← Back
BuildNYC
Two family frame
142 FREMONT AVENUE
STATEN ISLAND · BIN 5051971
💬 Discuss this project
1940Year Built
2Stories
B2Building Class
R3XZoning
2,616 sfGross Floor Area
2Units
2 Active Violations ▸FDNY Report ↗
Two family frame · Owner of record: HLV International Consultants · 3,800 sf lot · 0.69 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic4p · 2 filings · 18 docs
Floor 24p · 2 filings · 18 docs
Floor 15p · 2 filings · 18 docs
Cellar9p · 2 filings · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Engineering Inspection (Pei) Consultants606/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor104/09/2026
Catman PlumbingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Paul Engineering Inspecti4672306/18/2026
Building Lifecycle
07/23/2026
Signed off — Alteration
RESOLVE ECB VIOLATIONS: 34585103K AND 34585104M; REMOVE ILLEGAL BEDROOM,3-PC BATHROOM AND KITCHEN ON ATTIC. RENOVATION OF EXISTING CELLAR, 1ST, 2NDFLOOR AND ATTIC WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS,FLOORING AND COSMETIC WORK; NO CHANGE IN US
S01361322-I1
07/23/2026
Signed off — Alteration
RESOLVE ECB VIOLATIONS: 34585103K AND 34585104M; REMOVE ILLEGAL BEDROOM,3-PC BATHROOM AND KITCHEN ON ATTIC. RENOVATION OF EXISTING CELLAR, 1ST, 2NDFLOOR AND ATTIC WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER AND DRYER ON 1ST AND
S01361324-I1
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hugues Paul
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Hugues Paul
06/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hugues Paul
27 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKale Construction03/18/2026
DOB NOWPlumbingSigned-offCatman Plumbing03/18/2026
1 project · most recent 06/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/18/2026Signed-offCatman PlumbingGas, Water/Sanitary
1 project · most recent 04/06/2026
General Wiring
FiledStatusContractorScope
04/06/2026CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/22/2026Fire-Resistant Penetrations and JointsHugues Paulspecial
06/22/2026Energy Code Compliance InspectionsHugues Paulprogress
06/22/2026Fire-Resistance Rated ConstructionHugues Paulprogress
06/18/2026Fire-Resistance Rated ConstructionHugues Paulprogress
06/18/2026Fire-Resistant Penetrations and JointsHugues Paulspecial
06/18/2026Energy Code Compliance InspectionsHugues Paulprogress
04/17/2026Fire-Resistant Penetrations and JointsHugues Paulspecial
04/17/2026Energy Code Compliance InspectionsHugues Paulprogress
04/17/2026Fire-Resistance Rated ConstructionHugues Paulprogress
18 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account