← Back
Five to six families
1421 DEKALB AVENUE
BROOKLYN · Bushwick (West) · BIN 3073578
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
4,350 sfGross Floor Area
6Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 1421 DEKALB AVENUE LLC · 2,500 sf lot · 1.74 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1421 DEKALB AVE2403/22/2026
OWNER OF PREMISES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSTANT AND BROWN ENGINEERING DPC806/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTANT AND BROWN ENGINEERING DPC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing307/08/2026
BROWN, RICHARDElectrical103/21/2026
VIVID MECHANICHAL, LLCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSTANT AND BROWN ENGINE7565606/17/2021
WGC SOLUTIONS4673503/05/2021
Building Lifecycle
All (93)Filed (8)Permit Issued (3)Violation (58)Inspection (2)Objection (2)Special Inspection (20)
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, closed)
I
08/24/2023
Violation issued (HPD, closed)
A
08/24/2023
Violation issued (HPD, open)
C
08/24/2023
Violation issued (HPD, open)
C
08/24/2023
Violation issued (HPD, open)
C
08/24/2023
Violation issued (HPD, closed)
C
08/24/2023
Violation issued (HPD, closed)
A
08/24/2023
Violation issued (HPD, closed)
A
08/24/2023
Violation issued (HPD, closed)
A
08/24/2023
Violation issued (HPD, closed)
A
08/24/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, open)
C
07/03/2023
Violation issued (HPD, open)
A
07/03/2023
Violation issued (HPD, open)
A
07/03/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, open)
C
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/22/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
06/29/2022
Violation issued (HPD, closed)
C
06/29/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
A
10/28/2021
Violation issued (HPD, open)
B
10/28/2021
Violation issued (HPD, closed)
A
08/27/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/16/2021
Permit issued — Boiler Equipment
B00292642-I1-BE
08/02/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2021
Permit issued — Plumbing
B00535934-I1-PL
06/17/2021
Filed — Alteration
B00535934-I1
03/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
VLADIMIR CONSTANT
03/19/2021
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
VLADIMIR CONSTANT
03/19/2021
Special inspection requirement — High Temperature Hot Water Piping (Welding)
WAYNE CLARKE
03/19/2021
Special inspection requirement — HVAC and service water heating system controls
VLADIMIR CONSTANT
03/19/2021
Special inspection requirement — HVAC and service water heating equipment
VLADIMIR CONSTANT
03/19/2021
Special inspection requirement — Maintenance information
VLADIMIR CONSTANT
03/19/2021
Special inspection requirement — Electrical motors
VLADIMIR CONSTANT
03/19/2021
Special inspection requirement — Shutoff dampers
VLADIMIR CONSTANT
03/05/2021
Filed — Alteration
INSTALL NEW GAS BOILER
B00292642-P4
12/14/2020
Filed — Alteration
INSTALL NEW GAS BOILER
B00292642-P3
12/09/2020
Special inspection requirement — HVAC and service water heating equipment
VLADIMIR CONSTANT
12/09/2020
Special inspection requirement — Maintenance information
VLADIMIR CONSTANT
12/09/2020
Special inspection requirement — Electrical motors
VLADIMIR CONSTANT
12/09/2020
Special inspection requirement — Shutoff dampers
VLADIMIR CONSTANT
12/09/2020
Special inspection requirement — HVAC and service water heating system controls
VLADIMIR CONSTANT
12/09/2020
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
VLADIMIR CONSTANT
12/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
VLADIMIR CONSTANT
12/09/2020
Special inspection requirement — High Temperature Hot Water Piping (Welding)
WAYNE CLARKE
11/19/2020
Filed — Alteration
INSTALL NEW GAS BOILER
B00292642-P2
10/01/2020
Filed — Alteration
INSTALL NEW GAS BOILER
B00292642-P1
08/19/2020
Permit issued — Boiler Equipment
B00292642-I1-BE
01/22/2020
Filed — Alteration
INSTALL NEW GAS BOILER
B00292642-I1
11/25/2019
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
11/25/2019
Special inspection requirement — Maintenance information
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offZONE PLUMBING & HEATING C08/16/2021
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/09/2021
DOB NOWBoiler EquipmentSigned-offZONE PLUMBING & HEATING C08/19/2020
BISMHISSUEDBRAZIL INC05/21/2019
BISEQISSUEDBRAZIL INC08/15/2018
BISPLISSUEDZARA PLUMBING CORP04/17/2018
BISPLISSUEDZARA PLUMBING CORP04/13/2018
BISMHISSUEDBRAZIL INC07/14/2017
BISEQISSUEDARSENAL SCAFFOLD INC07/13/2017
BISOTISSUEDBRAZIL INC07/12/2017
BISOTISSUEDBRAZIL INC07/12/2017
BISEQISSUEDARSENAL SCAFFOLD INC07/11/2017
BISOTISSUEDBRAZIL INC05/16/2017
BISEQISSUEDBRAZIL INC03/21/2017
BISOTISSUEDBRAZIL INC03/21/2017
BISOTISSUEDTRINCHESE CONSTRUCTION IN10/04/2016
BISEQISSUEDTRINCHESE CONSTRUCTION IN09/22/2016
1 project · most recent 03/25/2018
General Wiring
FiledStatusContractorScope
03/25/2018CompleteMECHANICAL ELECTR'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/27/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/19/2021Fire-Resistant Penetrations and JointsVLADIMIR CONSTANTspecial
03/19/2021Alternative Materials - OTCR Buildings Bulletin NumberVLADIMIR CONSTANTspecial
03/19/2021High Temperature Hot Water Piping (Welding)WAYNE CLARKEspecial
03/19/2021HVAC and service water heating system controls VLADIMIR CONSTANTenergy_progress
03/19/2021HVAC and service water heating equipment VLADIMIR CONSTANTenergy_progress
03/19/2021Maintenance informationVLADIMIR CONSTANTenergy_progress
03/19/2021Electrical motorsVLADIMIR CONSTANTenergy_progress
03/19/2021Shutoff dampersVLADIMIR CONSTANTenergy_progress
12/09/2020HVAC and service water heating equipment VLADIMIR CONSTANTenergy_progress
12/09/2020Maintenance informationVLADIMIR CONSTANTenergy_progress
12/09/2020Electrical motorsVLADIMIR CONSTANTenergy_progress
12/09/2020Shutoff dampersVLADIMIR CONSTANTenergy_progress
12/09/2020HVAC and service water heating system controls VLADIMIR CONSTANTenergy_progress
12/09/2020Alternative Materials - OTCR Buildings Bulletin NumberVLADIMIR CONSTANTspecial
12/09/2020Fire-Resistant Penetrations and JointsVLADIMIR CONSTANTspecial
12/09/2020High Temperature Hot Water Piping (Welding)WAYNE CLARKEspecial
11/25/2019Fuel-Oil Storage and Fuel-Oil Piping Systems—special
11/25/2019Maintenance information—energy_progress
11/08/2019Maintenance information—energy_progress
11/08/2019Fuel-Oil Storage and Fuel-Oil Piping Systems—special
▾Documents — 202 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Boiler Equipment7
09/02/2026B00223671-P2Request digital key ↗
09/02/2026B00292642-I1Request digital key ↗
09/02/2026B00292642-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch1
09/01/2026B00535934-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION22
09/10/2021340537841Open ↗
09/10/2021340537841Open ↗
09/10/2021340537841Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION18
05/30/2019340498394Open ↗
05/30/2019340498394Open ↗
04/05/2019340498394Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
04/12/2019321460290Open ↗
04/12/2019321454779Open ↗
03/28/2017321460290Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00292642-P3Open ↗
09/02/2026B00292642-P3Open ↗
09/02/2026B00292642-P3Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
09/12/2017321641808Open ↗
09/12/2017321641808Open ↗
09/12/2017321641808Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00535934-I1Open ↗
08/13/2026B00223671-I1Open ↗
08/13/2026B00292642-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/06/2019321460290Open ↗
06/06/2019321460290Open ↗
05/30/2019340498394Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00292642-P3Open ↗
09/02/2026B00292642-P3Open ↗
09/02/2026B00292642-P3Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/07/2017340537841Open ↗
07/12/2017340521144Open ↗
07/11/2017340521368Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/07/2017340537841Open ↗
07/12/2017340521144Open ↗
07/11/2017340521368Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
09/22/2016321454779Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/06/2016321460290Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING3
03/26/2019340498394Open ↗
09/07/2017340537841Open ↗
05/11/2017340498394Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/01/2017340537841Open ↗
09/12/2017321641808Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
09/07/2017340537841Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/05/2019340498394Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan7
08/13/2026B00292642-P1Open ↗
08/13/2026B00292642-P3Open ↗
08/13/2026B00223671-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST2
09/12/2017321641808Open ↗
10/06/2016321460290Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00535934-I1Open ↗
08/13/2026B00292642-P2Open ↗
08/13/2026B00292642-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/07/2017340537841Open ↗
07/11/2017340521368Open ↗
05/11/2017340498394Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
06/06/2019321460290Open ↗
06/06/2019321460290Open ↗
05/30/2019340498394Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/06/2019321460290Open ↗
05/30/2019340498394Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/07/2017340537841Open ↗
05/11/2017340498394Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/12/2017340521144Open ↗
▸BISNYCECC ANALYSIS1
05/11/2017340498394Open ↗
▸Inspections & Test Reports5
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION3
06/28/2019340498394Open ↗
05/16/2019321454779Open ↗
08/14/2018340521144Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/07/2017340537841Open ↗
07/11/2017340521368Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/28/2019340498394Open ↗
06/06/2019321460290Open ↗
05/16/2019321454779Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/14/2019340498394Open ↗
05/14/2019321460290Open ↗
03/27/2017321454779Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
03/27/2017321454779Open ↗
03/27/2017321460290Open ↗
03/23/2017321454779Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/12/2017321641808Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/06/2019321460290Open ↗
05/30/2019340498394Open ↗
09/12/2017321641808Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms25
▸BISBOROUGH INTAKE FORM10
09/10/2021340537841Open ↗
09/10/2021340537841Open ↗
09/10/2021340537841Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION8
09/10/2021340537841Open ↗
05/31/2019340498394Open ↗
05/23/2019340498394Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/07/2017340537841Open ↗
07/12/2017340521144Open ↗
07/11/2017340521368Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
09/12/2017321641808Open ↗
10/05/2016321460290Open ↗
09/22/2016321454779Open ↗
▸Other Documents10
▸DOB NOWDHCR Document8
08/13/2026B00223671-P2Open ↗
08/13/2026B00292642-P3Open ↗
08/13/2026B00223671-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/11/2017340498394Open ↗
▸DOB NOWHPD4: CONH Pilot Program1
08/13/2026B00535934-I1Open ↗