← Back
BuildNYC
Office only, 2-6 stories
142 EAST 62ND STREET
MANHATTAN · BIN 1041993
💬 Discuss this project
1910Year Built
5Stories
O2Building Class
R8BZoning
30,946 sfGross Floor Area
3Units
LL97 Covered0 Active Violations
Office only, 2-6 stories · Owner of record: Andrew W Mellon Foundation · 12,049 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 1 filing · 7 docs
CellarAndrew W. Mellon Foundation6p · 2 filings · 19 docs
Site & exteriorLight duty scaffold installation2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Andrew W. Mellon Foundation1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Altieriseborwieber209/25/2024
New Age106/06/2024
Navi Structural Engineering110/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eurocelt Expediting203/21/2026
J Callahan Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Universal SystemsScaffold303/21/2026
The Metro GroupGeneral Contractor107/08/2026
City/Suburban PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency254209/25/2024
New Age Engineering7746106/06/2024
Building Lifecycle
All (21)Filed (4)Permit Issued (3)Signed Off (3)Violation (3)Inspection (1)Special Inspection (7)
06/08/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00619838-I1
11/07/2024
Signed off — Alteration
This Alteration application is being filed for the replacement of boiler and hot water pump. There are no change in use, egress or occupancy.
M01014010-I1
10/22/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/08/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
09/25/2024
Filed — Alteration
This Alteration application is being filed for the replacement of boiler and hot water pump. There are no change in use, egress or occupancy.
M01014010-P1
09/25/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
07/26/2024
Signed off — Alteration
M00936609-I1
06/06/2024
Filed — Alteration
M00936609-I1
06/06/2024
Permit issued — Mechanical Systems
M00936609-I1-MS
05/13/2024
Permit issued — Boiler Equipment
M01014010-I1-BE
03/18/2024
Filed — Alteration
This Alteration application is being filed for the replacement of boiler and hot water pump. There are no change in use, egress or occupancy.
M01014010-I1
09/20/2023
Special inspection requirement — Chimneys and vents
Stephen Shishko
09/20/2023
Special inspection requirement — Mechanical Systems
Stephen Shishko
09/20/2023
Special inspection requirement — Final
Stephen Shishko
11/01/2021
Permit issued — Supported Scaffold
M00619838-I1-SF
10/27/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00619838-I1
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/12/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offThe Metro Group06/06/2024
DOB NOWBoiler EquipmentSigned-offCity/Suburban Plumbing05/13/2024
DOB NOWSupported ScaffoldSigned-offUniversal Systems11/01/2021
BISMHISSUEDMichael J Merritt04/03/1992
BIS—ISSUEDMicheal J Merritt04/02/1992
BISMHISSUEDMichael J Merritt11/20/1991
BISPLISSUEDGardner Mechanical Associates Inc Hoffman05/31/1991
BIS—ISSUEDMicheal J Merritt03/07/1991
2 projects · most recent 08/17/2023
General Wiring
FiledStatusContractorScope
08/17/2023CompletePatriot ElectricGeneral Wiring
07/21/2021CompletePatriot Electric—
1 project · most recent 10/27/2021
Scaffold
FiledStatusContractorScope
10/27/2021Signed-offUniversal SystemsScaffold
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/22/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/08/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/08/2024Heating SystemsMAURICIO ANDRADEspecial
09/25/2024Heating SystemsMAURICIO ANDRADEspecial
09/25/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/20/2023Chimneys and ventsStephen Shishkospecial
09/20/2023Mechanical SystemsStephen Shishkospecial
09/20/2023FinalStephen Shishkoprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Andrew W. Mellon FoundationOfficeCellar
Project M01014010 Alteration · LOC Issued · 03/18/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00619838-I1Request digital key ↗
08/27/2026M00936609-I1Request digital key ↗
08/26/2026M01014010-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026M00936609-I1Open ↗
08/26/2026M01014010-P1Open ↗
08/26/2026M01014010-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01014010-P1Open ↗
08/24/2026M01014010-I1Open ↗
08/23/2026M00936609-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M00936609-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M00936609-I1Open ↗
08/26/2026M01014010-P1Open ↗
08/26/2026M01014010-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/26/2026M01014010-P1Open ↗
08/26/2026M01014010-I1Open ↗
08/13/2026M00936609-I1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M01014010-P1Open ↗
08/13/2026M01014010-I1Open ↗