← Back
Walk-up apt, over six families with stores
1420 MERMAID AVENUE
BROOKLYN · Coney Island-Sea Gate · BIN 3339621
💬 Discuss this project
1921Year Built
4Stories
C7Building Class
R7XZoning
26,637 sfGross Floor Area
22Units
LL97 CoveredRent Stabilized110 Open Violations 108 unresolved · 2 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: RLM REALTY CORP · 8,300 sf lot · 3.21 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof4p · 3 filings · 20 docs
Floor 150p · 4 filings · 20 docs
Site & exterior4p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RLM REALTY1503/22/2026
METRO CONTRACTING INC403/21/2026
RUSSO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.1003/21/2026
NATIONAL MAINTENANCE403/21/2026
CCM CONSULTING GROUP, INC.203/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLUNE CONSTRUCTION CO LPGeneral Contractor807/08/2026
CEL TECH ELECTRIC INCGeneral Contractor303/21/2026
NATIONAL MAINTENANCEScaffold207/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor104/09/2026
MAC FELDER INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE MTM DESIGN GROUP, LLC1319201/16/2023
DOMANI INSPECTION SERVICE843508/08/2022
KMB DESIGN GROUP, LLC513206/24/2020
Building Lifecycle
All (100)Filed (13)Permit Issued (12)Signed Off (8)Violation (15)Inspection (4)Objection (18)Special Inspection (30)
01/14/2025
Signed off — Alteration
VERIZON SITE MODIFICATIONS. REMOVE (1) EXISTING ANTENNA AND (2) EXISTING RRH UNITS. REINSTALL (1) EXISTING ANTENNA. RELATED CONDUIT ROUTAGE ACROSS ROOFTOP FOR EQUIPMENT SERVICING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00729467-I1
06/08/2023
Permit issued — Antenna
B00729467-I1-AN
03/04/2023
Permit issued — Antenna
B00729467-I1-AN
02/23/2023
Signed off — Alteration
ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR CHASE, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00558800-I1
02/23/2023
Signed off — Alteration
ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR CHASE, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00558812-I1
01/24/2023
Objection raised — Scope
01/24/2023
Objection resolved — Addressed
01/16/2023
Filed — Alteration
VERIZON SITE MODIFICATIONS. REMOVE (1) EXISTING ANTENNA AND (2) EXISTING RRH UNITS. REINSTALL (1) EXISTING ANTENNA. RELATED CONDUIT ROUTAGE ACROSS ROOFTOP FOR EQUIPMENT SERVICING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00729467-I1
08/16/2022
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy. Energy Analysis for lighting fixtures is listed in the related General Construction Application B00481595
B00474352-I1
08/08/2022
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy. Energy Analysis for lighting fixtures is listed in the related General Construction Application B00481595
B00474352-P2
08/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — Final
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — Ventilation and air distribution system
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — Permanent certificate
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/08/2022
Special inspection requirement — Metering
JOHN MCMONAGLE
05/11/2022
Signed off — Alteration
B00481595-I1
04/29/2022
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy. Energy Analysis for lighting fixtures is listed in the related General Construction Application B00481595
B00474352-P1
04/21/2022
Signed off — Alteration
Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
B00481605-I1
02/11/2022
Signed off — Alteration
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
B00483918-I1
01/24/2022
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — Metering
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — Ventilation and air distribution system
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — Permanent certificate
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
01/24/2022
Special inspection requirement — Final
JOHN MCMONAGLE
11/18/2021
Filed — Alteration
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
B00483918-P2
10/25/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2021
Filed — Alteration
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
B00483918-P1
09/23/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/08/2021
Permit issued — Sign
B00558800-I1-SG
09/02/2021
Permit issued — Sign
B00558812-I1-SG
09/01/2021
Filed — Alteration
ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR CHASE, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00558800-I1
09/01/2021
Filed — Alteration
ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR CHASE, NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00558812-I1
08/25/2021
Special inspection requirement — Final
AHMED SHAABAN
08/23/2021
Permit issued — Structural
B00481605-I1-ST
08/23/2021
Permit issued — Mechanical Systems
B00474352-I1-MS
08/18/2021
Permit issued — General Construction
B00481595-I1-GC
08/03/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/29/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/21/2021
Permit issued — Plumbing
B00483918-I1-PL
06/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/25/2021
Permit issued — Mechanical Systems
B00474352-I1-MS
05/19/2021
Permit issued — General Construction
B00481595-I1-GC
05/19/2021
Permit issued — Structural
B00481605-I1-ST
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/27/2021
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy. Energy Analysis for lighting fixtures is listed in the related General Construction Application B00481595
B00474352-I1
04/27/2021
Filed — Alteration
B00481595-I1
04/27/2021
Filed — Alteration
Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
B00481605-I1
04/27/2021
Filed — Alteration
Modification to existing plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
B00483918-I1
03/23/2021
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
03/23/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offCEL TECH ELECTRIC INC06/08/2023
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP03/04/2023
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC09/08/2021
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC09/02/2021
DOB NOWStructuralSigned-offCLUNE CONSTRUCTION CO LP08/23/2021
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP08/23/2021
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP08/18/2021
DOB NOWPlumbingSigned-offMAC FELDER INC06/21/2021
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP05/25/2021
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP05/19/2021
DOB NOWStructuralSigned-offCLUNE CONSTRUCTION CO LP05/19/2021
DOB NOWAntennaSigned-offEC ELECTRICAL CONTRACTOR04/12/2019
BISMHISSUEDEC ELECTRICAL CONTRACTOR02/19/2020
BISMHISSUEDEC ELECTRICAL CONTRACTOR07/16/2019
BISOTISSUEDTKO INSTALLATIONS INC03/10/2016
BISEQISSUEDMETRO CONTRACTING NY, INC.03/14/2014
BISPLISSUEDMCPHEE&SON PL-HT-CL CORP04/11/2007
BISOTISSUEDAMERICAN EAGLE SECURITY INC.02/21/2007
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/29/2004
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/06/2002
BISMHISSUEDCABE CONSTRUCTION CORP.09/10/1998
BISFPISSUEDACTIVE FIRE EXTING.CO11/18/1992
BISPLISSUEDDUO DE MAIO10/05/1992
BISBLISSUEDCOLUMBIA UTILITIES HEATING CORP07/17/1992
1 project · most recent 06/11/2021
General Wiring
FiledStatusContractorScope
06/11/2021CompleteFREEDOM ELECTL & DATA INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/25/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/29/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/08/2022HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
08/08/2022Maintenance informationJOHN MCMONAGLEenergy_progress
08/08/2022HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
08/08/2022Mechanical SystemsJOHN MCMONAGLEspecial
08/08/2022FinalJOHN MCMONAGLEprogress
08/08/2022Ventilation and air distribution systemJOHN MCMONAGLEenergy_progress
08/08/2022Duct leakage testing, insulation and designJOHN MCMONAGLEenergy_progress
08/08/2022Permanent certificateJOHN MCMONAGLEenergy_progress
08/08/2022HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/08/2022MeteringJOHN MCMONAGLEenergy_progress
01/24/2022Mechanical SystemsJOHN MCMONAGLEspecial
01/24/2022MeteringJOHN MCMONAGLEenergy_progress
01/24/2022Ventilation and air distribution systemJOHN MCMONAGLEenergy_progress
01/24/2022Maintenance informationJOHN MCMONAGLEenergy_progress
01/24/2022HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
01/24/2022HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
01/24/2022Permanent certificateJOHN MCMONAGLEenergy_progress
01/24/2022Duct leakage testing, insulation and designJOHN MCMONAGLEenergy_progress
01/24/2022HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
01/24/2022FinalJOHN MCMONAGLEprogress
08/25/2021FinalAHMED SHAABANprogress
03/23/2021Lighting controlsJOHN MCMONAGLEenergy_progress
03/23/2021Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
03/23/2021Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
03/23/2021Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
Latest 25 of 36.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch9
09/01/2026B00481605-I1Request digital key ↗
09/01/2026B00481595-I1Request digital key ↗
09/01/2026B00558800-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/29/2026B00474352-I1Request digital key ↗
08/29/2026B00474352-P1Request digital key ↗
08/15/2026B00474352-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna2
08/15/2026B00081993-P1Request digital key ↗
08/15/2026B00081993-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION6
01/14/2022300168057Open ↗
07/15/2021300168057Open ↗
07/08/2021301138043Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
02/26/2020321970499Open ↗
07/18/2019321970499Open ↗
03/11/2016321316900Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/11/2016321316900Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWFlood Zone Compliance2
08/13/2026B00081993-I1Open ↗
08/13/2026B00081993-P1Open ↗
▸DOB NOWFlood Zone Design Certification2
08/13/2026B00081993-P1Open ↗
08/13/2026B00081993-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature31
08/27/2026B00481605-I1Open ↗
08/26/2026B00474352-P1Open ↗
08/26/2026B00474352-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026B00081993-I1Open ↗
09/02/2026B00081993-P1Open ↗
08/27/2026B00729467-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/26/2019321970499Open ↗
03/11/2016321316900Open ↗
03/11/2016321316900Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026B00481605-I1Open ↗
08/27/2026B00481605-I1Open ↗
08/26/2026B00474352-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/13/2014340126679Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/13/2014340126679Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/13/2014340126679Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/26/2019321970499Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/26/2019321970499Open ↗
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/15/2026B00729467-I1Open ↗
08/15/2026B00081993-P1Open ↗
08/15/2026B00081993-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice to Proceed13
08/13/2026B00558800-I1Open ↗
08/13/2026B00081993-I1Open ↗
08/13/2026B00081993-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026B00483918-I1Open ↗
08/13/2026B00081993-I1Open ↗
08/13/2026B00729467-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/26/2019321970499Open ↗
03/11/2016321316900Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
03/12/2016321316900Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00481595-I1Open ↗
08/13/2026B00474352-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2019321970499Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/13/2014340126679Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST3
11/05/2014340126679Open ↗
07/02/2014340126679Open ↗
06/23/2014340126679Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/11/2016321316900Open ↗
07/02/2014340126679Open ↗
06/23/2014340126679Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/26/2019321970499Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
04/21/2021301138043Open ↗
06/15/2016321316900Open ↗
11/03/2014340126679Open ↗
▸BISEFILING COVER SHEET2
06/26/2019321970499Open ↗
02/26/2016321316900Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/13/2014340126679Open ↗
▸Other Documents12
▸DOB NOWDHCR Document8
08/13/2026B00483918-P2Open ↗
08/13/2026B00481605-I1Open ↗
08/13/2026B00483918-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation2
08/13/2026B00081993-P1Open ↗
08/13/2026B00081993-I1Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
03/13/2014340126679Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026B00081993-I1Open ↗