← Back
Single or multiple dwelling with stores or offices
142 ROGERS AVENUE
BROOKLYN · Crown Heights (North) · BIN 3032199
💬 Discuss this project
1931Year Built
4Stories
S9Building Class
R6BZoning
5,200 sfGross Floor Area
9Units
Rent Stabilized20 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 142 ROGER AVENUE CORP. · 1,900 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 20 docs
Floor 42p · 2 filings · 20 docs
Floor 33p · 3 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 15p · 2 filings · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
142 ROGERS AVENUE CORP1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING803/21/2026
KP CONSULTING ENGINEER403/21/2026
L&C ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TIMOTHY COLEMAN LICENSEDElectrical403/22/2026
A S M CONSTRUCTION OF NYGeneral Contractor403/21/2026
EXPERT CONSTRUCTION & RE*General Contractor303/21/2026
WHERE TO GET IT SERVICES,General Contractor303/21/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
MANLEY, JAMESElectrical103/21/2026
TWITTY, RONALDElectrical103/21/2026
GLAZIER LOCAL 1281Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRIME ZONE BUILDING CONSU9474506/26/2026
IP CONCRETE TESTING AND I6252103/19/2025
KCE CONSULTING ENGINEERIN3712210/23/2022
KMP DESIGN & ENGINEERING1630210/23/2022
Building Lifecycle
All (137)Filed (11)Permit Issued (7)Signed Off (4)Violation (40)Inspection (9)Objection (36)Special Inspection (30)
07/24/2026
Signed off — Alteration CO
CONVERT EXISTING MIX-USED BUILDING INTO THREE(3) STORES AT 1ST FLOOR WITH (4) DWELLING UNITS ABOVE ON AN EXISTING 4-STORY BUILDING WITH INTERIOR RENOVATION AT 1ST FLOOR, AND 3RD FLOOR ONLY. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01149651-I1
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
JICHEN SUN
07/21/2026
Special inspection requirement — Interior lighting power
JICHEN SUN
07/21/2026
Special inspection requirement — Lighting controls
JICHEN SUN
07/21/2026
Special inspection requirement — Lighting in dwelling units
JICHEN SUN
07/21/2026
Special inspection requirement — Maintenance information
JICHEN SUN
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
07/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
JICHEN SUN
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
06/26/2026
Filed — Alteration CO
CONVERT EXISTING MIX-USED BUILDING INTO THREE(3) STORES AT 1ST FLOOR WITH (4) DWELLING UNITS ABOVE ON AN EXISTING 4-STORY BUILDING WITH INTERIOR RENOVATION AT 1ST FLOOR, AND 3RD FLOOR ONLY. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01149651-P3
11/07/2025
Filed — Alteration CO
CONVERT EXISTING MIX-USED BUILDING INTO THREE(3) STORES AT 1ST FLOOR WITH (4) DWELLING UNITS ABOVE ON AN EXISTING 4-STORY BUILDING WITH INTERIOR RENOVATION AT 1ST FLOOR, AND 3RD FLOOR ONLY. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01149651-P2
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
11/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/06/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
11/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
JICHEN SUN
11/06/2025
Special inspection requirement — Lighting in dwelling units
JICHEN SUN
11/06/2025
Special inspection requirement — Lighting controls
JICHEN SUN
11/06/2025
Special inspection requirement — Maintenance information
JICHEN SUN
11/06/2025
Special inspection requirement — Interior lighting power
JICHEN SUN
10/21/2025
Signed off — Alteration
PLUMBING WORK OF EXISTING MIXED USE BUILDING IN CONJUNCTION WITH MINOR ALT-1 APPLICATION # B01149651-I1
B01197038-I1
09/29/2025
Filed — Alteration CO
CONVERT EXISTING MIX-USED BUILDING INTO THREE(3) STORES AT 1ST FLOOR WITH (4) DWELLING UNITS ABOVE ON AN EXISTING 4-STORY BUILDING WITH INTERIOR RENOVATION AT 1ST FLOOR, AND 3RD FLOOR ONLY. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01149651-P1
09/29/2025
Special inspection requirement — Maintenance information
JICHEN SUN
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
09/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
JICHEN SUN
09/29/2025
Special inspection requirement — Lighting in dwelling units
JICHEN SUN
09/29/2025
Special inspection requirement — Lighting controls
JICHEN SUN
09/29/2025
Special inspection requirement — Interior lighting power
JICHEN SUN
09/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2025
Permit issued — Plumbing
B01197038-I1-PL
04/02/2025
Permit issued — General Construction
B01149651-I1-GC
03/19/2025
Filed — Alteration
PLUMBING WORK OF EXISTING MIXED USE BUILDING IN CONJUNCTION WITH MINOR ALT-1 APPLICATION # B01149651-I1
B01197038-I1
03/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
03/04/2025
Objection resolved — Addressed
02/05/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/14/2025
Objection raised — Fire_Protection
01/14/2025
Objection raised — Fire_Protection
01/14/2025
Objection raised — Zoning
01/14/2025
Objection raised — Fire_Protection
01/14/2025
Objection raised — Fire_Protection
01/14/2025
Objection raised — Accessibility
01/14/2025
Objection raised — Other
01/14/2025
Objection raised — Structural
01/08/2025
Filed — Alteration CO
CONVERT EXISTING MIX-USED BUILDING INTO THREE(3) STORES AT 1ST FLOOR WITH (4) DWELLING UNITS ABOVE ON AN EXISTING 4-STORY BUILDING WITH INTERIOR RENOVATION AT 1ST FLOOR, AND 3RD FLOOR ONLY. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01149651-I1
12/02/2024
Signed off — Alteration
FILING FOR PLUMBING WORK-TYPE IN CONJUNCTION WITH JOB # 321986623
B00269808-I1
11/13/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/24/2024
Special inspection requirement — HVAC and service water heating system controls
KENNETH PHILOGENE
10/24/2024
Special inspection requirement — HVAC and service water heating equipment
KENNETH PHILOGENE
10/23/2024
Filed — Alteration
FILING FOR PLUMBING WORK-TYPE IN CONJUNCTION WITH JOB # 321986623
B00269808-P1
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP04/08/2025
DOB NOWGeneral ConstructionPermit IssuedWHERE TO GET IT SERVICES,04/02/2025
DOB NOWMechanical SystemsSigned-offA S M CONSTRUCTION OF NY06/14/2022
DOB NOWMechanical SystemsSigned-offA S M CONSTRUCTION OF NY05/05/2022
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC05/28/2021
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC05/17/2021
DOB NOWMechanical SystemsSigned-offEXPERT CONSTRUCTION & RE*05/06/2021
BISOTISSUEDEXPERT CONSTRUCTION & RE*11/08/2021
BISOTISSUEDEXPERT CONSTRUCTION & RE*09/04/2021
BISOTISSUEDEXPERT CONSTRUCTION & RE*03/01/2021
BISPLISSUEDC.H.P.H. CO12/18/2014
BISOTRE-ISSUEDJ.W.P CORP11/17/2014
1 project · most recent 07/12/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/12/2024——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MSY-GL12NA 12,000 BTU · Ahu ×2
MSY-G18NA 18,000 BTU · Ahu ×1
MUZ-GL12NA 24,000 BTU · Condensing Unit ×1
MUZ-GL18NA 18,000 BTU · Condensing Unit ×1
1 project · most recent 07/12/2024
Water/Sanitary
FiledStatusContractorScope
07/12/2024——Water/Sanitary
9 projects · most recent 04/21/2026
General Wiring Boiler Controls
FiledStatusContractorScope
04/21/2026CompleteTIMOTHY COLEMAN LICENSED10 meters, 1 new_meters
01/06/2026CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
01/06/2026CompleteTIMOTHY COLEMAN LICENSEDBoiler Controls
04/09/2025CompleteMAVEN ELECTRIC INCGeneral Wiring
04/03/2025CompleteMAVEN ELECTRIC INCGeneral Wiring
04/03/2025CompleteMAVEN ELECTRIC INCGeneral Wiring
03/21/2023CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
03/21/2023CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
01/31/2023CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/23/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
07/21/2026Tenant Protection Plan ComplianceJICHEN SUNspecial
07/21/2026Interior lighting powerJICHEN SUNenergy_progress
07/21/2026Lighting controlsJICHEN SUNenergy_progress
07/21/2026Lighting in dwelling unitsJICHEN SUNenergy_progress
07/21/2026Maintenance informationJICHEN SUNenergy_progress
07/21/2026Energy Code Compliance InspectionsJICHEN SUNprogress
07/21/2026Fire-Resistance Rated ConstructionJICHEN SUNprogress
07/21/2026Fire-Resistant Penetrations and JointsJICHEN SUNspecial
11/06/2025Fire-Resistant Penetrations and JointsJICHEN SUNspecial
11/06/2025Tenant Protection Plan Compliance—special
11/06/2025Energy Code Compliance InspectionsJICHEN SUNprogress
11/06/2025Fire-Resistance Rated ConstructionJICHEN SUNprogress
11/06/2025Lighting in dwelling unitsJICHEN SUNenergy_progress
11/06/2025Lighting controlsJICHEN SUNenergy_progress
11/06/2025Maintenance informationJICHEN SUNenergy_progress
11/06/2025Interior lighting powerJICHEN SUNenergy_progress
09/29/2025Maintenance informationJICHEN SUNenergy_progress
09/29/2025Fire-Resistant Penetrations and JointsJICHEN SUNspecial
09/29/2025Tenant Protection Plan Compliance—special
09/29/2025Energy Code Compliance InspectionsJICHEN SUNprogress
09/29/2025Fire-Resistance Rated ConstructionJICHEN SUNprogress
09/29/2025Lighting in dwelling unitsJICHEN SUNenergy_progress
09/29/2025Lighting controlsJICHEN SUNenergy_progress
09/29/2025Interior lighting powerJICHEN SUNenergy_progress
03/18/2025Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
Latest 25 of 45.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch7
08/22/2026B01197038-I1Request digital key ↗
08/20/2026B01149651-P1Request digital key ↗
08/20/2026B01149651-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00269808-P1Request digital key ↗
09/02/2026B00269808-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00276844-P1Request digital key ↗
09/02/2026B00276844-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION13
07/26/2024320832319Open ↗
07/25/2024320832319Open ↗
07/23/2024320832319Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION2
03/01/2021321986623Open ↗
12/30/2014320832319Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)4
08/20/2026B01149651-P3Open ↗
08/13/2026B01149651-P2Open ↗
08/13/2026B01149651-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01149651-I1Open ↗
08/13/2026B01149651-P2Open ↗
08/13/2026B01149651-P1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature20
08/29/2026B00276844-I1Open ↗
08/29/2026B00276844-I1Open ↗
08/29/2026B00276844-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026B00276844-P1Open ↗
09/02/2026B00276844-I1Open ↗
08/27/2026B00911690-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01197038-I1Open ↗
08/29/2026B00276844-I1Open ↗
08/29/2026B00276844-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
08/09/2013320832319Open ↗
09/17/2019321986623Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/11/2021340740540Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/09/2013320832319Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/11/2021340740540Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/09/2013320832319Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/21/2015320832319Open ↗
▸BISSCHEDULE B - PLUMBING1
08/09/2013320832319Open ↗
▸Safety & Tenant Protection12
▸DOB NOWTenant Protection Plan4
08/13/2026B00269808-I1Open ↗
08/13/2026B00269808-P1Open ↗
08/13/2026B00276844-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist4
08/20/2026B01149651-P3Open ↗
08/13/2026B01149651-P1Open ↗
08/13/2026B01149651-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
03/11/2021340740540Open ↗
09/20/2019321986623Open ↗
08/01/2024320832319Open ↗
▸BISST-1 Street Tree Checklist1
08/09/2013320832319Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026B00911690-S1Open ↗
08/14/2026B00911690-I1Open ↗
08/13/2026B00269808-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWACP5/20/21 or V52
09/02/2026B00276844-P1Open ↗
09/02/2026B00276844-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
08/09/2013320832319Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/31/2019321986623Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/04/2024321986623Open ↗
10/04/2024321986623Open ↗
05/01/2024320832319Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/12/2024320832319Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/17/2019321986623Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/11/2021340740540Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/09/2013320832319Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/30/2024321986623Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
10/04/2024321986623Open ↗
10/04/2024321986623Open ↗
09/30/2024321986623Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/07/2024321986623Open ↗
08/05/2024320832319Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/09/2013320832319Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
09/30/2024321986623Open ↗
08/02/2024320832319Open ↗
07/03/2024321986623Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/12/2024320832319Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
05/09/2024320832319Open ↗
05/02/2024320832319Open ↗
03/25/2015320832319Open ↗
▸BISEFILING COVER SHEET2
09/17/2019321986623Open ↗
08/09/2013320832319Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/11/2021340740540Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification4
08/20/2026B01149651-P3Open ↗
08/13/2026B01149651-P1Open ↗
08/13/2026B01149651-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
08/05/2024320832319Open ↗
04/29/2024320832319Open ↗
▸DOB NOWDHCR Document2
08/13/2026B00276844-I1Open ↗
08/13/2026B00269808-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01149651-I1Open ↗