← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1420 NOBLE AVENUE
BRONX · BIN 2028123
💬 Discuss this project
1930Year Built
6Stories
D1Building Class
R5Zoning
74,100 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized82 Active Violations 77 unresolved · 5 paperwork only 4 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: Parkash 1420 · 17,500 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHeavy duty sidewalk shed installation7p · 4 filings · 20 docs
Floor 6Plumbing fixture and gas range replacement, 1st to 6th floorUnder Construction42p · 2 filings · 20 docs
Floor 5Plumbing fixture and gas range replacement, 1st to 6th floorUnder Construction42p · 2 filings · 20 docs
Floor 4Plumbing fixture and gas range replacement, 1st to 6th floorUnder Construction31p · 1 filing · 20 docs
Floor 3Plumbing fixture and gas range replacement, 1st to 6th floorUnder Construction27p · 1 filing · 20 docs
Floor 2Plumbing fixture and gas range replacement, 1st to 6th floorUnder Construction28p · 1 filing · 20 docs
Floor 1Unit 1A, Unit 1GUnder Construction33p · 1 filing · 20 docs
BasementDecommissioning of telecommunications site and removal of ce1p · 1 filing · 4 docs
Site & exteriorHeavy duty sidewalk shed installation19p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1420 Noble Ave803/21/2026
Prime Realty Services Plus203/21/2026
Parkash 1420103/22/2026
Atlas Building103/22/2026
1420 Mobile Ave Partunes103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/19/2016$12.8M—PECONIC LLC → PARKASH 1420 LLC$172/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Architect Associates501/14/2026
Ashraf402/29/2024
P Georgopoulos Architect112/04/2023
HD Group309/11/2023
KMB Design Group109/09/2021
Royal T&E105/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Enkay Design Consulting603/21/2026
Rigid Structural Design103/21/2026
Architect1003/21/2026
Construction Permit Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triera ContractingScaffold707/08/2026
Doval Plumbing & HeatingPlumbing406/28/2026
Squan Construction ServicesGeneral Contractor403/21/2026
Arsh Landmark General ConScaffold303/21/2026
Arsh Landmark General ConGeneral Contractor303/21/2026
East End Construction & RGeneral Contractor303/21/2026
Steel SystemsScaffold303/21/2026
Ajay Contruction NYGeneral Contractor204/09/2026
Maniani BuildersScaffold107/08/2026
All Ways Electric Corp.wElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc-HI-Tech Associates6963501/14/2026
Norman C. Lok818102/12/2024
P Georgopoulos Architect889112/04/2023
KMB Design Group513109/09/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
06/30/2026
At the time of inspection, i observed a sidewalk shed erected around a 6-story building. Review of DOB now and BIS records indicates sidewalk shed…
ECB violation · open
06/30/2026
At the time of inspection of a 6-story building, i observed sidewalk shed in place, during my inspection i noticed sidewalk shed has no building…
ECB violation · open
04/07/2026
At the time of inspection, i observed a sidewalk shed erected around a 6-story occupied building. Review of DOB now and BIS records indicates…
ECB violation · open
04/06/2026
Failure to maintain exterior building facades and appurtenances. Noted: observed at exp 1(w. Elev) broken window glass at 6TH floor. Also observed…
ECB violation · open
285 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAjay Contruction NY03/26/2026
DOB NOWPlumbingPermit IssuedDoval Plumbing & Heating04/02/2025
DOB NOWGeneral ConstructionPermit IssuedAjay Contruction NY03/18/2025
DOB NOWSidewalk ShedPermit IssuedManiani Builders03/17/2025
DOB NOWSidewalk ShedPermit IssuedArsh Landmark General Con03/01/2024
DOB NOWGeneral ConstructionSigned-offArsh Landmark General Con02/16/2024
DOB NOWStructuralSigned-offEast End Construction & R08/11/2023
DOB NOWSidewalk ShedPermit IssuedSteel Systems06/16/2023
DOB NOWGeneral ConstructionSigned-offSquan Construction Services01/14/2022
DOB NOWGeneral ConstructionSigned-offSquan Construction Services10/21/2021
DOB NOWSidewalk ShedPermit IssuedTriera Contracting06/07/2021
DOB NOWSidewalk ShedPermit IssuedTriera Contracting06/08/2020
DOB NOWSidewalk ShedPermit IssuedTriera Contracting05/06/2019
BISOTISSUEDMoon Construction10/02/2020
BISOTISSUEDMetro RF Services12/02/2016
BISFSISSUEDWasoff Plumbing & Utl Co11/23/2015
BISPLISSUEDMarathon Mechanical10/01/2015
BISOTISSUEDAdvanced Chimney10/15/2014
BISOTISSUEDNational Microwave Contracting09/04/2013
BISOTISSUEDSquan Construction Services04/25/2013
BISOTISSUEDHighland Construction Associates12/03/2001
BISOTISSUEDTri-State Telecommunications04/25/2001
BISOTISSUEDOdyssia General Contracting03/23/2000
BISBLISSUEDJames Rhodes11/30/1999
1 project · most recent 01/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/14/2026Permit IssuedDoval Plumbing & HeatingGas, Water/Sanitary
7 projects · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025Permit IssuedL J Electrical ServiceGeneral Wiring
04/24/2025Permit IssuedL J Electrical ServiceGeneral Wiring
10/16/2024Permit IssuedL J Electrical ServiceGeneral Wiring
03/06/2024Permit IssuedRichard Neu—
06/23/2023Permit IssuedAll Ways Electric Corp.w—
06/13/2023Permit IssuedTop Shelf Electric—
05/03/2019CompleteTop Shelf Electric—
1 project · most recent 02/29/2024
Steel Wood
FiledStatusContractorScope
02/29/2024Permit IssuedManiani BuildersSteel, Wood
2 projects · most recent 02/29/2024
Sidewalk Shed
FiledStatusContractorScope
02/29/2024Permit IssuedManiani BuildersSidewalk Shed
05/06/2019Permit IssuedTriera ContractingSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/29/2026Energy Code Compliance InspectionsIGOR LISOVENKOprogress
01/29/2026Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
12/09/2025Energy Code Compliance InspectionsIGOR LISOVENKOprogress
12/09/2025Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
10/16/2025Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
10/16/2025Energy Code Compliance InspectionsIGOR LISOVENKOprogress
11/06/2024Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
11/06/2024Fire-Resistance Rated ConstructionIGOR LISOVENKOprogress
11/06/2024FinalIGOR LISOVENKOprogress
10/19/2024Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
10/19/2024Energy Code Compliance InspectionsIGOR LISOVENKOprogress
02/12/2024Insulation placement and R valuesEric Fosterenergy_progress
02/12/2024MasonryNORMAN LOKspecial
02/12/2024FinalEric Fosterprogress
02/12/2024Energy Code Compliance InspectionsEric Fosterprogress
02/12/2024Structural Steel - DetailsNORMAN LOKspecial
02/12/2024Structural Cold-Formed SteelNORMAN LOKspecial
02/12/2024Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
09/14/2023FinalHATIM ELSAIDprogress
151 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account