HPD05/19/2026§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/19/2026§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD01/27/2026§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD01/27/2026§ 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
HPD02/11/2020§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 3rd STORY
DOB10/30/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB10/30/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB10/30/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB07/31/2019INCORRECT FLUE SIZE, CHIMNEY NOT SEALED. CEASE USE WATER HEATERS, MAINTAIN BOILER; CORRECT ALL LISTED VIOLATIONS$6K due
ECB07/31/2019INCORRECT SIZE FLUE PIPING, CHIMNEY NOT SEALED, CEASE USE WATER HEATER, MAINTAIN BOILER; CORRECT ALL LISTED VIOLATIONS$6K due
ECB07/30/2019INCORRECT FLUE PIPE SIZE CHIMNEY NOT SEALED.CEASE USE WATER HEATERS, MAINTAIN BOILER; CORRECT VIOLATION$6K due
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
HPD07/15/2015§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF SHEETROCK PARTITION WALL ERECTED DECREASING THE SIZE 3RD STORY 0F PUBLIC HALL AND ENCLOSING SCUTTLE OPENING WITHIN 3 STY APARTMENT.
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB02/27/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/02/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPD08/10/2012§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD08/06/2012§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2FL, 2nd STORY, APARTMENT AT SOUTH
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
HPD04/10/2010§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 2FL, 2nd STORY
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
ECB12/04/2012FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: CELLAR CEILING/1ST FLR JOIST IN DISREPAIR, TEMPORARILY SUPPOETED BY LALLY COLUMNS.INTERIOR OF 2ND AND 3RD FLRS DEFECTIVE. WALLS SEPARATING FROM CEILINGNothing owed — awaiting certificate of correction
ECB08/04/2012FAILURE TO MAINTAIN BUILDING NOTED: AT INTERIOR PUBLIC STAIR BETWEEN 1ST & 2ND & 2ND & 3RD FLOORS SAGGING W/2ND FLOOR HALL BUCKLED & SLOPINGOFF LEVEL,BUILDING LEANING NOTICEABLY AT STREET FACING ELEVATION,OUTNothing owed — awaiting certificate of correction
ECB07/29/2010FAILURE TO MAINTAIN BLDG INTERIOR:DEFECT NOTED:CELLAR CEILING/1ST FLR JOIST IN DISREPAIR,@ EXPOSURE#4 INTERIOR WALL BEAMS ROTTED/BEAMS ROTTED WHERE SEATED ON FOUNDATION WALL,INTERIOR STAIRCASE TO CELLAR LEANINGNothing owed — awaiting certificate of correction
ECB08/06/2009SUPPORTED SCAFFOLD DOES NOT MEET BUILDING CODE SPECIFICATION. -NOTED SCAFFOLD AT EXP# 1. THERE ARE ADEQUATE TIE INS (1) ONE PLANK WORK SURFACE APPROX 9.5" THAT IS NOT SECURED AND EXTENDED OVER 18' PAST BRACE ANNothing owed — awaiting certificate of correction
ECB12/20/2002FAILURE TO MAINTAIN EXTERIOR BUILDING WALL: DEFECT IS A PIECE OF PARAPET 4'X4' MISSING FROM FRONT OF BUILDING NOTED DEFECTIVE REAR WALL, DEFECTIVE CHIMNEYS MISSING LEADERS & GUTTERS AT REAR. REMEDY: MAINTAIN EXNothing owed — awaiting certificate of correction
ECB03/18/1991OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPARTMENT REOCRDS. FROM A 2 FAMILY APARTMENT ONE EACH FLOOR 2ND AND 3RD TO 3 APARTMENT EACH FLOOR. 2ND AND 3RD. REMEDY:DISCONTINUE THE ILLEGAL OCCUPANCY ORNothing owed — awaiting certificate of correction