← Back
Single or multiple dwelling with stores or offices
142 NORTH 5 STREET
BROOKLYN · BIN 3335719
💬 Discuss this project
1910Year Built
4Stories
S9Building Class
M1-2/R6BZoning
6,000 sfGross Floor Area
9Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: METROPOLITAN AVENUE ASSOCIATES INC. · 1,875 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
Architecture
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METROPOLITAN AVENUE ASSOCIATES INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LCW ENGINEERING, P.C.409/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHRISTOPHER STABILEElectrical103/21/2026
STABILE CHRISTOPHERElectrical103/21/2026
H-BUILDER INCGeneral Contractor107/08/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LCW ENGINEERING, PC1103209/06/2022
Building Lifecycle
All (22)Filed (4)Permit Issued (2)Signed Off (2)Violation (2)Inspection (4)Special Inspection (8)
09/28/2022
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE.
B00755041-I1
09/26/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/23/2022
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE.
B00755041-S1
09/20/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2022
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE.
B00755041-P2
09/06/2022
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE.
B00755041-P1
09/06/2022
Special inspection requirement — Lighting controls
luis wong
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
09/06/2022
Special inspection requirement — Energy Code Compliance Inspections
luis wong
09/06/2022
Special inspection requirement — Interior lighting power
luis wong
08/16/2022
Special inspection requirement — Energy Code Compliance Inspections
luis wong
08/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
luis wong
08/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
08/16/2022
Special inspection requirement — Energy Code Compliance Inspections
luis wong
06/24/2022
Permit issued — Plumbing
B00755041-S1-PL
06/23/2022
Permit issued — General Construction
B00755041-I1-GC
06/20/2022
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE.
B00755041-S1
06/10/2022
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE.
B00755041-I1
10/02/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/02/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG06/24/2022
DOB NOWGeneral ConstructionSigned-offH-BUILDER INC06/23/2022
BISPLISSUEDBAN PLBG & HTG02/20/2001
BISOTISSUEDANJAC ENTERPRISES, INC12/01/2000
BISEQISSUEDANJAC ENTERPRISES, INC12/01/2000
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/26/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/20/2022Fail-Final General Construction Non-Directive 14FailView ↗
09/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/06/2022Lighting controlsluis wongenergy_progress
09/06/2022Fire-Resistant Penetrations and Jointsluis wongspecial
09/06/2022Energy Code Compliance Inspectionsluis wongprogress
09/06/2022Interior lighting powerluis wongenergy_progress
08/16/2022Energy Code Compliance Inspectionsluis wongprogress
08/16/2022HVAC-R and service water piping design and insulationluis wongenergy_progress
08/16/2022Fire-Resistant Penetrations and Jointsluis wongspecial
08/16/2022Energy Code Compliance Inspectionsluis wongprogress
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026B00755041-P2Request digital key ↗
08/29/2026B00755041-P1Request digital key ↗
08/29/2026B00755041-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
05/27/2014320865471Open ↗
05/27/2014320865480Open ↗
07/09/2013320865480Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
07/08/2013320865480Open ↗
07/08/2013320865471Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026B00755041-P1Open ↗
08/26/2026B00755041-I1Open ↗
08/26/2026B00755041-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026B00755041-P2Open ↗
08/29/2026B00755041-P1Open ↗
08/29/2026B00755041-S1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/09/2013320865480Open ↗
07/08/2013320865471Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/09/2013320865480Open ↗
07/08/2013320865471Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/09/2013320865480Open ↗
07/08/2013320865471Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00755041-P1Open ↗
08/26/2026B00755041-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWHPD-1: Anti-Harassment Area Checklist4
08/29/2026B00755041-P2Open ↗
08/29/2026B00755041-P1Open ↗
08/29/2026B00755041-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00755041-P1Open ↗
08/29/2026B00755041-S1Open ↗
08/29/2026B00755041-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/09/2013320865480Open ↗
07/08/2013320865471Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/29/2026B00755041-S1Open ↗
08/29/2026B00755041-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/08/2013320865480Open ↗
07/08/2013320865471Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/09/2013320865480Open ↗
07/08/2013320865471Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
07/01/2013320865471Open ↗
06/28/2013320865480Open ↗