Two stories - detached, small or mid-size
142 HILLCREST STREET
STATEN ISLAND · BIN 5067594
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R3AZoning
1,840 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,000 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE704/02/2026
ETRECTE LLC112/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE403/21/2026
ARC DESIGN AND CONSULTING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CICCARELLI & ASSOCIATES *General Contractor406/28/2026
FICAZZOLA CONSULTING LLCGeneral Contractor107/08/2026
CARMINE'S MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738203/23/2026
JAMES A CLANCY9176112/01/2025
Building Lifecycle
All (57)Filed (8)Permit Issued (4)Signed Off (4)Violation (2)Inspection (9)Special Inspection (30)
07/21/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION TO EXISTING ONE-FAMILY, TWO-STORY RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. NO NEW C/O.
S01231160-S2
07/21/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION TO EXISTING ONE-FAMILY, TWO-STORY RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. NO NEW C/O.
S01231160-I1
05/12/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF 8'-0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION
S01254261-I1
04/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/02/2026
Filed — Alteration
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION TO EXISTING ONE-FAMILY, TWO-STORY RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. NO NEW C/O.
S01231160-P3
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
04/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2026
Filed — Alteration
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION TO EXISTING ONE-FAMILY, TWO-STORY RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. NO NEW C/O.
S01231160-P2
03/23/2026
Filed — Alteration
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION TO EXISTING ONE-FAMILY, TWO-STORY RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. NO NEW C/O.
S01231160-P1
03/23/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/23/2026
Special inspection requirement — Interior lighting power
anthony santoro
03/23/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
03/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
03/23/2026
Special inspection requirement — Fenestration areas
anthony santoro
03/23/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
03/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
03/18/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
03/18/2026
Special inspection requirement — Air barrier - visual inspection
anthony santoro
03/18/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
03/18/2026
Special inspection requirement — Interior lighting power
anthony santoro
03/18/2026
Special inspection requirement — Fenestration areas
anthony santoro
03/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/17/2026
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01325397-I1
03/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/03/2025
Permit issued — Solar
S01325397-I1-SL
12/01/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01325397-I1
11/26/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
11/26/2025
Special inspection requirement — Final
James Clancy
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
11/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
11/20/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/11/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF 8'-0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION
S01254261-P1
09/10/2025
Permit issued — Plumbing
S01231160-S2-PL
08/18/2025
Permit issued — General Construction
S01231160-I1-GC
08/18/2025
Permit issued — Construction Fence
S01254261-I1-FN
07/23/2025
Filed — Alteration
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION TO EXISTING ONE-FAMILY, TWO-STORY RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. NO NEW C/O.
S01231160-S2
07/21/2025
Filed — Alteration
APPLICATION IS FILED FOR THE PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION TO EXISTING ONE-FAMILY, TWO-STORY RESIDENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. NO NEW C/O.
S01231160-I1
07/21/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF 8'-0' HIGH TEMPORARY CONSTRUCTION FENCE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION
S01254261-I1
02/18/1993
Violation issued (ECB, closed)
Construction
11/25/1992
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFICAZZOLA CONSULTING12/03/2025
DOB NOWPlumbingSigned-offCARMINE'S MECHANICAL INC09/10/2025
DOB NOWGeneral ConstructionSigned-offCICCARELLI & ASSOCIATES *08/18/2025
DOB NOWConstruction FenceSigned-offCICCARELLI & ASSOCIATES *08/18/2025
1 project · most recent 04/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/02/2026Signed-offCARMINE'S MECHANICAL INCGas, Water/Sanitary
2 projects · most recent 12/10/2025
General Wiring
FiledStatusContractorScope
12/10/2025Permit IssuedSURE ELEC'L CONTR'G CORP.General Wiring
11/21/2025CompleteAMBER ELECTL CONTNG INC—
1 project · most recent 09/11/2025
Fence
FiledStatusContractorScope
09/11/2025Signed-offCICCARELLI & ASSOCIATES *Fence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
04/06/2026Energy Code Compliance Inspectionsanthony santoroprogress
04/06/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/06/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/06/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/02/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
04/02/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
04/02/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
04/02/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/23/2026Fenestration air leakageanthony santoroenergy_progress
03/23/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
03/23/2026Fire-Resistance Rated Constructionanthony santoroprogress
03/23/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/23/2026Interior lighting poweranthony santoroenergy_progress
03/23/2026Air barrier - visual inspectionanthony santoroenergy_progress
03/23/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
03/23/2026Fenestration areasanthony santoroenergy_progress
03/23/2026Insulation placement and R valuesanthony santoroenergy_progress
03/18/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
03/18/2026Fenestration air leakageanthony santoroenergy_progress
03/18/2026Air barrier - visual inspectionanthony santoroenergy_progress
03/18/2026Insulation placement and R valuesanthony santoroenergy_progress
03/18/2026Interior lighting poweranthony santoroenergy_progress
03/18/2026Fenestration areasanthony santoroenergy_progress
03/18/2026Fire-Resistance Rated Constructionanthony santoroprogress
03/18/2026Energy Code Compliance Inspectionsanthony santoroprogress
Latest 25 of 31.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/18/2026S01254261-I1Request digital key ↗
08/18/2026S01254261-P1Request digital key ↗
08/17/2026S01325397-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
09/26/2026S01231160-I1Open ↗
09/26/2026S01231160-I1Open ↗
09/13/2026S01231160-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026S01254261-I1Open ↗
08/17/2026S01325397-I1Open ↗
08/17/2026S01231160-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/26/2026S01231160-I1Open ↗
09/13/2026S01231160-P2Open ↗
08/24/2026S01325397-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026S01325397-I1Open ↗
08/17/2026S01231160-P1Open ↗
08/17/2026S01231160-P3Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01325397-I1Open ↗