← Back
BuildNYC
Five to six families
1421 DEKALB AVENUE
BROOKLYN · BIN 3073578
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
4,350 sfGross Floor Area
6Units
Rent Stabilized9 Active Violations 4 likely answered ▸FDNY Report ↗
Five to six families · Owner of record: 1421 Dekalb Avenue · 2,500 sf lot · 1.74 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1421 Dekalb Ave1903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brown806/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Brown1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zone Plumbing & HeatingPlumbing307/08/2026
BrazilGeneral Contractor203/21/2026
Best Electrical MechanicalPlumbing203/21/2026
Arsenal ScaffoldGeneral Contractor207/13/2017
Trinchese ConstructionGeneral Contractor210/04/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Constant and Brown Engineering7565606/17/2021
WGC Solutions4673503/05/2021
Building Lifecycle
05/07/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/04/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
11/20/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
09/16/2025
Boiler inspection report filed
Initial · no defects · Accepted
05/01/2024
Boiler inspection report filed
Initial · no defects · Accepted
122 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offZone Plumbing & Heating08/16/2021
DOB NOWPlumbingSigned-offZone Plumbing & Heating07/09/2021
DOB NOWBoiler EquipmentSigned-offZone Plumbing & Heating08/19/2020
BISMHISSUEDBrazil05/21/2019
BISEQISSUEDBrazil08/15/2018
BISPLISSUEDZara Plumbing04/17/2018
BISPLISSUEDZara Plumbing04/13/2018
BISMHISSUEDBrazil07/14/2017
BISEQISSUEDArsenal Scaffold07/13/2017
BISOTISSUEDBrazil07/12/2017
BISOTISSUEDBrazil07/12/2017
BISEQISSUEDArsenal Scaffold07/11/2017
BISOTISSUEDBrazil05/16/2017
BISEQISSUEDBrazil03/21/2017
BISOTISSUEDBrazil03/21/2017
BISOTISSUEDTrinchese Construction10/04/2016
BISEQISSUEDTrinchese Construction09/22/2016
1 project · most recent 03/25/2018
General Wiring
FiledStatusContractorScope
03/25/2018CompleteMechanical Electr'lGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/27/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/19/2021Fire-Resistant Penetrations and JointsVLADIMIR CONSTANTspecial
03/19/2021Alternative Materials - OTCR Buildings Bulletin NumberVLADIMIR CONSTANTspecial
03/19/2021High Temperature Hot Water Piping (Welding)WAYNE CLARKEspecial
03/19/2021HVAC and service water heating system controls VLADIMIR CONSTANTenergy_progress
03/19/2021HVAC and service water heating equipment VLADIMIR CONSTANTenergy_progress
03/19/2021Maintenance informationVLADIMIR CONSTANTenergy_progress
03/19/2021Electrical motorsVLADIMIR CONSTANTenergy_progress
03/19/2021Shutoff dampersVLADIMIR CONSTANTenergy_progress
12/09/2020Alternative Materials - OTCR Buildings Bulletin NumberVLADIMIR CONSTANTspecial
12/09/2020HVAC and service water heating equipment VLADIMIR CONSTANTenergy_progress
12/09/2020Shutoff dampersVLADIMIR CONSTANTenergy_progress
12/09/2020HVAC and service water heating system controls VLADIMIR CONSTANTenergy_progress
12/09/2020Fire-Resistant Penetrations and JointsVLADIMIR CONSTANTspecial
12/09/2020High Temperature Hot Water Piping (Welding)WAYNE CLARKEspecial
12/09/2020Maintenance informationVLADIMIR CONSTANTenergy_progress
12/09/2020Electrical motorsVLADIMIR CONSTANTenergy_progress
11/11/2020High Temperature Hot Water Piping (Welding)WAYNE CLARKEspecial
11/11/2020Alternative Materials - OTCR Buildings Bulletin NumberVLADIMIR CONSTANTspecial
11/11/2020Fire-Resistant Penetrations and JointsVLADIMIR CONSTANTspecial
11/11/2020HVAC and service water heating equipment VLADIMIR CONSTANTenergy_progress
11/11/2020Electrical motorsVLADIMIR CONSTANTenergy_progress
11/11/2020Shutoff dampersVLADIMIR CONSTANTenergy_progress
11/11/2020Maintenance informationVLADIMIR CONSTANTenergy_progress
11/11/2020HVAC and service water heating system controls VLADIMIR CONSTANTenergy_progress
11/25/2019Fuel-Oil Storage and Fuel-Oil Piping Systems—special
Latest 25 of 28.
210 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account