| Owner | Filings | Most Recent |
|---|---|---|
| SKYLINE SCAFFOLDING GROUP | 23 | 09/02/2026 |
| TITANIUM CONSTRUCTION SER | 8 | 07/08/2026 |
| ALBA SERVICES INC | 13 | 03/22/2026 |
| LOVES LANE OWNER LLC | 1 | 03/22/2026 |
| JADLAMM REALTY | 10 | 03/22/2026 |
| SADKAMM REALTY | 1 | 03/22/2026 |
| ELBERT HOLDING CORP | 1 | 03/22/2026 |
| ANN SERVICE | 6 | 03/21/2026 |
| JADAMM REALTY | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EP ENGINEERING LLC | 9 | 07/28/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 6 | 12/15/2025 |
| BKSK ARCHITECTS, LLP | 6 | 12/11/2025 |
| ASHRAF CORP | 4 | 05/11/2025 |
| RIGID STRUCTURAL DESIGN, LLC | 7 | 05/09/2025 |
| KN3 ENGINEERING LLC | 2 | 04/22/2025 |
| PLAN B ENGINEERING | 3 | 03/26/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 11/26/2024 |
| ANCORA ENGINEERING, PLLC | 7 | 06/28/2024 |
| GACE DPC | 3 | 04/11/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| AE DESIGN SOLUTION | 16 | 03/21/2026 |
| Rigid Structural Design, LLC | 11 | 03/21/2026 |
| KD DESIGNS | 4 | 03/21/2026 |
| EAST COAST EXPEDITING | 22 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 6 | 03/21/2026 |
| LOMBARDO PROFESSIONAL ENG DPC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TITANIUM CONSTRUCTION SER | General Contractor | 43 | 09/07/2026 |
| SKYLINE SCAFFOLDING GROUP | General Contractor | 20 | 09/02/2026 |
| KG SPRINKLER CORP | Fire Protection | 9 | 08/20/2026 |
| JEM CONTRACTING CORP | General Contractor | 8 | 07/08/2026 |
| HENRY MYERS P & H, INC | Plumbing | 6 | 09/30/2026 |
| ALBA SERVICES INC | General Contractor | 5 | 07/08/2026 |
| PLUMBING NYC INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| EP INSPECTIONS AND COMMIS | 7079 | 11 | 07/28/2026 |
| PSI AGENCY INC. | 254 | 13 | 12/11/2025 |
| LEO Y LEE ASSOCIATES | 2481 | 2 | 04/22/2025 |
| GTA ENGINEERING SERVICES | 2940 | 1 | 04/11/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | HENRY MYERS P & H, INC | 09/29/2026 |
| DOB NOW | Foundation | Permit Issued | TITANIUM CONSTRUCTION SER | 09/03/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SKYLINE SCAFFOLDING GROUP | 09/01/2026 |
| DOB NOW | Standpipe | Permit Issued | KG SPRINKLER CORP | 08/11/2026 |
| DOB NOW | Plumbing | Permit Issued | HENRY MYERS P & H, INC | 08/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | KG SPRINKLER CORP | 08/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | KG SPRINKLER CORP | 08/11/2026 |
| DOB NOW | General Construction | Permit Issued | TITANIUM CONSTRUCTION SER | 07/13/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SKYLINE SCAFFOLDING GROUP | 06/12/2026 |
| DOB NOW | Supported Scaffold | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/14/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/14/2026 |
| DOB NOW | Construction Fence | Permit Issued | TITANIUM CONSTRUCTION SER | 04/29/2026 |
| DOB NOW | Supported Scaffold | Signed-off | JEM CONTRACTING CORP | 03/27/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | JEM CONTRACTING CORP | 03/27/2026 |
| DOB NOW | Plumbing | Permit Issued | PLUMBING WORKS NYC INC | 01/14/2026 |
| DOB NOW | Supported Scaffold | Signed-off | JEM CONTRACTING CORP | 12/11/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | JEM CONTRACTING CORP | 12/11/2025 |
| DOB NOW | Structural | Permit Issued | TITANIUM CONSTRUCTION SER | 12/05/2025 |
| DOB NOW | Foundation | Signed-off | TITANIUM CONSTRUCTION SER | 09/10/2025 |
| DOB NOW | Foundation | Permit Issued | TITANIUM CONSTRUCTION SER | 09/09/2025 |
| DOB NOW | Support of Excavation | Signed-off | TITANIUM CONSTRUCTION SER | 09/09/2025 |
| DOB NOW | Plumbing | Permit Issued | HENRY MYERS P & H, INC | 07/21/2025 |
| DOB NOW | General Construction | Permit Issued | TITANIUM CONSTRUCTION SER | 07/08/2025 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 07/01/2025 |
| DOB NOW | Standpipe | Permit Issued | H M SPRINKLER INC | 07/01/2025 |
| DOB NOW | Plumbing | Permit Issued | HENRY MYERS P & H, INC | 07/01/2025 |
| DOB NOW | Standpipe | Permit Issued | H M SPRINKLER INC | 07/01/2025 |
| DOB NOW | Supported Scaffold | Signed-off | SKYLINE SCAFFOLDING GROUP | 06/17/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | TITANIUM CONSTRUCTION SER | 06/03/2025 |
| DOB NOW | Supported Scaffold | Signed-off | JEM CONTRACTING CORP | 06/03/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/15/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | SKYLINE SCAFFOLDING GROUP | 05/15/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SKYLINE SCAFFOLDING GROUP | 05/15/2025 |
| DOB NOW | Construction Fence | Permit Issued | TITANIUM CONSTRUCTION SER | 05/12/2025 |
| DOB NOW | Construction Fence | Signed-off | TITANIUM CONSTRUCTION SER | 04/16/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | JEM CONTRACTING CORP | 04/11/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | JEM CONTRACTING CORP | 02/26/2025 |
| DOB NOW | Supported Scaffold | Signed-off | JEM CONTRACTING CORP | 02/14/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ALBA SERVICES INC | 11/27/2024 |
| DOB NOW | Construction Fence | Signed-off | ALBA SERVICES INC | 10/22/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/28/2026 | Permit Issued | TITANIUM CONSTRUCTION SER | Air Conditioning Systems, Associated Ducts and Piping, Generators, Heating and Air Conditioning Systems | Cooling Mitsubishi Electric PKA-A24KA7 635 CFM · Ductwork ×1 Friedrich Friedrich Model #UET12B33A 12 BTU · Ptac ×2 Heat / Cool Mitsubishi Electric PURY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×14 PURY-EP120TNU-A 120,000 BTU · Vrf Outdoor ×4 PUMY-P36NKMU 36,000 BTU · Vrf Outdoor ×2 PUMY-P48NKMU 48,000 BTU · Vrf Outdoor ×2 PURY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1 Trane Model #MXZ-SM36NAM2 36,000 BTU · Vrf Outdoor ×2 Rupp Air RARTU3-I.400-20-20T-DOAS 3,750 CFM · Rooftop Unit ×1 Rupp Air Systems Model #RARTU3-I.400-20-20T-DOAS 3,750 CFM · Rooftop Unit ×1 Trane Trane Model #TUHYE0723AN41AN 72,000 BTU · Vrf Outdoor ×14 Trane Midel #TURYE1203AN41AN 120,000 BTU · Vrf Outdoor ×4 Trane Model #MXZ-SM48NAM2 48,000 BTU · Vrf Outdoor ×2 Trane Midel #TURYE0963AN41AN 96,000 BTU · Vrf Outdoor ×1 Ventilation Mitsubishi Electric PEFY-P12NMAU-E4 371 CFM · Vrf Indoor ×28 PEFY-P18NMAU-E4 600 CFM · Vrf Indoor ×11 PEFY-P08NMAU-E4 300 CFM · Vrf Indoor ×9 PEFY-P30NMAU-E4 883 CFM · Vrf Indoor ×9 PEFY-P24NMAU-E4 883 CFM · Vrf Indoor ×7 PEFY-P36NMAU-E4 1,271 CFM · Vrf Indoor ×7 PVFY-P24NAMU-E1 883 CFM · Vrf Indoor ×2 Enervex MBESV315 / EFV315 875 CFM · Exhaust Fan ×2 MBES355x / BEF355X 1,600 CFM · Exhaust Fan ×1 MBES355x / EFV355x 1,300 CFM · Exhaust Fan ×1 MBES450x / BEF450X 2,150 CFM · Exhaust Fan ×1 MBES500x / BEF500x 3,225 CFM · Kitchen Exhaust ×1 MBESV250 / EFV250 700 CFM · Exhaust Fan ×1 MBESV450 / EFV450 2,375 CFM · Kitchen Exhaust ×1 Greenheck AX-47-190-0422-M50 6,000 CFM · Exhaust Fan ×3 SQ-120-A 1,600 CFM · Exhaust Fan ×1 SQ-160-A 4,000 CFM · Exhaust Fan ×1 Greenheck Model #G-100HP-VG 875 CFM · Exhaust Fan ×3 Greenheck Model #G-200HP-VG 2,375 CFM · Kitchen Exhaust ×2 Greenheck Model #GJI-25-LP 2,216 CFM · Exhaust Fan ×2 Greenheck Model # G-120HP-VG 1,600 CFM · Exhaust Fan ×1 Greenheck Model # G-200HP-VG 3,225 CFM · Kitchen Exhaust ×1 Greenheck Model #AX-36-160-0434-M30 1,600 CFM · Exhaust Fan ×1 Greenheck Model #CSP-A780 650 CFM · Exhaust Fan ×1 Greenheck Model #G-120-VG 1,150 CFM · Exhaust Fan ×1 Greenheck Model #G-140HP-VG 1,300 CFM · Exhaust Fan ×1 Greenheck Model #SQ-120 4,000 CFM · Exhaust Fan ×1 Panasonic Panasonic Model # FV-0511VF1 50 CFM · Exhaust Fan ×87 Trane Trane Model #PEFY-P12NMAU-E4 371 CFM · Vrf Indoor ×28 Trane Model #PEFY-P18NMAU-E4 600 CFM · Vrf Indoor ×11 Trane Midel #PEFY-P08NMAU-E4 300 CFM · Vrf Indoor ×9 Trane Midel #PEFY-P30NMAU-E4 883 CFM · Vrf Indoor ×9 Trane Model #PEFY-P24NMAU-E4 883 CFM · Vrf Indoor ×7 Trane Model #PEFY-P36NMAU-E4 1,271 CFM · Vrf Indoor ×7 Trane Midel #PVFY-P24NAMU-E1 735 CFM · Vrf Indoor ×1 Trane Model # PVFY-P12NAMU-E1 400 CFM · Vrf Indoor ×1 Trane Model #PVFY-P24NAMU-E1 883 CFM · Vrf Indoor ×1 Generators Ducts & Piping N/A N/A 1 CFM · Ductwork ×2 Heating Berko Berko Model # FFCH558 300 CFM · Electric Heater ×21 Berko Model #SSHOWH4008-HTWHSM 100 CFM · Electric Heater ×14 Berko Model # SSHOWH4008-HTWHS1 100 CFM · Electric Heater ×9 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Permit Issued | KG SPRINKLER CORP | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Permit Issued | HENRY MYERS PLUMBING & HEATING INC | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/11/2025 | Permit Issued | S & D ELECTRIC NY CORP | General Wiring |
| 04/15/2025 | Permit Issued | S & D ELECTRIC NY CORP | — |
| 01/29/2025 | Permit Issued | JAM ELECTRICAL CORP | — |
| 10/06/2024 | Permit Issued | S & D ELECTRIC NY CORP | General Wiring |
| 05/31/2024 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Permit Issued | HENRY MYERS PLUMBING & HEATING INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/11/2025 | Permit Issued | TITANIUM CONSTRUCTION SER | Fence |
| 12/10/2024 | Permit Issued | SKYLINE SCAFFOLDING GROUP | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2025 | Permit Issued | JEM CONTRACTING CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/04/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 04/24/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 11/26/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/23/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/14/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/05/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/05/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 05/23/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/15/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 11/15/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/07/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/23/2026 | Sprinkler Systems | MOLLY GLENN | special |
| 07/23/2026 | Standpipe Systems | MOLLY GLENN | special |
| 04/23/2026 | HVAC-R and service water heating equipment | MOLLY GLENN | energy_progress |
| 04/23/2026 | Maintenance information | MOLLY GLENN | energy_progress |
| 04/23/2026 | HVAC-R and service water heating system controls | MOLLY GLENN | energy_progress |
| 04/23/2026 | HVAC-R and service water piping design and insulation | MOLLY GLENN | energy_progress |
| 04/23/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | MOLLY GLENN | special |
| 04/23/2026 | Post-installed Anchors | MOLLY GLENN | special |
| 04/23/2026 | Fire-Resistant Penetrations and Joints | MOLLY GLENN | special |
| 04/23/2026 | Electrical motors and elevators | MOLLY GLENN | energy_progress |
| 04/16/2026 | Shutoff dampers | MOLLY GLENN | energy_progress |
| 04/16/2026 | Chimneys and vents | MOLLY GLENN | special |
| 04/16/2026 | Emergency and Standby Power Systems (Generator) | MOLLY GLENN | special |
| 04/16/2026 | Fire-Resistant Penetrations and Joints | MOLLY GLENN | special |
| 04/16/2026 | Mechanical Systems | MOLLY GLENN | special |
| 04/16/2026 | Post-installed Anchors | MOLLY GLENN | special |
| 04/16/2026 | Energy Code Compliance Inspections | MOLLY GLENN | progress |
| 04/16/2026 | Final | MOLLY GLENN | progress |
| 04/16/2026 | Lighting in dwelling units | MOLLY GLENN | energy_progress |
| 04/16/2026 | Electrical motors and elevators | MOLLY GLENN | energy_progress |
| 04/16/2026 | Exterior lighting power | MOLLY GLENN | energy_progress |
| 04/16/2026 | HVAC-R and service water heating system controls | MOLLY GLENN | energy_progress |
| 04/16/2026 | Fireplaces | MOLLY GLENN | energy_progress |
| 04/16/2026 | Metering | MOLLY GLENN | energy_progress |
| 04/16/2026 | HVAC-R and service water piping design and insulation | MOLLY GLENN | energy_progress |