142 PIERREPONT STREET
BROOKLYN · BIN 3427346
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction72p · 6 filings · 20 docs
Floor 6Under Construction60p · 1 filing · 20 docs
Floor 5Under Construction60p · 2 filings · 20 docs
Floor 4Under Construction61p · 4 filings · 20 docs
Floor 3Under Construction206p · 4 filings · 20 docs
Floor 2Under Construction200p · 4 filings · 20 docs
Floor 1Under Construction206p · 4 filings · 20 docs
Mezzanine2p · 2 filings · 17 docs
CellarUnder Construction233p · 3 filings · 20 docs
1 job · most recent 08/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026Permit IssuedSPRING SCAFFOLDING LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin ACCU-6: RX5Q48TBVJUA, ACCU-7: RZR24TBVJUA (FCU-3-6, FCU-C-3) 48,000 BTU · Vrf Outdoor ×4
REYQ120AATJA (FCU-2-1, FCU-3-1, FCU-4-1, FCU-5-1, FCU-6-1, FCU-4-6) 96,000 BTU · Vrf Outdoor ×2
REYQ168AATJA (FCU-1-1, FCU-2-2, FCU-2-3, FCU-3-4, FCU-3-3, FCU-4-2, FCU-4-3, FCU-4-4, FCU-4.5, FCU-5-2, FCU-5-3, FCU-6-2, FCU-6-3) 166,000 BTU · Vrf Outdoor ×2
REYQ192AATJA (FCU-4-6, FCU-4-7, FCU-5-4) 180,000 BTU · Vrf Outdoor ×2
REYQ72AA5JA (FCU-C-1, FCU-C-2) 53,000 BTU · Vrf Outdoor ×2
RX09WMVJU9 (FCU-2-4) 9,000 BTU · Condensing Unit ×2
RXTQ48TBVJUA (FCU-3-4, FCU-3-5) 50,000 BTU · Vrf Outdoor ×3
RZQ24TBVJUA (FCU-R-1) 27,000 BTU · Condensing Unit ×3
RZR18TBVJUA (FCU-6-6_ 18,000 BTU · Condensing Unit ×2
ACCU-6: RRZR24TBVJUA (FCU-3-6), ACCU-7: RZR24TBJUA (FCU-C-3) 48,000 BTU · Vrf Outdoor ×2
BSF4Q54TVJ (FCU-4-6, FCU-4-7, FCU-5-4, FCU-5-5, FCU-6-4, FCU-6-5) 180,000 BTU · Condensing Unit ×1
BSQ36TVJ (FCU-2-1, FCU-3-1, FCU-4-1, FCU-5-1, FCU-6-1) 120,000 BTU · Condensing Unit ×1
REYQ168AATJA (FCU-C-4, FCU-1-1, FCU-2-2, FCU-2-3, FCU-2-4, FCU-3-2, FCU-3-3, FCU-4-2, FCU-4-3, FCU-4-4, FCU-4-5, FCU-5-2, FCU-5-3, FCU-6-2, FCU-6-3) 166,000 BTU · Vrf Outdoor ×1
REYQ72AATJA (FCU-C-1, FCU-C-2, FCU-C-4) 53,000 BTU · Vrf Outdoor ×1
RZR18TBVJUA (FCU-6-6) 18,000 BTU · Condensing Unit ×1
Aaon AAON RN00980H60E 102,000 BTU · Rooftop Unit ×2
RNA028CA8 6,100 CFM · Doas ×2
AAON RN009BA8 100,000 BTU · Rooftop Unit ×1
RNA025CA8 23 tons · Doas ×1
Ventilation
__Junk__ Ventilation 1 BTU
1 job · most recent 08/20/2026
Sprinkler System
FiledStatusContractorScope
08/20/2026Permit IssuedDEMAR PLUMBING CORPSprinkler System
1 job · most recent 08/20/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/20/2026Permit IssuedDEMAR MECHANICAL INCStorm, Water/Sanitary
5 jobs · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedINTER CONNECTION ELETRICGeneral Wiring
09/19/2025Permit IssuedDENALI ELECTRIC CORP—
09/16/2024Permit IssuedINTER CONNECTION ELETRICGeneral Wiring
01/25/2024Permit IssuedTOP SHELF ELECTRIC CORP—
09/08/2023CompleteNORTHEAST ELECTL CONTING—
1 job · most recent 08/20/2026
Steel Concrete
FiledStatusContractorScope
08/20/2026Permit IssuedSPRING SCAFFOLDING LLCSteel, Concrete
2 jobs · most recent 08/11/2026
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
08/11/2026Permit IssuedSPRING SCAFFOLDING LLCScaffold
08/06/2026Permit IssuedSPRING SCAFFOLDING LLCFence, Scaffold, Sidewalk Shed
Building Lifecycle
All (240)Filed (51)Permit Issued (53)Signed Off (13)Inspection (13)Objection (80)Special Inspection (30)
08/24/2026
Signed off — Alteration CO
Filing herewith for Structural work as per plans submitted.
B00974982-Z1
08/21/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Preliminary
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Final
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/20/2026
Filed — Alteration CO
Filing herewith for Structural work as per plans submitted.
B00974982-A3
08/19/2026
Filed — Alteration CO
Filing herewith for Structural work as per plans submitted.
B00974982-Z4
08/19/2026
Permit issued — Protection and Mechanical Methods
B00974982-Z4-PMM
08/18/2026
Signed off — Alteration CO
Filing herewith for Structural work as per plans submitted.
B00974982-S6
08/13/2026
Permit issued — Sidewalk Shed
B01150807-I1-SH
08/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01383840-P3
08/11/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/11/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY BETA HOIST PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE BETA HOIST WILL BE ON 1ST FLOOR AND ROOF.
B01150807-P7
08/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY BETA HOIST PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE BETA HOIST WILL BE ON 1ST FLOOR AND ROOF.
B01150807-P6
08/05/2026
Signed off — Alteration
EQUIPMENT USE: SINGLE 6436# CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
B01191668-I1
08/03/2026
Filed — Alteration CO
Filing herewith for Structural work as per plans submitted.
B00974982-A2
07/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/23/2026
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
07/23/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
07/23/2026
Special inspection requirement — Final
JOHN MCMONAGLE
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
07/13/2026
Objection resolved — Resolved
07/13/2026
Objection resolved — Resolved
06/25/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/18/2026
Permit issued — Protection and Mechanical Methods
B01150807-S9-PMM
06/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/27/2026
Permit issued — Sidewalk Shed
B01150807-I1-SH
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Scope
05/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01383840-P1
05/07/2026
Filed — Alteration CO
Filing herewith for Structural work as per plans submitted.
B00974982-A1
05/01/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY BETA HOIST PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE BETA HOIST WILL BE ON 1ST FLOOR AND ROOF.
B01150807-S4
05/01/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY BETA HOIST PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE BETA HOIST WILL BE ON 1ST FLOOR AND ROOF.
B01150807-S2
04/29/2026
Permit issued — Structural
B00974982-Z1-ST
04/28/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01383840-S1
04/28/2026
Permit issued — Supported Scaffold
B01383840-S1-SF
04/28/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2026
Permit issued — Supported Scaffold
B01383840-I1-SF
Latest 60 of 240 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAINT ANNS SCHOOL12309/15/2026
JONATHAN ROSE COMPANIES1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/30/2025$16.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO4603/21/2026
SPRING SCAFFOLDING LLC3203/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor4308/20/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor1607/08/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor204/10/2026
DEMAR MECHANICAL INCPlumbing207/08/2026
DEMAR PLUMBING CORPFire Protection207/08/2026
ETHOS PLUMBING CORPPlumbing107/08/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor107/08/2026
STANDARD CONCRETE AND EXCGeneral Contractor104/09/2026
INTER CONNECTION ELETRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8432008/20/2026
LANGAN ENG, ENV, SURVEYIN1265405/07/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC08/19/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC08/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC06/18/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC05/27/2026
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC04/29/2026
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC04/28/2026
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC04/10/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC03/02/2026
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC03/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/19/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/19/2026
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/19/2026
DOB NOWSprinklersPermit IssuedDEMAR MECHANICAL INC01/12/2026
DOB NOWPlumbingPermit IssuedDEMAR PLUMBING CORP01/12/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC12/15/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC11/21/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC11/17/2025
DOB NOWConstruction FencePermit IssuedSPRING SCAFFOLDING LLC11/14/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC11/14/2025
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC11/14/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC11/14/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC11/14/2025
DOB NOWProtection and Mechanical MethodsSigned-offTITAN INDUSTRIAL SVC CORP09/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offSTANDARD CONCRETE AND EXC05/07/2025
DOB NOWFoundationSigned-offJRM CONSTRUCTION MGMT LLC04/16/2025
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC04/16/2025
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC04/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC03/07/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC02/19/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/19/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC02/19/2025
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC02/05/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC01/24/2025
DOB NOWPlumbingPermit IssuedDEMAR MECHANICAL INC01/10/2025
DOB NOWSprinklersPermit IssuedDEMAR PLUMBING CORP01/10/2025
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC12/16/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC12/13/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC12/12/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedSPRING SCAFFOLDING LLC12/11/2024
+ 10 more permits on file
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2025Pass-Final PL - UndergroundPassView ↗
06/28/2025Pass-Final PL - UndergroundPassView ↗
11/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/21/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/21/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
08/21/2026Maintenance informationJOHN MCMONAGLEenergy_progress
08/21/2026Shutoff dampersJOHN MCMONAGLEenergy_progress
08/21/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/21/2026Duct leakage testing, insulation and designJOHN MCMONAGLEenergy_progress
08/21/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/21/2026Sprinkler SystemsJOHN MCMONAGLEspecial
08/21/2026Post-installed AnchorsJOHN MCMONAGLEspecial
08/21/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
08/21/2026Post-installed AnchorsJOHN MCMONAGLEspecial
08/21/2026Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
08/21/2026Mechanical SystemsJOHN MCMONAGLEspecial
08/21/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/21/2026Heating SystemsJOHN MCMONAGLEspecial
08/21/2026FinalJOHN MCMONAGLEprogress
08/21/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
08/21/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
08/21/2026PreliminaryJOHN MCMONAGLEprogress
08/11/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/11/2026Post-installed AnchorsJOHN MCMONAGLEspecial
08/11/2026Sprinkler SystemsJOHN MCMONAGLEspecial
08/11/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
07/23/2026PreliminaryJOHN MCMONAGLEprogress
07/23/2026Shutoff dampersJOHN MCMONAGLEenergy_progress
Latest 25 of 150.
▾Documents — 257 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch58
08/27/2026B00886633-I1Request digital key ↗
08/27/2026B00886633-S1Request digital key ↗
08/26/2026B00994422-I1Request digital key ↗
Showing 3 of 58 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/20/2026B01291383-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
01/14/2026322120478Open ↗
08/15/2025322120478Open ↗
03/26/2024322033161Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram5
08/15/2026B00974982-A1Open ↗
08/13/2026B00974982-A1Open ↗
08/13/2026B00974982-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00974982-P9Open ↗
08/13/2026B00974982-A1Open ↗
08/13/2026B00974982-I1Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/22/2026322120478Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/28/2024322033161Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/22/2026322120478Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00974982-I1Open ↗
▸Seals & Professional Certifications106
▸DOB NOWDPL-1: Design Professional Seal & Signature55
08/27/2026B00886633-I1Open ↗
08/27/2026B00886633-S1Open ↗
08/25/2026B00974982-S8Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/29/2026B01055639-I1Open ↗
09/27/2026B00974982-P2Open ↗
09/27/2026B00974982-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/29/2026B01055639-I1Open ↗
09/27/2026B00974982-P2Open ↗
09/27/2026B00974982-P2Open ↗
Showing 3 of 25 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026B00974982-A1Open ↗
08/13/2026B00974982-I1Open ↗
08/13/2026B00974982-P1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/30/2024340912114Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/18/2025340912114Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
08/27/2026B00886633-I1Open ↗
08/27/2026B00886633-S1Open ↗
08/24/2026B01055639-I1Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports1
▸DOB NOWTR5 Test Report1
08/17/2026B00974982-S6Open ↗
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/20/2026B00974982-Z4Open ↗
08/17/2026B00974982-A3Open ↗
08/17/2026B00974982-A2Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/02/2025322120478Open ↗
08/15/2025322120478Open ↗
03/28/2024322033161Open ↗
▸DOB NOWDEP Variance (V5) letter3
08/13/2026B00886633-I1Open ↗
08/13/2026B00886633-S1Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
09/10/2025322120478Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
10/02/2025322120478Open ↗
04/16/2024322033161Open ↗
▸BISEFILING COVER SHEET2
08/15/2025322120478Open ↗
03/26/2024322033161Open ↗
▸Other Documents29
▸DOB NOWPlot Diagram11
08/15/2026B00974982-A1Open ↗
08/13/2026B00974982-P6Open ↗
08/13/2026B00974982-S4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00974982-P1Open ↗
08/13/2026B00974982-P9Open ↗
08/13/2026B00974982-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026B00974982-P9Open ↗
08/17/2026B00974982-P1Open ↗
08/17/2026B00974982-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
09/10/2025322120478Open ↗
08/15/2025322120478Open ↗
08/15/2025322120478Open ↗
▸BISPLOT DIAGRAM1
08/15/2025322120478Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
12/06/2024340912114Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00974982-S4Open ↗