← Back
BRONX
1422 ST LAWRENCE AVENUE
BRONX · Soundview-Bruckner-Bronx River · BIN 2028178
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MA ENGINEERING, P.C.112/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MA ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLAIRMONT LONDONElectrical103/21/2026
FA CONSTRUCTION NY INCGeneral Contractor107/08/2026
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Violation (8)Special Inspection (1)
05/06/2026
Violation issued (ECB, closed)
Construction
03/16/2026
Signed off — Alteration
APPLICATION FILING TO LEGALIZE ACCESSORY POTABLE HANDICAPPED RAMP AT FRONT OF BLDG AS TO ADDRESS ECB VIOLATION#39084133H AND 39132133L AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
X01330771-I1
03/09/2026
Permit issued — General Construction
X01330771-I1-GC
01/20/2026
Violation issued (ECB, closed)
Construction
12/25/2025
Filed — Alteration
APPLICATION FILING TO LEGALIZE ACCESSORY POTABLE HANDICAPPED RAMP AT FRONT OF BLDG AS TO ADDRESS ECB VIOLATION#39084133H AND 39132133L AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
X01330771-I1
12/08/2025
Special inspection requirement — Final
MOATEZ ALI
12/05/2024
Violation issued (ECB, closed)
Construction
10/08/2024
Violation issued (ECB, closed)
Construction
05/15/2024
Violation issued (ECB, closed)
Construction
05/15/2024
Violation issued (ECB, closed)
Construction
01/11/2024
Violation issued (ECB, closed)
Construction
04/19/2023
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFA CONSTRUCTION NY INC03/09/2026
BISOTISSUEDKAMTECH RESTORATION CORP08/25/2023
2 projects · most recent 03/24/2025
General Wiring
FiledStatusContractorScope
03/24/2025Permit IssuedCLAIRMONT ELEC'L CONTR'GGeneral Wiring
09/11/2023CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/08/2025FinalMOATEZ ALIprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01330771-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/07/2023240352710Open ↗
▸BISWORK PERMIT APPLICATION1
08/25/2023240352710Open ↗
▸Seals & Professional Certifications3
▸BISAPPLICANT OWNER SIGNATURE1
08/07/2023240352710Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01330771-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026X01330771-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
08/07/2023240352710Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/07/2023240352710Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/14/2023240352710Open ↗
08/07/2023240352710Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/14/2023240352710Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/07/2023240352710Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
11/14/2023240352710Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/14/2023240352710Open ↗
08/07/2023240352710Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL ELECTRICAL SIGNOFF1
11/15/2023240352710Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/15/2023240352710Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/14/2023240352710Open ↗
08/07/2023240352710Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/07/2023240352710Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
11/15/2023240352710Open ↗