← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
142N6
142 NORTH 6 STREET · Name © OpenStreetMap contributors · Williamsburg · BIN 3402958
💬 Discuss this project
2011Year Built
5Stories
RMBuilding Class
M1-2/R6AZoning
84,460 sfGross Floor Area
77Units
LL97 CoveredRent Stabilized8 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 20,000 sf lot · 4.22 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 3 docs
Bulkhead2p · 1 filing · 3 docs
Floor 12p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A & I CONSTRUCTION SERVIC203/22/2026
OWNER OF 142 N 6 ST103/22/2026
SCORTIA & DIANA ASSOC.103/22/2026
SPAN BUILDERS303/22/2026
TO THE OWNER OF 146 N 6 S203/22/2026
ZENGO GROUP INC203/22/2026
NORTHSIDE TOWER REALTY703/22/2026
NORTHSIDE TOWER6803/21/2026
NOBED 6403/21/2026
142N6 ASSOCIATES1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC CONSULTING ENGINEERS107/20/2022
STREET CONSULTING ENGINEERING, P. .205/28/2021
ARCHITECTURE BY DOMANI103/04/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JD DESIGN ASSOCIATES INC403/21/2026
PAR PLUMBING GROUP203/21/2026
JRK CREATIVE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor303/21/2026
STEINER BUILDING NYC LLCGeneral Contractor203/21/2026
AXCEL ELECTRIC CO., INC.Electrical103/22/2026
FIRST STAR CONSTRUCTION *General Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083107/20/2022
DELTA TESTING LABS687103/04/2020
Building Lifecycle
All (81)Filed (4)Permit Issued (4)Signed Off (3)Violation (60)Inspection (3)Special Inspection (7)
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/12/2022
Signed off — Alteration
FILING THIS APPLICATION TO INSTALL ELECTRICAL HAVC WALL MOUNT UNIT ON 1ST FL RETAIL STORE AND OBTAIN EQUIPMENT USE PERMIT,NO CHANGE TO USE,EGRESS AND OCCUPANCY.
B00735380-I1
08/04/2022
Permit issued — Mechanical Systems
B00735380-I1-MS
07/20/2022
Filed — Alteration
FILING THIS APPLICATION TO INSTALL ELECTRICAL HAVC WALL MOUNT UNIT ON 1ST FL RETAIL STORE AND OBTAIN EQUIPMENT USE PERMIT,NO CHANGE TO USE,EGRESS AND OCCUPANCY.
B00735380-I1
05/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAN PEREZ
05/11/2022
Special inspection requirement — Energy Code Compliance Inspections
JAN PEREZ
05/11/2022
Special inspection requirement — Maintenance information
JAN PEREZ
05/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
JAN PEREZ
05/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JAN PEREZ
05/10/2022
Special inspection requirement — Final
JAN PEREZ
05/10/2022
Special inspection requirement — Mechanical Systems
JAN PEREZ
02/17/2022
Signed off — Alteration
B00519251-I1
02/10/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/04/2021
Signed off — Alteration
B00519246-I1
09/30/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2021
Permit issued — General Construction
B00519246-I1-GC
07/06/2021
Permit issued — Plumbing
B00519251-I1-PL
05/28/2021
Filed — Alteration
B00519251-I1
05/28/2021
Filed — Alteration
B00519246-I1
04/19/2021
Violation issued (HPD, closed)
A
04/19/2021
Violation issued (HPD, closed)
I
04/07/2021
Violation issued (ECB, closed)
Construction
08/25/2020
Permit issued — Mechanical Systems
B00311221-I1-MS
06/23/2020
Violation issued (FDNY_NOV, closed)
06/23/2020
Violation issued (FDNY_ORDER, closed)
03/04/2020
Filed — Alteration
B00311221-I1
08/26/2019
Violation issued (FDNY_NOV, closed)
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/07/2018
Violation issued (FDNY_NOV, closed)
02/12/2018
Violation issued (FDNY_NOV, closed)
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/25/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/19/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/02/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/02/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/02/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/02/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2011
Violation issued (ECB, closed)
Construction
11/07/2011
Violation issued (ECB, closed)
Construction
02/15/2011
Violation issued (ECB, closed)
Construction
02/14/2011
Violation issued (ECB, closed)
Unknown
02/11/2011
Violation issued (ECB, closed)
Construction
07/26/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2010
Violation issued (ECB, closed)
Construction
02/18/2010
Violation issued (ECB, closed)
Unknown
02/18/2010
Violation issued (ECB, closed)
Construction
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFIRST STAR CONSTRUCTION *08/04/2022
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC07/28/2021
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC07/06/2021
DOB NOWMechanical SystemsSigned-offSTEINER BUILDING NYC LLC08/25/2020
BIS—ISSUEDSTEINER BUILDING NYC LLC01/23/2023
BISPLISSUEDMAXWELL PLUMB MECH. CORP01/11/2023
BIS—ISSUEDSTEINER BUILDING NYC LLC02/28/2022
BIS—ISSUEDSTEINER BUILDING NYC LLC04/12/2021
BIS—ISSUEDSTEINER BUILDING NYC LLC07/26/2019
BIS—ISSUEDSTEINER BUILDING NYC LLC04/20/2018
BIS—ISSUEDSTEINER BUILDING NYC LLC01/20/2017
BIS—ISSUEDSTEINER BUILDING NYC LLC09/06/2016
BISPLISSUEDARCO PLBG AND HTG INC07/06/2012
BISOTISSUEDSURREY VENTURES INC07/02/2012
BISPLISSUEDC.R.U. MECHAN & HEAT INC06/22/2012
BISMHISSUEDHAPPY GARDEN CONSTR. CORP06/22/2012
BISSPISSUEDE.H.FIRE SUPPRESSION CO04/02/2012
BISSPISSUEDLLOYD G DRUMMOND PLBG&GEN03/23/2012
BISPLISSUEDROCK E SMALL PLBG&HTG INC12/20/2011
BISBLISSUEDROCK E SMALL PLBG&HTG INC12/20/2011
BISOTISSUEDZENCO GROUP INC11/09/2011
BIS—ISSUEDZENCO GROUP INC11/04/2011
BISSPISSUEDE.H.FIRE SUPPRESSION CO09/07/2011
BISPLISSUEDROCK E SMALL PLBG&HTG INC09/07/2011
BISBLISSUEDBEST MECHANICAL SVCS INC03/16/2011
BISEQISSUEDPERIMETER BRIDGE & SCAFFO03/10/2011
BISOTISSUEDNORTH TRUE CONSTRUCT MGMT01/04/2011
BISEQISSUEDNORTH TRUE CONSTRUCT MGMT01/04/2011
BISOTISSUEDNORTH TRUE CONSTRUCT MGMT01/04/2011
BISMHISSUEDNORTH TRUE CONSTRUCT MGMT01/04/2011
BISEQISSUEDNORTH TRUE CONSTRUCT MGMT01/04/2011
BISEQISSUEDNORTH TRUE CONSTRUCT MGMT01/04/2011
BISOTISSUEDNORTH TRUE CONSTRUCT MGMT01/04/2011
BISEQISSUEDPERIMETER BRIDGE & SCAFFO12/30/2010
BISOTISSUEDNORTH TRUE CONSTRUCT MGMT11/01/2010
BIS—ISSUEDNORTH TRUE CONSTRUCT MGMT10/21/2010
BISEQISSUEDNORTH TRUE CONSTRUCT MGMT10/21/2010
BISEQISSUEDMIA MASTER CONST INC10/21/2010
BISEQISSUEDNORTH TRUE CONSTRUCTION09/01/2010
BISPLISSUEDCOPPER PLUMBING & HEATING07/02/2009
+ 14 more permits on file
3 projects · most recent 04/03/2024
General Wiring
FiledStatusContractorScope
04/03/2024CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
01/30/2024CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
07/16/2021CompleteAXCEL ELECTRIC CO., INC.—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2021Pass-Final General Construction Non-Directive 14PassView ↗
08/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/20/2022Fire-Resistant Penetrations and JointsJAN PEREZspecial
05/11/2022Energy Code Compliance InspectionsJAN PEREZprogress
05/11/2022Maintenance informationJAN PEREZenergy_progress
05/11/2022HVAC-R and service water heating system controlsJAN PEREZenergy_progress
05/11/2022HVAC-R and service water piping design and insulationJAN PEREZenergy_progress
05/10/2022FinalJAN PEREZprogress
05/10/2022Mechanical SystemsJAN PEREZspecial
▾Documents — 167 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
09/01/2026B00519251-I1Request digital key ↗
09/01/2026B00519246-I1Request digital key ↗
08/29/2026B00735380-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00311221-I1Request digital key ↗
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION25
12/15/2023320492846Open ↗
12/15/2023320304915Open ↗
12/07/2023320415939Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION16
01/11/2023320914007Open ↗
04/06/2021320914007Open ↗
04/20/2018320914007Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/05/2025320914007Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING RESOLUTION DETERMINATION1
08/05/2014320914007Open ↗
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
09/10/2014320914007Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/11/2024320914007Open ↗
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
08/24/2013320486229Open ↗
07/19/2013320486229Open ↗
07/03/2012320492846Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/19/2012320586512Open ↗
07/03/2012320492846Open ↗
01/04/2011320255488Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
09/19/2012320586512Open ↗
07/03/2012320492846Open ↗
01/04/2011320255488Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026B00735380-I1Open ↗
08/26/2026B00735380-I1Open ↗
08/26/2026B00735380-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00519251-I1Open ↗
09/01/2026B00519246-I1Open ↗
08/29/2026B00735380-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00735380-I1Open ↗
08/26/2026B00735380-I1Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE6
08/07/2013320486229Open ↗
08/31/2012320486229Open ↗
08/02/2012320492846Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
07/28/2014320914007Open ↗
04/22/2013320486229Open ↗
07/03/2012320492846Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/24/2013320486229Open ↗
06/02/2012320486229Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/02/2012320304915Open ↗
▸BISEQUIPMENT USE PERMITS1
08/24/2013320486229Open ↗
▸Safety & Tenant Protection8
▸BISANTI-HARASSMENT CHECKLIST2
08/05/2014320914007Open ↗
07/03/2012320492846Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
05/27/2021320914007Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/29/2012320586512Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
06/22/2012320486229Open ↗
▸BISSTREET TREE CHECKLIST1
07/28/2014320914007Open ↗
▸DOB NOWHPD-1: Anti-Harassment Area Checklist1
08/13/2026B00735380-I1Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00311221-I1Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
05/12/2011320304915Open ↗
01/04/2011320255488Open ↗
10/26/2010320228785Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/02/2012320486229Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026B00735380-I1Open ↗
▸DOB NOWOER: Notice to Proceed1
08/13/2026B00735380-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/24/2013320486229Open ↗
07/19/2013320486229Open ↗
07/03/2012320492846Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00519246-I1Open ↗
08/13/2026B00519251-I1Open ↗
08/13/2026B00735380-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/24/2013320486229Open ↗
07/19/2013320486229Open ↗
▸Approvals, Objections & Sign-offs16
▸BISADMINISTRATIVE OBJECTIONS8
09/19/2012320586512Open ↗
07/03/2012320492846Open ↗
06/02/2012320486229Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/19/2021320914007Open ↗
03/15/2021320914007Open ↗
05/18/2020320914007Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/24/2013320486229Open ↗
07/19/2013320486229Open ↗
12/24/2009310155499Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/05/2014320914007Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
07/28/2014320914007Open ↗
08/24/2013320486229Open ↗
07/03/2012320492846Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/13/2023320914007Open ↗
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET10
07/28/2014320914007Open ↗
09/19/2012320586512Open ↗
07/03/2012320492846Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION8
01/04/2023320914007Open ↗
01/04/2023320914007Open ↗
12/02/2022320914007Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM1
04/06/2021320914007Open ↗
▸Other Documents4
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED3
08/27/2012320486229Open ↗
08/27/2012320492846Open ↗
06/18/2008310155499Open ↗
▸BISPLOT DIAGRAM1
09/10/2014320914007Open ↗