← Back
Predominantly retail with other uses
142 WEST 32 STREET
MANHATTAN · BIN 1015188
💬 Discuss this project
1920Year Built
3Stories
K4Building Class
C6-4.5Zoning
2,940 sfGross Floor Area
3Units
4 Open Violations 1 unresolved · 3 paperwork only ▸
Predominantly retail with other uses · Owner of record: 138-142 WEST 32ND STREET LLC · 980 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Cellar4p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VORNADO REALTY TRUST1407/08/2026
138-40 W 32 ST ASSOC.103/22/2026
VORNADO OFFICE MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
2L ENGINEERING, DPC406/06/2024
WID CHAPMAN ARCHITECTS104/28/2023
BAILEYS ENGINEERING PC208/03/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1003/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor507/08/2026
EXCLUSIVE RESTORATION &General Contractor407/08/2026
FRANKIE PLBG & HTG L.L.CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRENT M. PORTER, ARCHITEC4140206/06/2024
CMSC, INC6098406/06/2024
OUTSOURCE SPECIAL INSPECT2827104/28/2023
Building Lifecycle
All (39)Filed (7)Permit Issued (6)Signed Off (5)Violation (5)Inspection (3)Special Inspection (13)
07/10/2024
Signed off — Alteration
Propose plumbing modifications at commercial space all as per plans herewith filed.
M00858009-I1
07/09/2024
Signed off — Alteration
Propose plumbing modifications at commercial space all as per plans herewith filed.
M00858009-S1
07/09/2024
Signed off — Alteration
Propose plumbing modifications at commercial space all as per plans herewith filed.
M00858009-S2
06/06/2024
Filed — Alteration
Propose plumbing modifications at commercial space all as per plans herewith filed.
M00858009-P2
05/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
Brent Porter
05/24/2024
Special inspection requirement — Final
Jeremy Latterman
05/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Brent Porter
05/24/2024
Special inspection requirement — Post-installed Anchors
EDUARD GRINFELD
05/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
Brent Porter
05/24/2024
Special inspection requirement — Mechanical Systems
Brent Porter
05/14/2024
Permit issued — Mechanical Systems
M00858009-S2-MS
12/12/2023
Filed — Alteration
Propose plumbing modifications at commercial space all as per plans herewith filed.
M00858009-P1
11/03/2023
Special inspection requirement — Post-installed Anchors
EDUARD GRINFELD
10/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/04/2023
Permit issued — Plumbing
M00858009-S1-PL
06/20/2023
Filed — Alteration
Propose plumbing modifications at commercial space all as per plans herewith filed.
M00858009-S1
06/20/2023
Filed — Alteration
Propose plumbing modifications at commercial space all as per plans herewith filed.
M00858009-S2
05/12/2023
Permit issued — General Construction
M00858009-I1-GC
04/28/2023
Filed — Alteration
Propose plumbing modifications at commercial space all as per plans herewith filed.
M00858009-I1
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
04/18/2023
Special inspection requirement — Preliminary
JONAR MADRIAGA
04/18/2023
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
04/18/2023
Special inspection requirement — Lighting controls
JONAR MADRIAGA
04/11/2023
Special inspection requirement — Final
George Chapman
11/21/2019
Signed off — Alteration
M00048932-I1
02/11/2019
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00065761-I1
08/03/2018
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00065761-I1
08/03/2018
Permit issued — Supported Scaffold
M00065761-I1-SF
07/27/2018
Special inspection requirement — Final
PAUL BAILEY
07/26/2018
Permit issued — Sidewalk Shed
M00048932-I1-SH
06/05/2018
Filed — Alteration
M00048932-I1
06/05/2018
Permit issued — Sidewalk Shed
M00048932-I1-SH
12/16/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/17/1993
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
01/03/1989
Violation issued (ECB, open)
Boilers
10/04/1988
Violation issued (ECB, open)
Construction
08/31/1988
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offEXCLUSIVE RESTORATION &05/14/2024
DOB NOWPlumbingSigned-offFRANKIE PLBG & HTG L.L.C09/04/2023
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE RESTORATION &05/12/2023
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC08/03/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/26/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC06/05/2018
BISOTISSUEDLHOTSE CORP10/11/2018
1 project · most recent 06/04/2018
FiledStatusContractorScope
06/04/2018CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/24/2024HVAC-R and service water heating equipmentBrent Porterenergy_progress
05/24/2024FinalJeremy Lattermanprogress
05/24/2024HVAC-R and service water piping design and insulationBrent Porterenergy_progress
05/24/2024Post-installed AnchorsEDUARD GRINFELDspecial
05/24/2024HVAC-R and service water heating system controlsBrent Porterenergy_progress
05/24/2024Mechanical SystemsBrent Porterspecial
11/03/2023Post-installed AnchorsEDUARD GRINFELDspecial
04/18/2023Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
04/18/2023PreliminaryJONAR MADRIAGAprogress
04/18/2023Energy Code Compliance InspectionsJONAR MADRIAGAprogress
04/18/2023Lighting controlsJONAR MADRIAGAenergy_progress
04/11/2023FinalGeorge Chapmanprogress
07/27/2018FinalPAUL BAILEYprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/06/2026M00048932-I1Request digital key ↗
09/06/2026M00065761-I1Request digital key ↗
08/30/2026M00858009-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
10/11/2018123481400Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/11/2018123481400Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
09/20/2026M00858009-I1Open ↗
09/20/2026M00858009-I1Open ↗
09/20/2026M00858009-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/06/2026M00065761-I1Open ↗
08/30/2026M00858009-S1Open ↗
08/30/2026M00858009-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/20/2026M00858009-I1Open ↗
08/31/2026M00858009-P2Open ↗
08/31/2026M00858009-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/15/2019123481400Open ↗
10/15/2019123481400Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/11/2018123481400Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/11/2018123481400Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/06/2026M00065761-I1Open ↗
08/30/2026M00858009-P2Open ↗
08/30/2026M00858009-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/11/2018123481400Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/15/2019123481400Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/15/2019123481400Open ↗
10/11/2018123481400Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
10/15/2019123481400Open ↗
▸BISEFILING COVER SHEET1
10/11/2018123481400Open ↗