← Back
Single or multiple dwelling with stores or offices
142 NORTH 5 STREET
BROOKLYN · BIN 3335720
💬 Discuss this project
1910Year Built
4Stories
S9Building Class
M1-2/R6BZoning
6,000 sfGross Floor Area
9Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: METROPOLITAN AVENUE ASSOCIATES INC. · 1,875 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof1p · 1 filing · 5 docs
Floor 12p · 1 filing · 14 docs
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
R E M RESIDENTIAL704/09/2026
OWNER OF 142 NORTH 5 ST B303/22/2026
TO THE OWNER OF 142 NORTH103/22/2026
OWNER OF 217 BEDFORD AVE103/22/2026
DOOLEY ENTERPRISES LI103/22/2026
METROPOLITAN AVE ASSOC503/21/2026
METROPOLITAN ASSOCIATES103/21/2026
142 NORTH 5TH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC208/20/2025
TAN ENGINEERING PC412/11/2023
DOUGLAS P. GONZALEZ105/05/2023
NDNY ARCHITECTURE + DESIGN PLLC211/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS703/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AERIAL DESIGN BUILD SVCSGeneral Contractor807/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor204/09/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.1291412/11/2023
AK CONSULTING SERVICES, I6198205/05/2023
KATZ ENGINEERING238205/05/2023
Building Lifecycle
All (90)Filed (9)Permit Issued (7)Signed Off (7)Violation (25)Inspection (5)Objection (18)Special Inspection (19)
03/24/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01270899-I1
03/24/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01270899-S1
08/22/2025
Permit issued — Supported Scaffold
B01270899-S1-SF
08/20/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01270899-S1
08/18/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01270899-I1
08/18/2025
Permit issued — Sidewalk Shed
B01270899-I1-SH
05/14/2025
Violation issued (FDNY_NOV, closed)
03/19/2024
Signed off — Alteration
B00816459-I1
03/19/2024
Signed off — Alteration
NEW PLUMBING FIXTURES AND SPRINKLER HEADS INSTALLATION INCLUDING PIPING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY,
B08048350-I1
03/07/2024
Signed off — Alteration
B08035157-I1
03/07/2024
Signed off — Alteration
DEMO WORK OF RESTAURANT RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00756825-I1
01/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2023
Signed off — Alteration
MECHANICAL UNITS INSTALLATION AND ASSOSIATED DUCTS AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B08047906-I1
12/11/2023
Filed — Alteration
NEW PLUMBING FIXTURES AND SPRINKLER HEADS INSTALLATION INCLUDING PIPING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY,
B08048350-P2
12/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
12/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
12/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
12/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
12/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
11/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/02/2023
Filed — Alteration
NEW PLUMBING FIXTURES AND SPRINKLER HEADS INSTALLATION INCLUDING PIPING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY,
B08048350-P1
07/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
07/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
07/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
07/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
07/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
07/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2023
Permit issued — Structural
B00816459-I1-ST
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/05/2023
Filed — Alteration
B00816459-I1
05/05/2023
Permit issued — Plumbing
B08048350-I1-PL
05/05/2023
Permit issued — Mechanical Systems
B08047906-I1-MS
05/05/2023
Permit issued — General Construction
B08035157-I1-GC
02/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
YURI KATZ
01/31/2023
Objection raised — Other
01/31/2023
Objection resolved — Addressed
01/21/2023
Objection raised — Fire_Protection
01/21/2023
Objection resolved — Addressed
01/21/2023
Objection raised — Fire_Protection
01/21/2023
Objection resolved — Addressed
01/21/2023
Objection raised — Zoning
01/21/2023
Objection resolved — Addressed
01/21/2023
Objection raised — Admin
01/21/2023
Objection resolved — Addressed
01/21/2023
Objection raised — Scope
01/21/2023
Objection resolved — Addressed
01/21/2023
Objection raised — Mechanical
01/21/2023
Objection resolved — Addressed
01/21/2023
Objection raised — Inspections
01/21/2023
Objection resolved — Addressed
01/21/2023
Objection raised — Fire_Protection
01/21/2023
Objection resolved — Addressed
01/20/2023
Filed — Alteration
NEW PLUMBING FIXTURES AND SPRINKLER HEADS INSTALLATION INCLUDING PIPING MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY,
B08048350-I1
01/18/2023
Filed — Alteration
MECHANICAL UNITS INSTALLATION AND ASSOSIATED DUCTS AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B08047906-I1
11/21/2022
Filed — Alteration
B08035157-I1
11/04/2022
Special inspection requirement — Interior lighting power
MARY CHANDRAHASAN
11/04/2022
Special inspection requirement — Fenestration areas
MARY CHANDRAHASAN
11/04/2022
Special inspection requirement — Lighting controls
MARY CHANDRAHASAN
11/04/2022
Special inspection requirement — Energy Code Compliance Inspections
MARY CHANDRAHASAN
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY08/22/2025
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY08/18/2025
DOB NOWStructuralSigned-offAERIAL DESIGN BUILD SVCS06/27/2023
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP05/05/2023
DOB NOWMechanical SystemsSigned-offAERIAL DESIGN BUILD SVCS05/05/2023
DOB NOWGeneral ConstructionSigned-offAERIAL DESIGN BUILD SVCS05/05/2023
DOB NOWGeneral ConstructionSigned-offAERIAL DESIGN BUILD SVCS06/28/2022
BISOTISSUEDTHREE STAR CONSTRUCTION C06/15/2010
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM IN03/08/2007
BISPLISSUEDPETER PLUMBING ASSOC. INC.12/29/2006
BISOTISSUEDEUROSTRUCT INC01/10/2006
BISOTISSUEDEUROSTRUCT INC02/14/2003
BISPLISSUEDA.M.N. CORPORATION10/02/2002
BISEQISSUEDANJAC ENTERPRISES, INC12/13/2001
BISPLISSUEDWTC PLBG & HEATING CORP07/31/2001
BISOTISSUEDEUROSTRUCT INC07/18/2001
BISPLISSUEDBAN PLUMBING & HEATING02/26/2001
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT01/22/2001
BISOTISSUEDANJAC ENTERPRISES, INC12/22/2000
BISEQISSUEDUNITED HOSTING CO05/11/1999
BISEQISSUEDG.P WAVE LIGHTING INC04/29/1999
2 projects · most recent 08/12/2025
FiledStatusContractorScope
08/12/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
01/23/2024CompleteATTRACTIVE LIGHTING ELECL1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/01/2023HVAC-R and service water heating system controlsRoger Tanenergy_progress
12/01/2023HVAC-R and service water piping design and insulationRoger Tanenergy_progress
12/01/2023HVAC-R and service water heating equipmentRoger Tanenergy_progress
12/01/2023Energy Code Compliance InspectionsRoger Tanprogress
12/01/2023Fire-Resistant Penetrations and JointsRoger Tanspecial
07/27/2023Fire-Resistant Penetrations and JointsRoger Tanspecial
07/27/2023Energy Code Compliance InspectionsRoger Tanprogress
07/27/2023HVAC-R and service water heating equipmentRoger Tanenergy_progress
07/27/2023HVAC-R and service water heating system controlsRoger Tanenergy_progress
07/27/2023HVAC-R and service water piping design and insulationRoger Tanenergy_progress
02/02/2023Tenant Protection Plan ComplianceYURI KATZspecial
11/04/2022Interior lighting powerMARY CHANDRAHASANenergy_progress
11/04/2022Fenestration areasMARY CHANDRAHASANenergy_progress
11/04/2022Lighting controlsMARY CHANDRAHASANenergy_progress
11/04/2022Energy Code Compliance InspectionsMARY CHANDRAHASANprogress
11/04/2022FinalMARY CHANDRAHASANprogress
11/04/2022Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
11/04/2022Air barrier - visual inspectionMARY CHANDRAHASANenergy_progress
06/13/2022FinalMARY CHANDRAHASANprogress
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026B00756825-I1Request digital key ↗
08/28/2026B08035157-I1Request digital key ↗
08/27/2026B00816459-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
06/16/2010310087937Open ↗
06/16/2010310087937Open ↗
12/17/2007310049079Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/29/2026B00756825-I1Open ↗
08/13/2026B08035157-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/16/2008310087937Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00756825-I1Open ↗
08/31/2026B08048350-P1Open ↗
08/31/2026B08048350-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026B00756825-I1Open ↗
08/27/2026B00816459-I1Open ↗
08/26/2026B08048350-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/16/2008310087937Open ↗
06/16/2008310087937Open ↗
01/08/2008310049079Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B08048350-P1Open ↗
08/27/2026B08035157-I1Open ↗
08/27/2026B08035157-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/30/2008310087937Open ↗
12/05/2007310049079Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/30/2008310087937Open ↗
12/05/2007310049079Open ↗
▸BISPC FULL REPORT1
12/05/2007310049079Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/08/2008310049079Open ↗
12/05/2007310049079Open ↗
▸BISEQUIPMENT USE PERMITS1
01/08/2008310049079Open ↗
▸Safety & Tenant Protection11
▸DOB NOWHPD-1: Anti-Harassment Area Checklist9
08/29/2026B00756825-I1Open ↗
08/13/2026B01270899-S1Open ↗
08/13/2026B08047906-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWCertificate of No Harassment2
08/29/2026B00756825-I1Open ↗
08/13/2026B08035157-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026B00756825-I1Open ↗
08/26/2026B08048350-P2Open ↗
08/26/2026B08048350-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026B00816459-I1Open ↗
08/13/2026B08047906-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/16/2008310087937Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
06/16/2008310087937Open ↗
12/05/2007310049079Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/08/2008310049079Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/17/2007310049079Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/16/2008310087937Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00816459-I1Open ↗