Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBuilding 16 Renovation ProjectUnder Construction45p · 2 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Structural
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents · 7 drawing sheets
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
On file for this project
3 documents · 1 drawing sheet
Floor 5Building 16 Renovation ProjectUnder Construction37p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents
Floor 4Building 16 Renovation ProjectUnder Construction37p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents
Floor 3Building 16 Renovation ProjectUnder Construction37p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents
Floor 2Building 16 Renovation ProjectUnder Construction37p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents
Floor 1Building 16 Renovation ProjectUnder Construction43p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents · 6 drawing sheets
BasementBuilding 16 Renovation ProjectUnder Construction10p · 1 filing · 20 docs
ArchitectureDMMechanicalPlumbing
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents · 10 drawing sheets
Sub-BasementBuilding 16 Renovation ProjectUnder Construction37p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents
Site & exteriorBuilding 16 Renovation ProjectUnder Construction20p · 2 filings · 20 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sidewalk Shed · Structural
HEAVY DUTY SIDEWALK SHED DURING EXTERIOR FACADE REPAIRS FILED UNDER APPLICATION # X01208186. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents · 3 drawing sheets
REPLACEMENT OF BOILERS (FILED SEPARATELY), ASSOCIATED CONTROLS, PIPING, COMBUSTION AIR AND FLUE. REPLACEMENT OF EXISTING VENTILATING FANS, DUCTWORK AND CONTROLS
On file for this project
54 documents · 12 drawing sheets