Mansion type or town house
142 WEBSTER AVENUE
BROOKLYN · BIN 3127797
💬 Discuss this project
2024Year Built
3Stories
A7Building Class
R5Zoning
5,164 sfGross Floor Area
1Units
Mansion type or town house · 4,159 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Roof1p · 1 filing · 6 docs
Floor 335p · 1 filing · 20 docs
Floor 233p · 2 filings · 20 docs
Floor 132p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/06/2022$1.8M—Private party → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHER ARCHITECT712/24/2025
AVISHAY I. MAZOR, P.E.201/04/2024
EYAL LEVITT ARCHITECT PC106/07/2023
ARYEH SIEGEL ARCHITECT104/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERETZ BUILDERS ASSISTANCE.1803/21/2026
AVALON DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YC DEVELOPERS INCGeneral Contractor1407/08/2026
YATZIV CORPGeneral Contractor407/08/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
WATER WORKS PIPING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252912/24/2025
Building Lifecycle
All (117)Filed (12)Permit Issued (13)Signed Off (8)Inspection (13)Objection (41)Special Inspection (30)
01/14/2026
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Permanent certificate
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Air barrier — testing
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Metering
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Electric vehicle service equipment requirements
INDARDEO PARBHUNATH
01/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
12/24/2025
Filed — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2016 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB# B00866842.
B00866842-P2
12/24/2025
Special inspection requirement — Fenestration areas
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Electric vehicle service equipment requirements
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Interior lighting power
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Permanent certificate
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Metering
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Air barrier — testing
INDARDEO PARBHUNATH
12/24/2025
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
12/16/2025
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2016 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB# B00866842.
B00866842-S6
12/03/2025
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2016 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB# B00866842.
B00866842-S7
12/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/02/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/17/2025
Signed off — Alteration
Plumbing work for New building filed in conjunction with GC #B00866842-I1
B00933562-I1
10/17/2025
Signed off — Alteration
B00847923-I1
10/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/05/2025
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2016 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB# B00866842.
B00866842-S1
07/16/2025
Permit issued — Mechanical Systems
B00866842-S6-MS
06/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
06/20/2025
Permit issued — Curb Cut
B00866842-S7-CC
06/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/22/2025
Filed — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2016 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB# B00866842.
B00866842-P1
04/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
04/22/2025
Special inspection requirement — Air barrier - visual inspection
INDARDEO PARBHUNATH
04/22/2025
Special inspection requirement — Permanent certificate
INDARDEO PARBHUNATH
04/22/2025
Special inspection requirement — Fenestration air leakage
INDARDEO PARBHUNATH
03/31/2025
Filed — Alteration
Plumbing work for New building filed in conjunction with GC #B00866842-I1
B00933562-P1
12/23/2024
Permit issued — General Construction
B00866842-I1-GC
12/09/2024
Permit issued — Construction Fence
B00847923-I1-FN
12/04/2024
Permit issued — Sprinklers
B00866842-S1-EW-SP
09/26/2024
Inspection — Pass-Final House Connection
Pass
View inspection ↗
09/23/2024
Permit issued — Plumbing
B81774834-I1-PL
09/17/2024
Filed — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2016 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB# B00866842.
B00866842-S6
09/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/20/2024
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2016 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB# B00866842.
B00866842-S3
08/20/2024
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13D 2016 EDIT, AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB# B00866842.
B00866842-S4
08/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offYC DEVELOPERS INC07/16/2025
DOB NOWCurb CutSigned-offYC DEVELOPERS INC06/20/2025
DOB NOWGeneral ConstructionPermit IssuedYC DEVELOPERS INC12/23/2024
DOB NOWConstruction FenceSigned-offYC DEVELOPERS INC12/09/2024
DOB NOWSprinklersSigned-offJEM FIRE PREVENTION INC12/04/2024
DOB NOWPlumbingSigned-offSUPERIOR PIPING&MECH CORP09/23/2024
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP06/25/2024
DOB NOWFoundationSigned-offYC DEVELOPERS INC03/13/2024
DOB NOWStructuralSigned-offYC DEVELOPERS INC01/22/2024
DOB NOWGeneral ConstructionPermit IssuedYC DEVELOPERS INC01/22/2024
DOB NOWConstruction FenceSigned-offYC DEVELOPERS INC12/07/2023
DOB NOWFull DemolitionSigned-offYATZIV CORP06/09/2023
DOB NOWConstruction FenceSigned-offYATZIV CORP05/10/2023
1 project · most recent 12/24/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/24/2025Signed-offYC DEVELOPERS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTQ48TBVJUA 45,500 BTU · Vrf Outdoor ×3
RXTQ36TAVJU 34,200 BTU · Vrf Outdoor ×2
RX18WMVJU9 17,400 BTU · Condensing Unit ×1
Ventilation
Nutone QTXEN150 150 CFM · Exhaust Fan ×9
1 project · most recent 09/30/2025
General Wiring
FiledStatusContractorScope
09/30/2025CompleteCYM ELECTRICAL CONTRACTORGeneral Wiring
1 project · most recent 12/24/2025
FiledStatusContractorScope
12/24/2025Signed-offYC DEVELOPERS INC2 scope_items
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/30/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
06/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2024Pass-Final House ConnectionPassView ↗
09/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/06/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/06/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
01/14/2026Interior lighting powerINDARDEO PARBHUNATHenergy_progress
01/14/2026Fenestration air leakageINDARDEO PARBHUNATHenergy_progress
01/14/2026Permanent certificateINDARDEO PARBHUNATHenergy_progress
01/14/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
01/14/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
01/14/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
01/14/2026Air barrier — testing INDARDEO PARBHUNATHenergy_progress
01/14/2026MeteringINDARDEO PARBHUNATHenergy_progress
01/14/2026Fenestration areasINDARDEO PARBHUNATHenergy_progress
01/14/2026Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
01/14/2026Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
01/14/2026Electric vehicle service equipment requirementsINDARDEO PARBHUNATHenergy_progress
01/14/2026Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
12/24/2025Fenestration areasINDARDEO PARBHUNATHenergy_progress
12/24/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
12/24/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
12/24/2025Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
12/24/2025Electric vehicle service equipment requirementsINDARDEO PARBHUNATHenergy_progress
12/24/2025Air barrier - visual inspectionINDARDEO PARBHUNATHenergy_progress
12/24/2025Interior lighting powerINDARDEO PARBHUNATHenergy_progress
12/24/2025Permanent certificateINDARDEO PARBHUNATHenergy_progress
12/24/2025Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
12/24/2025MeteringINDARDEO PARBHUNATHenergy_progress
12/24/2025Fenestration and door U-factor and product ratingsINDARDEO PARBHUNATHenergy_progress
12/24/2025Air barrier — testing INDARDEO PARBHUNATHenergy_progress
Latest 25 of 57.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026B00847784-I1Request digital key ↗
08/27/2026B00847923-I1Request digital key ↗
08/26/2026B00933562-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
09/05/2024340909592Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00866842-P2Open ↗
08/13/2026B00866842-P1Open ↗
08/13/2026B00866842-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00866842-I1Open ↗
08/13/2026B00866842-P2Open ↗
08/13/2026B00866842-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00866842-I1Open ↗
▸Seals & Professional Certifications70
▸DOB NOWProgress Inspector Seal & Signature45
09/02/2026B00866842-I1Open ↗
09/02/2026B00866842-I1Open ↗
09/02/2026B00866842-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B00847784-I1Open ↗
08/27/2026B00847923-I1Open ↗
08/26/2026B00933562-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B00866842-I1Open ↗
09/01/2026B00866842-P1Open ↗
08/29/2026B00866842-S3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B00847784-I1Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00866842-P2Open ↗
08/13/2026B00866842-I1Open ↗
08/13/2026B00866842-P1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B00847784-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00847784-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00847784-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00847784-I1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/24/2026B00866842-P2Open ↗
08/24/2026B00866842-P1Open ↗
08/15/2026B00866842-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/05/2024340909592Open ↗
▸BISSTREET TREE CHECKLIST1
03/08/2024340909592Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00866842-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00866842-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00866842-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026B00847784-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00847784-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B00866842-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00866842-S3Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCURB CUT (CC) SIGNOFF1
12/14/2025340909592Open ↗
▸BISBPP - Forwarding Letter to DEP1
09/05/2024340909592Open ↗
▸Filing & Intake Forms1
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/05/2024340909592Open ↗
▸Other Documents15
▸DOB NOWProperty Ownership Certification4
08/27/2026B00847784-I1Open ↗
08/24/2026B00866842-P2Open ↗
08/24/2026B00866842-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00866842-P1Open ↗
08/13/2026B00866842-P2Open ↗
08/13/2026B00866842-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026B00866842-P2Open ↗
08/13/2026B00866842-P1Open ↗
08/13/2026B00866842-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/05/2024340909592Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00847784-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00847784-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00866842-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00847784-I1Open ↗