Zoned residential, not Manhattan
1422 VYSE AVENUE
BRONX · BIN 2010731
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
Rent Stabilized1 Open Violation ▸
Zoned residential, not Manhattan · Owner of record: 1422 VYSE LLC · 2,500 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction27p · 1 filing · 20 docs
Floor 4Under Construction27p · 1 filing · 20 docs
Floor 3Under Construction23p · 1 filing · 20 docs
Floor 2Under Construction24p · 1 filing · 20 docs
Floor 1Under Construction27p · 2 filings · 20 docs
CellarUnder Construction28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REK REALTY5404/09/2026
NEW LINE CONSTRUCTION503/22/2026
N B A CONSTRUCTION103/22/2026
JCD REALTY403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/19/2024$645K—Private party → 1422 VYSE LLC— not available
06/26/2015$415K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C2B ARCHITECTS1203/21/2026
NEW LINE CONSTRUCTION103/21/2026
RAYMOND HO ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW LINE CONSTRUCTION LLCGeneral Contractor1304/09/2026
INFINITI ESC PLUMBING CORPlumbing307/08/2026
GO PRO FIRE PROTECTION CPlumbing203/22/2026
YOLAND CONSTRUCTION & METElectrical103/21/2026
AUJLA ELECTRIC CORPElectrical103/22/2026
N.B.A CONSTRUCTION INCGeneral Contractor104/09/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
CHRISTOPHER DUNLEAVYElectrical103/21/2026
NEW YORK PARK PLBG&HTG COElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PLUS355 INTEGRATED SOLUTI90261204/29/2026
Building Lifecycle
All (167)Filed (18)Permit Issued (13)Signed Off (10)Violation (26)Inspection (9)Objection (58)Special Inspection (30)Tax Incentive (3)
08/11/2026
Signed off — New Building
APPLICATION FILED FOR STRUCTURAL WORK FOR NEW 4 STORY BUILDING AS PER PLANS HERE WITHIN.
X01140122-I1
07/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2026
Special inspection requirement — Air barrier continuity plan testing
ARMIR TARAJ
06/03/2026
Special inspection requirement — Preliminary
ARMIR TARAJ
06/03/2026
Special inspection requirement — Fenestration areas
ARMIR TARAJ
06/03/2026
Special inspection requirement — Metering
ARMIR TARAJ
06/03/2026
Special inspection requirement — Concrete - Cast-In-Place
ARMIR TARAJ
06/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ARMIR TARAJ
06/03/2026
Special inspection requirement — Permanent certificate
ARMIR TARAJ
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARMIR TARAJ
06/03/2026
Special inspection requirement — Maintenance information
ARMIR TARAJ
06/03/2026
Special inspection requirement — Exterior lighting power
ARMIR TARAJ
06/03/2026
Special inspection requirement — Insulation placement and R values
ARMIR TARAJ
06/03/2026
Special inspection requirement — Interior lighting power
ARMIR TARAJ
06/03/2026
Special inspection requirement — Protection of exposed foundation insulation
ARMIR TARAJ
06/03/2026
Special inspection requirement — Air barrier - visual inspection
ARMIR TARAJ
06/03/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
ARMIR TARAJ
06/03/2026
Special inspection requirement — Fenestration air leakage
ARMIR TARAJ
06/03/2026
Special inspection requirement — Masonry
ARMIR TARAJ
06/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ARMIR TARAJ
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
ARMIR TARAJ
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
ARMIR TARAJ
05/22/2026
Objection resolved — Addressed
05/11/2026
Violation issued (HPD, open)
A
05/07/2026
Objection raised — Other
04/29/2026
Filed — New Building
APPLICATION FILED FOR STRUCTURAL WORK FOR NEW 4 STORY BUILDING AS PER PLANS HERE WITHIN.
X01140122-P4
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARMIR TARAJ
04/28/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
ARMIR TARAJ
04/28/2026
Special inspection requirement — Concrete - Cast-In-Place
ARMIR TARAJ
04/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ARMIR TARAJ
04/28/2026
Special inspection requirement — Masonry
ARMIR TARAJ
04/28/2026
Special inspection requirement — Preliminary
ARMIR TARAJ
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
ARMIR TARAJ
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
ARMIR TARAJ
04/28/2026
Special inspection requirement — Air barrier - visual inspection
ARMIR TARAJ
04/28/2026
Special inspection requirement — Maintenance information
ARMIR TARAJ
03/11/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/03/2026
Signed off — New Building
APPLICATION FILED FOR STRUCTURAL WORK FOR NEW 4 STORY BUILDING AS PER PLANS HERE WITHIN.
X01140122-S5
02/06/2026
Signed off — New Building
APPLICATION FILED FOR STRUCTURAL WORK FOR NEW 4 STORY BUILDING AS PER PLANS HERE WITHIN.
X01140122-S4
02/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/20/2026
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01138338-I1
01/13/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/17/2025
Signed off — New Building
APPLICATION FILED FOR STRUCTURAL WORK FOR NEW 4 STORY BUILDING AS PER PLANS HERE WITHIN.
X01140122-S3
12/01/2025
485-x construction completed
11/28/2025
Objection resolved — Addressed
11/24/2025
Violation issued (HPD, closed)
I
11/03/2025
Permit issued — General Construction
X01140122-I1-GC
10/29/2025
Signed off — New Building
APPLICATION FILED FOR STRUCTURAL WORK FOR NEW 4 STORY BUILDING AS PER PLANS HERE WITHIN.
X01140122-S2
10/29/2025
Permit issued — Construction Fence
X01138338-I1-FN
09/30/2025
Signed off — Alteration
This filing is for a temporary sidewalk shed. There is no change in use, occupancy or egress.
X01237787-I1
09/25/2025
Violation issued (ECB, closed)
Construction
08/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2025
Filed — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01138338-P1
08/08/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/05/2025
Filed — New Building
APPLICATION FILED FOR STRUCTURAL WORK FOR NEW 4 STORY BUILDING AS PER PLANS HERE WITHIN.
X01140122-P3
08/04/2025
Filed — New Building
APPLICATION FILED FOR STRUCTURAL WORK FOR NEW 4 STORY BUILDING AS PER PLANS HERE WITHIN.
X01140122-P2
08/04/2025
Objection raised — Other
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEW LINE CONSTRUCTION LLC11/03/2025
DOB NOWConstruction FenceSigned-offNEW LINE CONSTRUCTION LLC10/29/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR07/31/2025
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C07/15/2025
DOB NOWSidewalk ShedSigned-offN.B.A CONSTRUCTION INC06/30/2025
DOB NOWGeneral ConstructionPermit IssuedNEW LINE CONSTRUCTION LLC06/03/2025
DOB NOWMechanical SystemsSigned-offNEW LINE CONSTRUCTION LLC04/18/2025
DOB NOWStructuralSigned-offNEW LINE CONSTRUCTION LLC04/15/2025
DOB NOWFoundationSigned-offNEW LINE CONSTRUCTION LLC04/10/2025
DOB NOWEarth WorkSigned-offNEW LINE CONSTRUCTION LLC02/25/2025
DOB NOWSupport of ExcavationSigned-offNEW LINE CONSTRUCTION LLC02/20/2025
DOB NOWFull DemolitionSigned-offNEW LINE CONSTRUCTION LLC12/27/2024
DOB NOWConstruction FenceSigned-offNEW LINE CONSTRUCTION LLC12/24/2024
BISOTISSUEDJC HOME DEVELOPMENT MANAG07/16/2012
BISOTISSUEDJC HOME DEVELOPMENT MANAG03/06/2012
BISPLISSUEDPETER MICELI PLUMBING03/06/2012
1 project · most recent 04/29/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/29/2026Signed-offINFINITI ESC PLUMBING CORStorm, Water/Sanitary
2 projects · most recent 02/11/2026
General Wiring
FiledStatusContractorScope
02/11/2026CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
06/11/2025CompleteAUJLA ELECTRIC CORP—
1 project · most recent 04/29/2026
Steel Masonry
FiledStatusContractorScope
04/29/2026Permit IssuedNEW LINE CONSTRUCTION LLCSteel, Masonry
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/11/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
06/03/2026MasonryARMIR TARAJspecial
06/03/2026Protection of exposed foundation insulationARMIR TARAJenergy_progress
06/03/2026Air barrier - visual inspectionARMIR TARAJenergy_progress
06/03/2026Permanent certificateARMIR TARAJenergy_progress
06/03/2026MeteringARMIR TARAJenergy_progress
06/03/2026Fenestration areasARMIR TARAJenergy_progress
06/03/2026Interior lighting powerARMIR TARAJenergy_progress
06/03/2026Insulation placement and R valuesARMIR TARAJenergy_progress
06/03/2026Air barrier continuity plan testingARMIR TARAJenergy_progress
06/03/2026Fenestration air leakageARMIR TARAJenergy_progress
06/03/2026Maintenance informationARMIR TARAJenergy_progress
06/03/2026Exterior lighting powerARMIR TARAJenergy_progress
06/03/2026Fenestration and door U-factor and product ratingsARMIR TARAJenergy_progress
06/03/2026PreliminaryARMIR TARAJprogress
06/03/2026Fire-Resistance Rated ConstructionARMIR TARAJprogress
06/03/2026Energy Code Compliance InspectionsARMIR TARAJprogress
06/03/2026Construction Operations Influencing Adjacent StructuresARMIR TARAJspecial
06/03/2026Exterior Insulation and Finish Systems (EIFS)ARMIR TARAJspecial
06/03/2026Fire-Resistant Penetrations and JointsARMIR TARAJspecial
06/03/2026Concrete - Cast-In-PlaceARMIR TARAJspecial
04/28/2026Fenestration areasARMIR TARAJenergy_progress
04/28/2026Interior lighting powerARMIR TARAJenergy_progress
04/28/2026Insulation placement and R valuesARMIR TARAJenergy_progress
04/28/2026Permanent certificateARMIR TARAJenergy_progress
04/28/2026MeteringARMIR TARAJenergy_progress
Latest 25 of 100.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/26/2026X01222526-I1Request digital key ↗
08/21/2026X01010139-I1Request digital key ↗
08/20/2026X01106818-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
07/16/2012220171864Open ↗
03/07/2012220171864Open ↗
03/07/2012220171864Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/09/2025240360989Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/05/2012220171864Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZoning Exhibit form (1-5)4
08/14/2026X01140122-P4Open ↗
08/13/2026X01140122-P1Open ↗
08/13/2026X01140122-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/14/2026X01140122-P4Open ↗
08/13/2026X01140122-P2Open ↗
08/13/2026X01140122-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026X01140122-P1Open ↗
08/13/2026X01140122-I1Open ↗
08/13/2026X01140122-P2Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026X01222526-I1Open ↗
08/20/2026X01140132-I1Open ↗
08/18/2026X01138338-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/27/2026X01140132-P1Open ↗
09/05/2026X01140122-I1Open ↗
09/05/2026X01140122-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/27/2026X01140132-P1Open ↗
09/22/2026X01140122-S4Open ↗
09/05/2026X01140122-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/07/2012220171864Open ↗
03/05/2012220171864Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/05/2012220171864Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/05/2012220171864Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026X01106818-I1Open ↗
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X01140122-P2Open ↗
08/13/2026X01140122-P1Open ↗
08/13/2026X01140122-I1Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
02/11/2013220171864Open ↗
04/03/2012220171864Open ↗
▸BISSCHEDULE B - PLUMBING1
03/05/2012220171864Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01106818-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01106818-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01106818-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01106818-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/14/2026X01140122-P4Open ↗
08/13/2026X01140122-P1Open ↗
08/13/2026X01140122-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
08/07/2025240360989Open ↗
▸BISSTREET TREE CHECKLIST1
08/25/2025240360989Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01140122-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01140122-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01140122-I1Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/05/2012220171864Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01106818-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01106818-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY2
03/07/2012220171864Open ↗
03/05/2012220171864Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/25/2025240360989Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/05/2012220171864Open ↗
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
02/11/2013220171864Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/05/2012220171864Open ↗
▸DOB NOWSmoke/Carbon Monoxide Alarms Affidavit1
08/13/2026X01140122-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
03/05/2012220171864Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/01/2025240360989Open ↗
▸Other Documents24
▸DOB NOWProperty Ownership Certification5
08/16/2026X01140122-P2Open ↗
08/16/2026X01140122-P1Open ↗
08/16/2026X01140122-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/16/2026X01140122-I1Open ↗
08/14/2026X01140122-P4Open ↗
08/13/2026X01140122-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/14/2026X01140122-P4Open ↗
08/13/2026X01140122-P1Open ↗
08/13/2026X01140122-P2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
08/25/2025240360989Open ↗
08/25/2025240360989Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)2
08/20/2026X01140132-I1Open ↗
08/13/2026X01140132-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X01140132-S1Open ↗
08/13/2026X01140132-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01140122-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01106818-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01106818-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01106818-I1Open ↗