← Back
Elevator apt, fireproof with stores
142 WEST 21 STREET
MANHATTAN · BIN 1014759
💬 Discuss this project
1925Year Built
13Stories
D6Building Class
C6-3AZoning
79,336 sfGross Floor Area
24Units
3 Open Violations 0 unresolved · 3 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: LOVES LANE OWNER LLC · 8,188 sf lot · 9.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction109p · 4 filings · 20 docs
Floor 13Under Construction98p · 3 filings · 20 docs
Floor 12Under Construction99p · 3 filings · 20 docs
Floor 11Under Construction99p · 3 filings · 20 docs
Floor 10Under Construction99p · 3 filings · 20 docs
Floor 9Under Construction102p · 3 filings · 20 docs
Floor 8Under Construction100p · 3 filings · 20 docs
Floor 7Under Construction100p · 3 filings · 20 docs
Floor 6Under Construction171p · 3 filings · 20 docs
Floor 5Under Construction171p · 3 filings · 20 docs
Floor 4Under Construction171p · 3 filings · 20 docs
Floor 3Under Construction174p · 3 filings · 20 docs
Floor 2Under Construction177p · 4 filings · 20 docs
Floor 1Under Construction175p · 4 filings · 20 docs
CellarUnder Construction181p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP2309/02/2026
TITANIUM CONSTRUCTION SER807/08/2026
ALBA SERVICES INC1303/22/2026
LOVES LANE OWNER LLC103/22/2026
JADLAMM REALTY1003/22/2026
SADKAMM REALTY103/22/2026
ELBERT HOLDING CORP103/22/2026
ANN SERVICE603/21/2026
JADAMM REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1603/21/2026
Rigid Structural Design, LLC1103/21/2026
KD DESIGNS403/21/2026
EAST COAST EXPEDITING2203/21/2026
A1 EXPEDITING SERVICE603/21/2026
LOMBARDO PROFESSIONAL ENG DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TITANIUM CONSTRUCTION SERGeneral Contractor4309/07/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor2009/02/2026
KG SPRINKLER CORPFire Protection908/20/2026
JEM CONTRACTING CORPGeneral Contractor807/08/2026
HENRY MYERS P & H, INCPlumbing609/30/2026
ALBA SERVICES INCGeneral Contractor507/08/2026
PLUMBING NYC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS70791107/28/2026
PSI AGENCY INC.2541312/11/2025
LEO Y LEE ASSOCIATES2481204/22/2025
GTA ENGINEERING SERVICES2940104/11/2023
Building Lifecycle
All (246)Filed (48)Permit Issued (64)Signed Off (12)Violation (19)Inspection (13)Objection (60)Special Inspection (30)
09/29/2026
Permit issued — Plumbing
M00766992-S2-PL
09/03/2026
Permit issued — Foundation
M00766992-S4-FO
09/01/2026
Permit issued — Sidewalk Shed
M01026446-I1-SH
08/18/2026
Signed off — Alteration
M01068490-I1
08/18/2026
Signed off — Alteration
Installation of a temporary Overhead protection & enclosed system via Scaffold, Fence, and Wire Screen per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01026873-I1
08/11/2026
Signed off — Alteration
M01143312-I1
08/11/2026
Permit issued — Standpipe
M08023095-I1-EW-SD
08/11/2026
Permit issued — Plumbing
M00766992-S3-PL
08/11/2026
Permit issued — Sprinklers
M00766992-S7-EW-SP
08/11/2026
Permit issued — Sprinklers
M00766992-S7-EW-SD
08/10/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
12'-2 7/8" long curb cut including splays
M00766992-Z2
08/10/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
12'-2 7/8" long curb cut including splays
M00766992-S6
08/10/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
12'-2 7/8" long curb cut including splays
M00766992-Z1
08/10/2026
Signed off — Alteration
M01159831-I1
07/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
12'-2 7/8" long curb cut including splays
M00766992-P9
07/23/2026
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
07/23/2026
Special inspection requirement — Standpipe Systems
MOLLY GLENN
07/13/2026
Permit issued — General Construction
M00766992-I1-GC
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2026
Permit issued — Sidewalk Shed
M01026446-I1-SH
06/04/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/14/2026
Permit issued — Supported Scaffold
M01068490-I1-SF
05/14/2026
Permit issued — Protection and Mechanical Methods
M01026873-I1-PMM
04/29/2026
Permit issued — Construction Fence
M01223892-I1-FN
04/24/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/23/2026
Special inspection requirement — Electrical motors and elevators
MOLLY GLENN
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
04/23/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOLLY GLENN
04/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
04/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
04/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
04/23/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
04/23/2026
Special inspection requirement — Maintenance information
MOLLY GLENN
04/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
12'-2 7/8" long curb cut including splays
M00766992-P8
04/16/2026
Special inspection requirement — Maintenance information
MOLLY GLENN
04/16/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
04/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
MOLLY GLENN
04/16/2026
Special inspection requirement — Final
MOLLY GLENN
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
04/16/2026
Special inspection requirement — Lighting controls
MOLLY GLENN
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
04/16/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
MOLLY GLENN
04/16/2026
Special inspection requirement — Fireplaces
MOLLY GLENN
04/16/2026
Special inspection requirement — Lighting in dwelling units
MOLLY GLENN
04/16/2026
Special inspection requirement — Chimneys and vents
MOLLY GLENN
04/16/2026
Special inspection requirement — Electrical motors and elevators
MOLLY GLENN
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
MOLLY GLENN
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
04/16/2026
Special inspection requirement — Mechanical Systems
MOLLY GLENN
04/16/2026
Special inspection requirement — Exterior lighting power
MOLLY GLENN
04/16/2026
Special inspection requirement — Interior lighting power
MOLLY GLENN
04/16/2026
Special inspection requirement — Metering
MOLLY GLENN
04/16/2026
Special inspection requirement — Shutoff dampers
MOLLY GLENN
04/09/2026
Signed off — Alteration
EQUIPMENT USE: SINGLE #7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING BLDG ALT, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
M01113468-I1
04/07/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
12'-2 7/8" long curb cut including splays
M00766992-P7
03/27/2026
Permit issued — Supported Scaffold
M01159831-I1-SF
03/27/2026
Permit issued — Suspended Scaffold
M01162163-I1-SC
01/14/2026
Permit issued — Plumbing
M85274980-S2-PL
12/15/2025
Filed — Alteration
M01159831-P5
Latest 60 of 246 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHENRY MYERS P & H, INC09/29/2026
DOB NOWFoundationPermit IssuedTITANIUM CONSTRUCTION SER09/03/2026
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP09/01/2026
DOB NOWStandpipePermit IssuedKG SPRINKLER CORP08/11/2026
DOB NOWPlumbingPermit IssuedHENRY MYERS P & H, INC08/11/2026
DOB NOWSprinklersPermit IssuedKG SPRINKLER CORP08/11/2026
DOB NOWSprinklersPermit IssuedKG SPRINKLER CORP08/11/2026
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER07/13/2026
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP06/12/2026
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWConstruction FencePermit IssuedTITANIUM CONSTRUCTION SER04/29/2026
DOB NOWSupported ScaffoldSigned-offJEM CONTRACTING CORP03/27/2026
DOB NOWSuspended ScaffoldPermit IssuedJEM CONTRACTING CORP03/27/2026
DOB NOWPlumbingPermit IssuedPLUMBING WORKS NYC INC01/14/2026
DOB NOWSupported ScaffoldSigned-offJEM CONTRACTING CORP12/11/2025
DOB NOWSuspended ScaffoldPermit IssuedJEM CONTRACTING CORP12/11/2025
DOB NOWStructuralPermit IssuedTITANIUM CONSTRUCTION SER12/05/2025
DOB NOWFoundationSigned-offTITANIUM CONSTRUCTION SER09/10/2025
DOB NOWFoundationPermit IssuedTITANIUM CONSTRUCTION SER09/09/2025
DOB NOWSupport of ExcavationSigned-offTITANIUM CONSTRUCTION SER09/09/2025
DOB NOWPlumbingPermit IssuedHENRY MYERS P & H, INC07/21/2025
DOB NOWGeneral ConstructionPermit IssuedTITANIUM CONSTRUCTION SER07/08/2025
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC07/01/2025
DOB NOWStandpipePermit IssuedH M SPRINKLER INC07/01/2025
DOB NOWPlumbingPermit IssuedHENRY MYERS P & H, INC07/01/2025
DOB NOWStandpipePermit IssuedH M SPRINKLER INC07/01/2025
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP06/17/2025
DOB NOWMechanical SystemsPermit IssuedTITANIUM CONSTRUCTION SER06/03/2025
DOB NOWSupported ScaffoldSigned-offJEM CONTRACTING CORP06/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/15/2025
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP05/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/15/2025
DOB NOWConstruction FencePermit IssuedTITANIUM CONSTRUCTION SER05/12/2025
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER04/16/2025
DOB NOWSuspended ScaffoldPermit IssuedJEM CONTRACTING CORP04/11/2025
DOB NOWSuspended ScaffoldPermit IssuedJEM CONTRACTING CORP02/26/2025
DOB NOWSupported ScaffoldSigned-offJEM CONTRACTING CORP02/14/2025
DOB NOWProtection and Mechanical MethodsSigned-offALBA SERVICES INC11/27/2024
DOB NOWConstruction FenceSigned-offALBA SERVICES INC10/22/2024
+ 21 more permits on file
1 project · most recent 07/28/2026
Air Conditioning Systems Associated Ducts and Piping Generators Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2026Permit IssuedTITANIUM CONSTRUCTION SERAir Conditioning Systems, Associated Ducts and Piping, Generators, Heating and Air Conditioning Systems
Cooling
Mitsubishi Electric PKA-A24KA7 635 CFM · Ductwork ×1
Friedrich Friedrich Model #UET12B33A 12 BTU · Ptac ×2
Heat / Cool
Mitsubishi Electric PURY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×14
PURY-EP120TNU-A 120,000 BTU · Vrf Outdoor ×4
PUMY-P36NKMU 36,000 BTU · Vrf Outdoor ×2
PUMY-P48NKMU 48,000 BTU · Vrf Outdoor ×2
PURY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1
Trane Model #MXZ-SM36NAM2 36,000 BTU · Vrf Outdoor ×2
Rupp Air RARTU3-I.400-20-20T-DOAS 3,750 CFM · Rooftop Unit ×1
Rupp Air Systems Model #RARTU3-I.400-20-20T-DOAS 3,750 CFM · Rooftop Unit ×1
Trane Trane Model #TUHYE0723AN41AN 72,000 BTU · Vrf Outdoor ×14
Trane Midel #TURYE1203AN41AN 120,000 BTU · Vrf Outdoor ×4
Trane Model #MXZ-SM48NAM2 48,000 BTU · Vrf Outdoor ×2
Trane Midel #TURYE0963AN41AN 96,000 BTU · Vrf Outdoor ×1
Ventilation
Mitsubishi Electric PEFY-P12NMAU-E4 371 CFM · Vrf Indoor ×28
PEFY-P18NMAU-E4 600 CFM · Vrf Indoor ×11
PEFY-P08NMAU-E4 300 CFM · Vrf Indoor ×9
PEFY-P30NMAU-E4 883 CFM · Vrf Indoor ×9
PEFY-P24NMAU-E4 883 CFM · Vrf Indoor ×7
PEFY-P36NMAU-E4 1,271 CFM · Vrf Indoor ×7
PVFY-P24NAMU-E1 883 CFM · Vrf Indoor ×2
Enervex MBESV315 / EFV315 875 CFM · Exhaust Fan ×2
MBES355x / BEF355X 1,600 CFM · Exhaust Fan ×1
MBES355x / EFV355x 1,300 CFM · Exhaust Fan ×1
MBES450x / BEF450X 2,150 CFM · Exhaust Fan ×1
MBES500x / BEF500x 3,225 CFM · Kitchen Exhaust ×1
MBESV250 / EFV250 700 CFM · Exhaust Fan ×1
MBESV450 / EFV450 2,375 CFM · Kitchen Exhaust ×1
Greenheck AX-47-190-0422-M50 6,000 CFM · Exhaust Fan ×3
SQ-120-A 1,600 CFM · Exhaust Fan ×1
SQ-160-A 4,000 CFM · Exhaust Fan ×1
Greenheck Model #G-100HP-VG 875 CFM · Exhaust Fan ×3
Greenheck Model #G-200HP-VG 2,375 CFM · Kitchen Exhaust ×2
Greenheck Model #GJI-25-LP 2,216 CFM · Exhaust Fan ×2
Greenheck Model # G-120HP-VG 1,600 CFM · Exhaust Fan ×1
Greenheck Model # G-200HP-VG 3,225 CFM · Kitchen Exhaust ×1
Greenheck Model #AX-36-160-0434-M30 1,600 CFM · Exhaust Fan ×1
Greenheck Model #CSP-A780 650 CFM · Exhaust Fan ×1
Greenheck Model #G-120-VG 1,150 CFM · Exhaust Fan ×1
Greenheck Model #G-140HP-VG 1,300 CFM · Exhaust Fan ×1
Greenheck Model #SQ-120 4,000 CFM · Exhaust Fan ×1
Panasonic Panasonic Model # FV-0511VF1 50 CFM · Exhaust Fan ×87
Trane Trane Model #PEFY-P12NMAU-E4 371 CFM · Vrf Indoor ×28
Trane Model #PEFY-P18NMAU-E4 600 CFM · Vrf Indoor ×11
Trane Midel #PEFY-P08NMAU-E4 300 CFM · Vrf Indoor ×9
Trane Midel #PEFY-P30NMAU-E4 883 CFM · Vrf Indoor ×9
Trane Model #PEFY-P24NMAU-E4 883 CFM · Vrf Indoor ×7
Trane Model #PEFY-P36NMAU-E4 1,271 CFM · Vrf Indoor ×7
Trane Midel #PVFY-P24NAMU-E1 735 CFM · Vrf Indoor ×1
Trane Model # PVFY-P12NAMU-E1 400 CFM · Vrf Indoor ×1
Trane Model #PVFY-P24NAMU-E1 883 CFM · Vrf Indoor ×1
Generators
Generac SG080 4.5L 80 kW · Generator ×1
General Model #SG080 4.5L 80 kW · Generator ×1
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×2
Heating
Berko Berko Model # FFCH558 300 CFM · Electric Heater ×21
Berko Model #SSHOWH4008-HTWHSM 100 CFM · Electric Heater ×14
Berko Model # SSHOWH4008-HTWHS1 100 CFM · Electric Heater ×9
1 project · most recent 07/28/2026
Sprinkler System
FiledStatusContractorScope
07/28/2026Permit IssuedKG SPRINKLER CORPSprinkler System
1 project · most recent 07/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/28/2026Permit IssuedHENRY MYERS PLUMBING & HEATING INCGas, Storm, Water/Sanitary
5 projects · most recent 12/11/2025
General Wiring
FiledStatusContractorScope
12/11/2025Permit IssuedS & D ELECTRIC NY CORPGeneral Wiring
04/15/2025Permit IssuedS & D ELECTRIC NY CORP—
01/29/2025Permit IssuedJAM ELECTRICAL CORP—
10/06/2024Permit IssuedS & D ELECTRIC NY CORPGeneral Wiring
05/31/2024Permit IssuedTOP SHELF ELECTRIC CORP—
1 project · most recent 07/28/2026
Steel
FiledStatusContractorScope
07/28/2026Permit IssuedHENRY MYERS PLUMBING & HEATING INCSteel
2 projects · most recent 05/11/2025
Fence Sidewalk Shed
FiledStatusContractorScope
05/11/2025Permit IssuedTITANIUM CONSTRUCTION SERFence
12/10/2024Permit IssuedSKYLINE SCAFFOLDING GROUPSidewalk Shed
1 project · most recent 04/22/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/22/2025Permit IssuedJEM CONTRACTING CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/24/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
11/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/05/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
07/23/2026Sprinkler SystemsMOLLY GLENNspecial
07/23/2026Standpipe SystemsMOLLY GLENNspecial
04/23/2026HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
04/23/2026Maintenance informationMOLLY GLENNenergy_progress
04/23/2026HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
04/23/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
04/23/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOLLY GLENNspecial
04/23/2026Post-installed AnchorsMOLLY GLENNspecial
04/23/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
04/23/2026Electrical motors and elevatorsMOLLY GLENNenergy_progress
04/16/2026Shutoff dampersMOLLY GLENNenergy_progress
04/16/2026Chimneys and ventsMOLLY GLENNspecial
04/16/2026Emergency and Standby Power Systems (Generator)MOLLY GLENNspecial
04/16/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
04/16/2026Mechanical SystemsMOLLY GLENNspecial
04/16/2026Post-installed AnchorsMOLLY GLENNspecial
04/16/2026Energy Code Compliance InspectionsMOLLY GLENNprogress
04/16/2026FinalMOLLY GLENNprogress
04/16/2026Lighting in dwelling unitsMOLLY GLENNenergy_progress
04/16/2026Electrical motors and elevatorsMOLLY GLENNenergy_progress
04/16/2026Exterior lighting powerMOLLY GLENNenergy_progress
04/16/2026HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
04/16/2026FireplacesMOLLY GLENNenergy_progress
04/16/2026MeteringMOLLY GLENNenergy_progress
04/16/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
Latest 25 of 120.
▾Documents — 235 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch50
09/01/2026M08023095-I1Request digital key ↗
08/31/2026M00856747-I1Request digital key ↗
08/31/2026M00856747-P1Request digital key ↗
Showing 3 of 50 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
05/08/2023141023167Open ↗
12/27/2013121872349Open ↗
12/27/2013121872367Open ↗
▸BISWORK PERMIT APPLICATION2
01/30/2014121872367Open ↗
01/22/2014121872349Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/08/2023141023167Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026M00766992-P3Open ↗
08/13/2026M00766992-I1Open ↗
08/13/2026M00766992-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026M00766992-P5Open ↗
08/13/2026M00766992-I1Open ↗
08/13/2026M00766992-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00766992-I1Open ↗
▸Seals & Professional Certifications99
▸DOB NOWDPL-1: Design Professional Seal & Signature48
08/28/2026M00956188-P2Open ↗
08/28/2026M00956188-I1Open ↗
08/28/2026M00956188-P1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/06/2026M00766992-Z1Open ↗
09/06/2026M00856714-I1Open ↗
09/06/2026M00856714-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/06/2026M00766992-Z1Open ↗
09/06/2026M00856714-I1Open ↗
09/05/2026M00766992-S4Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/27/2013121872349Open ↗
12/27/2013121872367Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/27/2013121872367Open ↗
12/27/2013121872349Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/22/2014121872367Open ↗
01/22/2014121872349Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/08/2023141023167Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/08/2023141023167Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026M00766992-P3Open ↗
08/13/2026M00766992-P6Open ↗
08/13/2026M00766992-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026M00766992-I1—
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
05/08/2023141023167Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00766992-I1Open ↗
▸Environmental & Asbestos29
▸DOB NOWOER: Notice to Proceed17
08/14/2026M00766992-S1Open ↗
08/13/2026M00766992-S1Open ↗
08/13/2026M00766992-P6Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/17/2026M00766992-Z1Open ↗
08/13/2026M00856714-I1Open ↗
08/13/2026M00766992-S6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M00856714-I1Open ↗
08/13/2026M00856738-I1Open ↗
08/13/2026M00856747-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/27/2013121872349Open ↗
12/27/2013121872367Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
05/08/2023141023167Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/27/2013121872367Open ↗
12/27/2013121872349Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00766992-S4Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026M00766992-S4Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/27/2013121872349Open ↗
12/27/2013121872367Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET2
12/27/2013121872367Open ↗
12/27/2013121872349Open ↗
▸BISADDITIONAL INFORMATION2
06/27/2023141023167Open ↗
02/13/2014121872367Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M01113468-P1Open ↗
08/16/2026M01113468-P2Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/08/2023141023167Open ↗
▸Other Documents22
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026M00766992-P3Open ↗
08/13/2026M00766992-P6Open ↗
08/13/2026M00766992-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026M00766992-P5Open ↗
08/17/2026M00766992-P6Open ↗
08/17/2026M00766992-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026M00766992-P3Open ↗
08/13/2026M00766992-P6Open ↗
08/13/2026M00766992-P5Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED2
01/17/2014121872349Open ↗
01/14/2014121872367Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
08/13/2026M00856747-I1Open ↗
08/13/2026M00766992-Z1Open ↗
▸DOB NOWCalculations2
08/24/2026M01162163-I1Open ↗
08/13/2026M01162163-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/24/2026M01162163-I1Open ↗
08/13/2026M01162163-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026M00856738-I1Open ↗
08/13/2026M00766992-S6Open ↗