open ↗
02/14/2017123018616Open ↗
12/14/2016122720644Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
01/19/2012120949787Open ↗
11/02/2011120881046Open ↗
11/02/2011120881046Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
10/03/2017123018616Open ↗
12/14/2016122720644Open ↗
03/23/2016122413094Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/18/2020123795090Open ↗
▸Approvals, Objections & Sign-offs23
▸BISADMINISTRATIVE OBJECTIONS8
01/19/2012120949787Open ↗
12/01/2011120902684Open ↗
11/28/2011120902675Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
05/18/2020123795090Open ↗
10/03/2017123018616Open ↗
12/14/2016122720644Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
10/03/2017123018616Open ↗
12/14/2016122720644Open ↗
03/23/2016122413094Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER1
07/18/2012120881046Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT30
05/18/2020123795090Open ↗
01/08/2020123795090Open ↗
10/03/2017123018616Open ↗
Showing 3 of 30 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET18
01/08/2020123795090Open ↗
02/14/2017123018616Open ↗
05/05/2016122720644Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM1
10/03/2017123018616Open ↗
▸BISADDITIONAL INFORMATION1
05/15/2017123018616Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/07/2016122720644Open ↗
02/14/2012120949787Open ↗
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED1
02/27/2012120949787Open ↗